Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Manuel Malungo

Edmonton,AB

Summary

With a proven track record at Raywalt Construction, I excel in heavy equipment operation and worksite safety, demonstrating a strong ability to enhance project efficiency and foster team productivity. My expertise includes conducting equipment inspections and leveraging both technical skills and a commitment to safety to achieve superior project outcomes.

Overview

5
5
years of professional experience

Work History

Equipment Operator

Raywalt Construction
05.2024 - 10.2024
  • Operated range of heavy equipment on regular basis with advanced skill.
  • Maintained and cleaned equipment after each job and inspected.
  • Operated machining equipment safely with team of operators.
  • Ensured safe working environment through adherence to safety guidelines and protocols for equipment operation.
  • Completed minor repairs and replacements of equipment parts to restore functionality.
  • Assisted in training new operators, providing guidance on proper equipment usage and safety procedures.
  • Trained in diverse pieces of equipment and useful attachments to handle team needs.
  • Drove vehicles to and from work sites and maintained clean driving record.

Pipeline Laborer

Strike Group
01.2021 - 11.2023
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Expanded skill set through continuous learning of new techniques, tools, and equipment related to laborer tasks.
  • Improved worksite efficiency by maintaining clean and organized work areas.
  • Performed general housekeeping and cleaning tasks.
  • Contributed to successful completion of projects by following instructions from supervisors and adapting to changing priorities.
  • Promoted a positive work environment by demonstrating strong teamwork and communication skills.
  • Demonstrated flexibility with shifting responsibilities based on project needs, contributing to overall productivity levels.
  • Maintained high-quality workmanship through attention to detail and adherence to industry standards.
  • Assisted with the transportation and loading/unloading of materials onto trucks for efficient movement between job sites.
  • Contributed to successful project completion by maintaining clean and organized work areas.
  • Laid out materials for efficient project work.
  • Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
  • Optimized workflow efficiency by performing routine equipment checks, maintenance, and repairs as needed.
  • Supported team productivity by assisting with excavation, trenching, and backfilling activities as needed.
  • Ensured accurate placement of pipelines through careful measurement and alignment tasks.
  • Signaled equipment operators to align machinery.
  • Enhanced pipeline safety by conducting regular inspections and maintenance tasks.
  • Followed correct reporting procedures for safety concerns and incidents.
  • Developed strong working relationships with colleagues, fostering a positive team environment conducive to achieving success on pipeline construction projects.
  • Assisted in the installation and repair of various pipeline systems, resulting in fewer leaks and enhanced system performance.
  • Demonstrated versatility by supporting multiple aspects of pipeline construction, including welding, pipe bending, coating application, and hydrostatic testing procedures.
  • Reduced environmental impact by implementing best practices for erosion control and spill prevention measures.
  • Performed repairs on [Type] pipelines.
  • Expanded skillset through continuous professional development opportunities such as attending trainings or obtaining relevant certifications related to the field.
  • Improved project efficiency by ensuring timely delivery of materials and equipment to job sites.
  • Promoted a culture of safety awareness among crew members through participation in regular safety meetings and trainings sessions.
  • Minimized downtime during construction projects through proactive problem-solving skills in addressing potential issues before they escalated.
  • Facilitated clear communication between crew members to ensure smooth coordination of tasks throughout pipeline construction projects.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Filled pipe systems with water and air to determine location of leaks.

Pipeline Laborer

A&B Pipeline
06.2019 - 12.2020
  • Assisted with the transportation and loading/unloading of materials onto trucks for efficient movement between job sites.
  • Contributed to successful project completion by maintaining clean and organized work areas.
  • Laid out materials for efficient project work.
  • Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
  • Optimized workflow efficiency by performing routine equipment checks, maintenance, and repairs as needed.
  • Supported team productivity by assisting with excavation, trenching, and backfilling activities as needed.
  • Ensured accurate placement of pipelines through careful measurement and alignment tasks.
  • Signaled equipment operators to align machinery.
  • Enhanced pipeline safety by conducting regular inspections and maintenance tasks.
  • Followed correct reporting procedures for safety concerns and incidents.
  • Assisted in the installation and repair of various pipeline systems, resulting in fewer leaks and enhanced system performance.
  • Demonstrated versatility by supporting multiple aspects of pipeline construction, including welding, pipe bending, coating application, and hydrostatic testing procedures.
  • Reduced environmental impact by implementing best practices for erosion control and spill prevention measures.
  • Performed repairs on existing pipelines.
  • Performed repairs on pipelines.
  • Performed repairs on [Type] pipelines.
  • Improved project efficiency by ensuring timely delivery of materials and equipment to job sites.
  • Promoted a culture of safety awareness among crew members through participation in regular safety meetings and trainings sessions.
  • Assisted in the planning and execution of pipeline construction projects, ensuring that project goals were met or exceeded.
  • Expanded skillset through continuous professional development opportunities such as attending trainings or obtaining relevant certifications related to the field.
  • Developed strong working relationships with colleagues, fostering a positive team environment conducive to achieving success on pipeline construction projects.
  • Minimized downtime during construction projects through proactive problem-solving skills in addressing potential issues before they escalated.
  • Facilitated clear communication between crew members to ensure smooth coordination of tasks throughout pipeline construction projects.
  • Maintained accurate records on project progress through detailed data entry into company databases or spreadsheets for management review purposes.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Cut and drilled holes in walls to permit passage of pipes.
  • Operated drill motors, grinders, chop saws, hack saws, and burning torches to perform tasks.
  • Measured, threaded, and cut materials to correct angles.
  • Used clamps and brackets to attach pipes to walls, structures and fixtures.

Education

Associate of Arts - Public Administration

Seneca College
East York, ON
01-2013

Skills

  • Heavy Equipment Operation
  • Worksite safety
  • Skid steer operation
  • Equipment Inspections

Languages

English
Full Professional

Timeline

Equipment Operator

Raywalt Construction
05.2024 - 10.2024

Pipeline Laborer

Strike Group
01.2021 - 11.2023

Pipeline Laborer

A&B Pipeline
06.2019 - 12.2020

Associate of Arts - Public Administration

Seneca College
Manuel Malungo