Summary
Overview
Work History
Education
Skills
Affiliations
Certification
Languages
Interests
Timeline
Additional Information
Generic

Marco Antonio Vazquez

Riverside,CA

Summary

To Succeed as a Senior Mechanical Supervisor or Project Management assistant and continue my Education in Project Management, achieving success and growth.

Overview

30
30
years of professional experience
1
1
Certification

Work History

HVAC CONSTRUCTION WORKER

AIR CONTROL SYSTEMS INC.
Ontario, CA
09.2020 - Current
  • HVAC CONSTRUCTION: Installation of tilt-up mechanical systems. Stage, crane RTU's, Ventilation exhaust systems. Complex mechanical sheet metal duct systems per design project. Ductwork insulation. Co-lead as needed. Quality Control & assurance.
  • Delivery driver. Temporary Warehouse worker, forklift driver loading and offloading equipment and materials.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Completed construction projects on time by adhering to strict deadlines and prioritizing tasks appropriately.
  • Conducted regular maintenance checks on tools and equipment, reducing downtime and enhancing reliability.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Operated power equipment to move materials and promote job efficiency.
  • Operated heavy machinery efficiently, ensuring timely progress on construction projects while minimizing risk of accidents or damage.
  • Enhanced project efficiency by coordinating with team members and managing resources effectively.
  • Contributed to a positive work culture by fostering teamwork among staff through open communication channels, which led to higher overall productivity levels during projects.
  • Increased safety awareness through conducting regular training sessions for staff and implementing best practices on the job site.

HVAC-Journeyman Construction Worker

Arena Staffing Agency
Ontario, CA
07.2019 - 09.2020
  • Installation of complex HVAC systems in the commercial / Industrial construction industry.
  • Tenant improvements, remodels, tilt-up HVAC Construction. RTU's, Suspended HVAC air handling equipment installation with design duct systems. Specialty stainless steel exhaust systems. Crane and set RTU's. Round and square sheet metal ducting installations per design print. Safety and quality assurance per company standards.
  • Assisted in material handling, ensuring timely delivery and organization of supplies for projects.
  • Operated heavy machinery to efficiently complete construction tasks on various job sites.
  • Collaborated with team members to execute daily project objectives, enhancing workflow efficiency and teamwork.
  • Led site teams during critical construction phases, coordinating efforts to meet project deadlines and quality standards.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.

Mechanical Foreman

Anderson Air
Fullerton, CA
10.2018 - 07.2019

Install commercial and industrial HVAC, RTU's, VAV's and DDX control systems. Detailed and order all material. Install as a team large tonnage AHU replacements, mini-split systems and zoning systems. Lead a diverse team in multiple projects to accomplish daily goals. All systems required the full completion of high and low voltage piping/wiring, controls and start-up. Install all plumbing and piping for AC units. Commercial water heater systems and chill water piping with reheat coils. Refrigeration piping and controls for walk-in freezer systems, server room chillers and start up.

  • Managed efficient teams of up to 5 employees.
  • Determined schedules and assignments of work activities for 5-member team, considering work priority, availability of equipment and skill of personnel.

