Summary
Overview
Work History
Education
Skills
Certification
References
Languages
Timeline
Generic

Marc Sirard

St Catharines,ON

Summary

Experienced tradesperson prepared for this role. Skilled in welding, cutting, and assembling metal structures. Strong focus on team collaboration and achieving results. Reliable and adaptable with changing needs. Known for precision, problem-solving, and safety compliance.

Overview

17
17
years of professional experience
1
1
Certification

Work History

Fitter/Welder

JL Metals Inc
07.2024 - Current
  • Operated and maintained precision fitting tools to ensure accurate assembly of components.
  • Interpreted engineering drawings and specifications to execute complex fitting tasks.
  • Collaborated with team members to enhance workflow efficiency and reduce downtime.
  • Conducted quality inspections on finished products, ensuring compliance with industry standards.
  • Trained junior fitters on best practices for tool handling and safety protocols.

Fitter

Steelcon Group/Sin Structures
08.2023 - 05.2024
  • Increased workplace safety by adhering to strict guidelines and protocols during daily operations.
  • Laid out, positioned, aligned and secured parts for welding and bolt-up.
  • Applied strong problem-solving skills to address unexpected challenges that arose during the fitting process.
  • Ensured accuracy of final product dimensions by diligently verifying measurements against project specifications.
  • Supported a positive work environment by fostering collaboration, sharing knowledge, and assisting peers as needed.
  • Improved overall project completion time through proficient use of hand tools, power tools, and specialized machinery.
  • Maximized tool lifespan through proper care and maintenance procedures resulting in reduced replacement costs.
  • Assisted in training new employees, sharing technical knowledge and best practices for efficient operations.

Fitter/Welder

South Central Industrial
02.2022 - 07.2023
  • Increased workplace safety by adhering to strict guidelines and protocols during daily operations.
  • Laid out, positioned, aligned and secured parts for welding and bolt-up.
  • Measured, marked, cut, bored, fitted and installed various piping or structural components in accordance with blueprints and job specifications using hand and power tools.
  • Applied strong problem-solving skills to address unexpected challenges that arose during the fitting process.
  • Ensured accuracy of final product dimensions by diligently verifying measurements against project specifications.
  • Improved overall project completion time through proficient use of hand tools, power tools, and specialized machinery.

Fitter

H&H Manufacturing
01.2021 - 01.2022
  • Increased workplace safety by adhering to strict guidelines and protocols during daily operations.
  • Laid out, positioned, aligned and secured parts for welding and bolt-up.
  • Applied strong problem-solving skills to address unexpected challenges that arose during the fitting process.
  • Ensured accuracy of final product dimensions by diligently verifying measurements against project specifications.
  • Supported a positive work environment by fostering collaboration, sharing knowledge, and assisting peers as needed.

Fitter/Welder

Direct Equipment
06.2018 - 01.2021
  • Increased workplace safety by adhering to strict guidelines and protocols during daily operations.
  • Laid out, positioned, aligned and secured parts for welding and bolt-up.
  • Applied strong problem-solving skills to address unexpected challenges that arose during the fitting process.
  • Ensured accuracy of final product dimensions by diligently verifying measurements against project specifications.
  • Maximized tool lifespan through proper care and maintenance procedures resulting in reduced replacement costs.

Iron Worker

Scott Steel
04.2014 - 01.2018
  • Air Canada Hangar 5 Project
  • Rocanville Potash Mine Project
  • Baffin Island Airport Project Duties included: -Connecting steel -Fill in bolts -Decking -Cladding -Roofing -Lead small cladding/roofing crews -Supervised junior workers -Perfect Safety Record

Iron Worker

Mac Buildings
04.2013 - 04.2014
  • Fort McMurray Bus Station Project
  • Etobicoke Recycling Plant Project REFERENCES: Available upon request Duties included: -Connecting steel -Fill in bolts -Decking -Cladding -Roofing

Iron Worker

Maple leaf Buildings
06.2008 - 04.2013
  • 25+ Various Projects

Education

Advanced Welding Techniques -

Structural Welder Training Program
03.2018

Grade 12 competed -

Jean Vanier High School
01.2002

Skills

  • Cutting and grinding
  • Hand and power tools
  • Precision measuring tools
  • Material prepping
  • Welding techniques

  • Parts fabrication
  • Welding
  • Machinery operation
  • Blueprint interpretation
  • Blueprint reading

Certification

  • FCAW/MCAW Ticket 4G
  • SMAW Ticket 1G
  • Oxy-Fuel Cutting & Safety Certificate
  • Blue Print Reading & Weld Symbols Certificate
  • WHMIS
  • Construction Safety Training System Certificate
  • Online and Practical CPR Training
  • Fall protection Ticket (Expired)
  • Elevated Work Platform Ticket (Expired)
  • Working At Heights Ticket (Expired)
  • Suspended Access Training Program (Expired)
  • H2S Alive (Expired)
  • Rough Terrain Forklift Course (Expired)

References

Scott David, Plant Manager at Steelcon Group 365-440-2893

Nick Pantin, Shop Forman at South Central Industrial 905-324-7142

Languages

English
French

Timeline

Fitter/Welder

JL Metals Inc
07.2024 - Current

Fitter

Steelcon Group/Sin Structures
08.2023 - 05.2024

Fitter/Welder

South Central Industrial
02.2022 - 07.2023

Fitter

H&H Manufacturing
01.2021 - 01.2022

Fitter/Welder

Direct Equipment
06.2018 - 01.2021

Iron Worker

Scott Steel
04.2014 - 01.2018

Iron Worker

Mac Buildings
04.2013 - 04.2014

Iron Worker

Maple leaf Buildings
06.2008 - 04.2013

Grade 12 competed -

Jean Vanier High School

Advanced Welding Techniques -

Structural Welder Training Program
Marc Sirard