Mechanical Foreman - Supervisor/Sr. Mechanical Technician

Pacific Environmental Technologies Inc
Corona, CA
04.2014 - 07.2018

As part of Management team, responsible for all Mechanical-HVAC & R Clean Room Technology, Design-built HVAC & (co-lead) General Construction operations. HVAC design Plan check, job walk, HVAC-sheet metal system design, system check per specs, detailed, jobsite design coordination and lay-out. System design bid estimating with (management team) and order all Mechanical Engineered & Designed H.V.A.C Air Distribution Systems. Performed, reviewed, checked and submitted quotes for budget. Sketched complex design drawings for subs, vendors via plan-grid when required for plan check and verification purposes. Quality Assurance on all HVAC&R Designed and Engineered Systems to meet or exceed building design codes and construction specifications required on Specialty Projects in the Aerospace, Pharmaceutical and Research Industry. Team Organizational meetings; regarding Safety meetings, job duties & responsibilities, design field layouts, weekly scheduled production accountability and job-site coordinating. Project Safety Coordinator; conducted weekly safety meetings per company safety standards. Quality Control & Customer Assurance. Communicated company goals, standards, and project expectations to team. Lead team Sr. foreman, foreman, lead personnel on site HVAC projects. Interim HVAC-H.R. duties; employee hiring, oversee employee code of conduct, and disciplinary measures taken. Performed mid and yearly employee evaluation review for H.R.Management. Assisted as a Labor Worker in all General Design built Construction projects such as: Structural steel/wood/metal framing, assembled/built clean rooms, built specifically designed air handling units in shop per engineered design. Built specialty ceiling systems with overall sealed finish. Co-designed, fabricated, and installed specialty stainless steel, filter box casings. Installed specialty S.S. HEPA filtration systems, lights, ceilings, FRP-wall paneling systems for all Clean Room classifications required. Team assisted and collaborated in all aspects of the construction. HVAC-Design Layout; modifications of internal HVAC & R equipment, specialty material applications. Design-take off, stage, fabricate and Install specialty custom stainless products per Mechanical specs, codes, and General Construction Design plan.

  • Determined schedules and assignments of work activities for 10-member team, considering work priority, availability of equipment and skill of personnel.
  • Managed efficient teams of up to 10 employees.
  • Oversaw daily operations of mechanical teams, ensuring adherence to safety protocols and quality standards.
  • Mentored junior technicians, enhancing skill sets and promoting a culture of continuous improvement.
  • Implemented process improvements that increased operational efficiency and reduced downtime across projects.
  • Conducted regular training sessions on best practices for mechanical assembly and repair techniques.
  • Managed inventory control processes, ensuring availability of necessary tools and parts for ongoing projects.
  • Collaborated with project managers to align mechanical operations with project timelines and deliverables.
  • Evaluated team performance metrics, identifying areas for improvement and implementing corrective actions as needed.
  • Mentored junior staff members, providing guidance on best practices and fostering professional growth through targeted feedback.
  • Prioritized safety, conducting regular inspections to ensure compliance with industry standards and regulations.
  • Championed quality control measures, regularly reviewing workmanship to maintain the highest standards of excellence in all projects.
  • Enhanced team productivity with comprehensive training programs and hands-on supervision.
  • Streamlined communication between departments by establishing clear channels for updates and progress reports throughout project lifecycles.
  • Empowered employees to become more self-sufficient by delegating tasks appropriately and providing ample opportunities for skill development.
  • Contributed to project planning efforts, offering valuable insights into material selection, labor needs, and timeline development based on extensive experience in the field.
  • Advanced operational efficiency by identifying redundancies within processes and suggesting impactful improvements grounded in practical considerations.
  • Enhanced workplace morale by cultivating a positive environment that encouraged collaboration, open dialogue, and mutual respect among all team members.
  • Collaborated with project teams to deliver timely, high-quality results within budget parameters.
  • Optimized resource allocation, managing personnel assignments based on skills and workload requirements.
  • Performed comprehensive evaluations of potential new hires'' technical abilities during the recruitment process to ensure optimal staffing decisions were made.
  • Developed strong relationships with suppliers, negotiating favorable pricing terms while ensuring a continuous supply of materials and components.
  • Promoted workplace safety by examining tools and equipment and providing employee safety training to prevent unsafe conditions.
  • Determined schedules and assignments of work activities for 10–12-member team, considering work priority, availability of equipment and skill of personnel.

HVAC Foreman

K & S Air
Anaheim, CA
07.2015 - 04.2016
  • Install commercial HVAC in commercial/T.I. applications. Detail, take off and order all mechanical related systems. Install low voltage wiring, stats and smoke detectors, crane rigging, layout and set equipment. Coordinate and revise design change to G.C. Air balance evaluation and performance on all HVAC systems.
  • Supervised daily operations, ensuring compliance with safety protocols and quality standards.
  • Managed team workflows, optimizing task assignments to enhance productivity and efficiency.
  • Trained new staff on equipment use, safety procedures, and company policies to foster skill development.
  • Conducted regular inspections of work sites, identifying hazards and implementing corrective measures promptly.
  • Collaborated with management to develop project timelines and allocate resources effectively.
  • Facilitated communication between crew members, promoting teamwork and resolving conflicts efficiently.
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Enhanced team productivity by providing clear direction, setting expectations, and offering constructive feedback.
  • Conducted thorough quality control checks to ensure high standards of workmanship across all projects.
  • Developed strong relationships with clients, subcontractors, and suppliers, fostering open communication channels for smooth project execution.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Collaborated with project managers in planning stages, advising on schedule adjustments and potential obstacles.
  • Enhanced team productivity by coordinating daily tasks and optimizing workflows.

Lead Mechanical Foreman

Pacific Environmental Technologies
Corona, CA
06.2014 - 06.2015

HVAC & R installations in the Clean room Technology Industry.

Performed HVAC & R system layout, take off and order material. Lead team to achievable daily/ weekly mechanical goals. Install system control wiring, electrical, piping.

  • Supervised installation and maintenance of mechanical systems to ensure operational efficiency.
  • Coordinated workflow among teams to enhance productivity and meet project deadlines.
  • Implemented process improvements that reduced downtime and optimized resource utilization.
  • Conducted regular inspections to ensure compliance with safety regulations and standards.
  • Collaborated with management to strategize project execution based on resource availability.
  • Mentored junior staff members, providing guidance on best practices and fostering professional growth through targeted feedback.
  • Increased efficiency by implementing streamlined workflows and troubleshooting mechanical issues.
  • Championed quality control measures, regularly reviewing workmanship to maintain the highest standards of excellence in all projects.
  • Supported cross-functional initiatives that required expertise in both mechanical systems design as well as installation oversight.
  • Empowered employees to become more self-sufficient by delegating tasks appropriately and providing ample opportunities for skill development.
  • Contributed to project planning efforts, offering valuable insights into material selection, labor needs, and timeline development based on extensive experience in the field.
  • Advanced operational efficiency by identifying redundancies within processes and suggesting impactful improvements grounded in practical considerations.

HVAC Installer

Tradesmen International
Inland Empire, CA
01.2013 - 01.2014
  • Installed HVAC systems according to specifications and safety standards.
  • Collaborated with team members to streamline installation processes.
  • Enhanced customer satisfaction through effective communication and service quality.
  • Implemented process improvements that reduced installation time significantly.
  • Led projects ensuring compliance with industry regulations and standards.
  • Assembled air ducts, pipes, discharge valves, and flues to central heating and cooling equipment.
  • Maintained a clean, organized workspace during installations and repairs, demonstrating respect for clients'' properties and minimizing disruptions.
  • Ensured top-quality installations by adhering to local building codes, manufacturer specifications, and industry best practices.
  • Collaborated effectively with architects, engineers, electricians, and other construction professionals during large-scale projects, ensuring smooth coordination and successful outcomes.

Journeyman Installer/Foreman

Christian Brothers Mechanical Inc
Inland Empire, CA
09.2012 - 09.2013
  • Install HVAC-mechanical systems for the industrial and commercial industry, Included; T-I work, re-ducting existing mechanical building plans. Foreman duties: job walks, detail/layout, take-off and order materials.
  • Developed customized solutions for unique installation challenges faced at different job sites.
  • Ensured timely completion of tasks, resulting in increased overall productivity for the team.
  • Conducted regular safety briefings with fellow installers to ensure compliance with workplace guidelines.
  • Read and interpreted blueprints, sketches, and specifications to ascertain job requirements.
  • Managed inventory levels for tools and materials, ensuring availability for ongoing projects without excess waste.
  • Conducted thorough quality control checks to ensure high standards of workmanship across all projects.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Raised overall crew proficiency with ongoing skill development initiatives targeting areas identified for improvement.
  • Developed robust quality control system, significantly reducing rework and customer complaints.

Sheet Metal Installer

Pacific Rim Mechanical Inc
Orange, CA
06.2011 - 01.2012
  • Install HVAC mechanical complex systems for the pharmaceutical, research and aerospace industry. Installed large square, round and flexible materials, crane rigging and set heavy mechanical equipment.
  • Collaborated with team members to execute HVAC system installations efficiently.
  • Installed sheet metal ducts, ensuring precision and adherence to specifications.
  • Conducted inspections of completed work for quality assurance and compliance standards.
  • Mentored junior installers, fostering skill development and knowledge sharing.
  • Decreased material waste by effectively utilizing available resources during sheet metal fabrication and installation tasks.
  • Maintained a clean and organized work environment, promoting efficiency in the execution of daily tasks related to sheet metal installations.
  • Collaborated closely with other team members to ensure seamless coordination during sheet metal installation processes.
  • Identified potential issues early in the installation process, allowing for prompt resolution before impacting overall project timelines or budgets.
  • Performed quality control checks on installed sheet metal, ensuring adherence to specifications and identifying potential issues for immediate remediation.
  • Contributed to successful project outcomes by accurately interpreting blueprints and specifications for each job.
  • Maximized safety on job sites by consistently following proper handling techniques and wearing protective gear during sheet metal installation tasks.

Lead Journeyman-Foreman

High-Tech AC-Service Inc
San Diego, CA.
01.2009 - 01.2011
  • Install new HVAC&R systems in the custom design home building residential industry Installation practices: new design custom built ductwork, metal, piping, flexible and specialty ventilation systems.
  • Supervised installation and maintenance of HVAC systems, ensuring optimal performance and compliance with industry standards.
  • Collaborated with management to develop budget plans for equipment upgrades and repairs, optimizing resource allocation.
  • Collaborated effectively with multidisciplinary teams to achieve project goals and ensure smooth operations on job sites.
  • Incorporated sustainable practices into daily operations to reduce environmental impact without compromising quality.
  • Established strong relationships with clients through clear communication, transparency, and professionalism.
  • Led diverse teams of skilled professionals through challenging projects while maintaining a positive working environment.
  • Consistently exceeded client expectations by delivering high-quality workmanship and adhering to industry standards.
  • Safeguarded company reputation by maintaining strict adherence to industry regulations and ethical guidelines in all tasks performed.
  • Coordinated effectively with colleagues to complete complex projects within tight deadlines.
  • Continually reviewed performance metrics against benchmarks, identifying areas for improvement and implementing necessary changes.
  • Championed workplace safety initiatives, resulting in fewer accidents and increased awareness among team members.
  • Developed advanced technical skills through ongoing training programs and workshops to stay current in the field.
  • Read and interpreted drawings, plans and specifications to complete projects accurately.
  • Assisted with post-construction cleanup and maintenance.
  • Loaded and carried materials to facilitate transport at construction sites.
  • Provided excellent customer service and answered questions related to project timelines and costs.
  • Coordinated with subcontractors and other stakeholders to complete projects on time.
  • Prepared and applied construction materials to build structures or fill gaps.
  • Conducted quality control of materials used in construction.

Sheet Metal /Worker-Journeyman

Pacific Rim Mechanical Inc
San Diego, CA
02.2007 - 10.2008
  • Install commercial and Industrial HVAC systems in new construction, remodels, and tenant and Improvement.
  • Fabricated and installed sheet metal components according to precise specifications.
  • Interpreted blueprints and technical drawings to ensure accuracy in production processes.
  • Used rulers, squares and scribes to measure and mark dimensions and reference lines on materials.
  • Fastened joints and seams together to assemble components into sheet metal products.
  • Improved project efficiency by accurately measuring, cutting, and assembling sheet metal components.
  • Enhanced workplace safety through proper use of tools and equipment during fabrication tasks.
  • Completed projects on time by effectively prioritizing tasks and maintaining focus on work progress.
  • Reduced material waste with precise measurements and optimal layout planning for sheet metal cutting.
  • Ensured high-quality workmanship by thoroughly inspecting finished products for alignment and compliance with specifications.
  • Observed safety practices and procedures to maintain safe and clean working environment.
  • Participated in regular team meetings, providing valuable input and feedback for continuous process improvement initiatives.
  • Increased customer satisfaction by delivering high-quality sheet metal products with exceptional attention to detail.
  • Custom-designed and fabricated sheet metal components for specialized industrial applications, meeting unique client specifications.

Lead Journeyman

Atlas Mechanical Inc
San Diego, CA
06.2003 - 12.2006

Install HVAC Systems for commercial TI remodels. Light commercial industry HVAC&R in residential public work housing industry. Installation included: all new system layout, set equipment, leak test ducting systems for quality assurance. HVAC&R installation in custom home building, built in accordance with customer's preference.

  • Supervised installation and maintenance of HVAC systems ensuring compliance with safety standards.
  • Conducted regular quality inspections to ensure adherence to industry regulations and customer specifications.
  • Consistently exceeded client expectations by delivering high-quality workmanship and adhering to industry standards.
  • Safeguarded company reputation by maintaining strict adherence to industry regulations and ethical guidelines in all tasks performed.
  • Continually reviewed performance metrics against benchmarks, identifying areas for improvement and implementing necessary changes.
  • Championed workplace safety initiatives, resulting in fewer accidents and increased awareness among team members.
  • Collaborated effectively with multidisciplinary teams to achieve project goals and ensure smooth operations on job sites.
  • Enhanced team productivity by implementing efficient work processes and time management strategies.
  • Established strong relationships with clients through clear communication, transparency, and professionalism.
  • Improved safety standards with regular inspections, training sessions, and timely maintenance of equipment.
  • Coordinated effectively with colleagues to complete complex projects within tight deadlines.
  • Developed advanced technical skills through ongoing training programs and workshops to stay current in the field.
  • Read and interpreted drawings, plans and specifications to complete projects accurately.
  • Completed daily, weekly, and monthly checklists on building equipment to maintain records of scheduled maintenance procedures.
  • Inspected completed projects to meet customer expectations.
  • Developed safe and efficient workflows for construction projects.

Sheet Metal Journeyman

Pacific Rim Mechanical
San Diego, CA
02.2002 - 06.2003
  • Install HVAC mechanical in commercial and industrial new construction.
  • Install VAV's, water source chillers, air handling units, fire dampers, duct mate ductwork systems and crane/rig all large equipment.
  • Fabricated and assembled sheet metal components for HVAC systems according to specifications.
  • Collaborated with cross-functional teams to enhance project workflows and resolve technical issues.
  • Implemented process improvements that increased efficiency in production and reduced material waste.
  • Conducted quality inspections to ensure adherence to industry standards and client requirements.
  • Increased client satisfaction by addressing concerns promptly, collaborating effectively with team members to find solutions.
  • Stayed up-to-date on the latest advancements in sheet metal techniques and materials through regular attendance at industry conferences and workshops.
  • Maximized project success by coordinating with HVAC technicians during the installation process of air conditioning systems.
  • Maintained a safe work environment by adhering to OSHA guidelines and implementing appropriate safety measures during projects.

HVAC Lead - Journeyman, Interim Foreman

Prestige Air Conditioning Inc
San Diego, CA
08.2001 - 02.2002
  • Instructed job tasks to employees, as needed, set weekly schedule, detail/layout and order all HVAC job related materials.
  • Supervised installation and maintenance of HVAC systems, ensuring compliance with safety standards.
  • Trained and mentored junior technicians, enhancing team skills and performance.
  • Developed and implemented process improvements for increased operational efficiency.
  • Coordinated project schedules, optimizing resource allocation and minimizing downtime.
  • Conducted quality control inspections on completed installations, maintaining high service standards.
  • Managed inventory levels for parts and equipment, reducing costs through effective procurement strategies.
  • Collaborated with management to develop training programs aligned with industry best practices.
  • Resolved complex technical issues, providing expert guidance to team members during challenging projects.
  • Delivered cost-effective solutions by analyzing project requirements and utilizing innovative techniques where appropriate.
  • Mentored junior journeymen, providing guidance on best practices and fostering professional growth.
  • Championed workplace safety initiatives, resulting in fewer accidents and increased awareness among team members.
  • Collaborated effectively with multidisciplinary teams to achieve project goals and ensure smooth operations on job sites.
  • Consistently exceeded client expectations by delivering high-quality workmanship and adhering to industry standards.

P.W. Journeyman Installer

Industrial Commercial Systems Inc
Vista
02.2001 - 08.2001
  • Install HVAC systems in the commercial and industrial industry.
  • Crane and set equipment, install sheet metal ducting systems per design print.
  • Co-lead personnel in a custom-built design residential project.
  • Overcoming and succeeding difficult challenges and changes in project design.
  • Sheet metal design layout and fabrication onsite, to meet customer's-built preferences and expectations.
  • Install H.V.A.C equipment, VAV systems, RTU's, water source Heat Pumps in new design built Clean-room Construction.
  • Reduced equipment downtime by performing thorough preventative maintenance checks on all installed systems.
  • Read and interpreted blueprints, sketches, and specifications to ascertain job requirements.
  • Enhanced safety protocols by adhering to industry standards and best practices during installations.

HVAC Installer

South Bay Mechanical Systems
San Diego, CA
06.1996 - 01.2001
  • Installed HVAC systems according to specifications and safety standards.
  • Diagnosed and resolved equipment malfunctions efficiently.
  • Trained junior installers on best practices and safety protocols.
  • Collaborated with team members to streamline installation processes.
  • Conducted routine maintenance checks on installed systems for optimal performance.
  • Enhanced customer satisfaction through effective communication and service quality.
  • Implemented process improvements that reduced installation time significantly.
  • Led projects ensuring compliance with industry regulations and standards.
  • Assembled air ducts, pipes, discharge valves, and flues to central heating and cooling equipment.
  • Removed old equipment from customers' homes and cleaned up areas to prepare for new installations.
  • Maintained a clean, organized workspace during installations and repairs, demonstrating respect for clients'' properties and minimizing disruptions.
  • Located and marked pipe positions, hole passages, and duct connections in walls and floors.
  • Promoted workplace safety by consistently following established protocols and diligently wearing appropriate personal protective equipment.
  • Installed components to improve HVAC system performance.
  • Facilitated seamless transitions from older HVAC systems to newer models through expert removal of existing equipment and precise installation of replacements.
  • Ensured top-quality installations by adhering to local building codes, manufacturer specifications, and industry best practices.
  • Provided outstanding customer service throughout the entire project lifecycle, from initial consultation to final walkthroughs after completion of installations.
  • Connected heating or air conditioning equipment to water, fuel, or refrigerant sources to form complete circuits.
  • Collaborated effectively with architects, engineers, electricians, and other construction professionals during large-scale projects, ensuring smooth coordination and successful outcomes.
  • Utilized pressure gauges and soap-and-water solutions to test pipe and tubing joints for leaks.
  • Assisted customers in understanding complex technical information about their HVAC systems by explaining concepts in accessible language tailored to individual needs.
  • Discussed heating and cooling system malfunctions with customers to isolate problems and verify corrected malfunctions.
  • Improved HVAC system efficiency by conducting thorough inspections and identifying areas requiring maintenance or repair.
  • Advanced professional development with continued education in the latest HVAC technologies and techniques to stay current in the field.
  • Supervised and instructed assistants.

Education

Construction Management (COLLEGE) -

R.C.C.D. - NORCO COLLEGE
Norco, CA
05-2026

GED - undefined

Norwalk La Mirada adult Ed.
Norwalk, CA
06-2012

Skills

  • Refrigeration
  • HVAC/R
  • Mechanical troubleshooting
  • Electrical experience
  • Plumbing
  • Ammonia refrigeration
  • Service technician experience
  • Mechanical knowledge
  • Customer service
  • Drywall
  • Roofing
  • Facilities maintenance
  • Driving

Affiliations

Restored Church Worldwide - Inland empire, CA.

Certification

  • EPA - CLASS I I June 2012 to Present CASCO - Inland Empire, CA.
  • Valid Drivers License April 2025 to May 2030 California Drivers
  • EPA certification to handle refrigerants
  • A valid state HVAC technician license

Languages

Spanish
Full Professional

Interests

  • Fundraising Events
  • Volunteer Work
  • Youth mentor, providing guidance and support to empower the next generation of leaders
  • Getting involved in local advocacy groups to promote positive change in the community
  • Offering time and support to shelters for the homeless, women, and animals
  • I enjoy sketching and drawing, which helps improve my creativity and attention to detail
  • Drawing and Painting
  • Music
  • Crafting and DIY Projects

Timeline

HVAC CONSTRUCTION WORKER

AIR CONTROL SYSTEMS INC.
09.2020 - Current

HVAC-Journeyman Construction Worker

Arena Staffing Agency
07.2019 - 09.2020

Mechanical Foreman

Anderson Air
10.2018 - 07.2019

HVAC Foreman

K & S Air
07.2015 - 04.2016

Lead Mechanical Foreman

Pacific Environmental Technologies
06.2014 - 06.2015

Mechanical Foreman - Supervisor/Sr. Mechanical Technician

Pacific Environmental Technologies Inc
04.2014 - 07.2018

HVAC Installer

Tradesmen International
01.2013 - 01.2014

Journeyman Installer/Foreman

Christian Brothers Mechanical Inc
09.2012 - 09.2013

Sheet Metal Installer

Pacific Rim Mechanical Inc
06.2011 - 01.2012

Lead Journeyman-Foreman

High-Tech AC-Service Inc
01.2009 - 01.2011

Sheet Metal /Worker-Journeyman

Pacific Rim Mechanical Inc
02.2007 - 10.2008

Lead Journeyman

Atlas Mechanical Inc
06.2003 - 12.2006

Sheet Metal Journeyman

Pacific Rim Mechanical
02.2002 - 06.2003

HVAC Lead - Journeyman, Interim Foreman

Prestige Air Conditioning Inc
08.2001 - 02.2002

P.W. Journeyman Installer

Industrial Commercial Systems Inc
02.2001 - 08.2001

HVAC Installer

South Bay Mechanical Systems
06.1996 - 01.2001

GED - undefined

Norwalk La Mirada adult Ed.

Construction Management (COLLEGE) -

R.C.C.D. - NORCO COLLEGE

Additional Information

  • Authorized to work in the US for any employer
  • SKILLS: 32 plus years of H.V.A.C.& R. - Mechanical Residential, Commercial, and Industrial construction experience. Engineered HVAC design system take-off, design improvision for budgeting purposes, material bid-estimating. Communication and writing skill experience, basic computer skill; Microsoft office and word, excel entry level and emailing. Structural framing: Steel, strut metal and wood designs. High & low voltage electrical experience. Mechanical and plumbing Piping. Low voltage wiring and controls. Experience in basic concrete form setting and finishes such as site cut-out-holes clean. Clean rooms: System wall paneling. FRP- paneling, Specialty design and fabrication of Stainless-Steel metals. Construction labor technician, demolition worker. Set finish technician: specialty sealant, specialty wood trim work, lighting, All clean-room classifications, specialty HEPA installations, filter finish installer, and Quality assurance.
Marco Antonio Vazquez