Summary
Overview
Work History
Education
Skills
Timeline
Generic

Malika Imambayeva

Sudbury,ON

Summary

Mine Planner with underground and open pit mining experience, specializing in mine design, scheduling, and optimization. Expertise includes pit optimization, life-of-mine (LOM) planning, budgeting, pit and waste dump design, stope reconciliation, and data analysis. Skilled in drill and blast design for long-hole stoping, development of monthly and weekly mine plans, as well as end-of-month and end-of-year reporting and reconciliation.

Overview

11
11
years of professional experience

Work History

Mining EIT

Vale, Creighton Mine
05.2023 - Current
  • Produced drill and blast designs for long-hole stoping (VRM)
  • Developed mid-range stope plans that minimize dilution and maximize ore extraction
  • Conducted stope stability studies and wedge analysis, cleaned, analyzed rock mass data using Excel/VBA
  • Performed vent readings, fan selection, and updated emergency prints to ensure compliance and optimize ventilation
  • Produced various KPI reports on project development
  • Analyzed the equipment cycle times and built KPI dashboards in Power BI to monitor performance and identify optimizations
  • Developed dynamic QA/QC dashboards for Ground Control, enhancing quality assurance
  • Created VBA scripts to automate various processes: historical data extraction, gyro probing data processing, vent report preparation, data export for use in Deswik
  • Created process maps in Deswik to automate process; created drawing templates enhanced with dynamically updating data

Mining Engineering Intern

Lake Shore Gold, Bell Creek Mine
05.2022 - 08.2022
  • Performed stope reconciliation and optimized stope processing in Deswik to align with mine planning
  • Estimated stope dilution (ELOS studies) to optimize production and minimize waste

Mining and Backfill Engineering Intern

WSP
06.2021 - 06.2022
  • Prepared paste backfill mass balance and updated PFDs, ensuring efficient backfilling and waste management
  • Calculated underground equipment cycle times, improving utilization and scheduling accuracy
  • Assessed Cut-and-Fill and Long-hole mining methods in Feasibility Studies

Long Term Mine Planner

KAZ Minerals PLC, Bozshakol Mine
09.2019 - 07.2020
  • Performed pit optimization and scenario analysis in Whittle to identify optimal strategies
  • Contributed to resource and reserves estimation, supporting planning for sustainable extraction
  • Designed pit, dump, stockpile, and infrastructure layouts to enhance material handling
  • Developed LOM plans outlining resource leveling of all major equipment and infrastructure
  • Created budgets, cash flow models, and forecasts, ensuring cost-effective operations
  • Conducted mine economics studies, including equipment selection and replacement analysis
  • Maintained production databases, tracking performance and identifying improvement areas
  • Produced monthly and yearly reconciliation reports to verify key mining parameters and identify optimization opportunities

Short Term Mine Planner

KAZ Minerals PLC, Bozshakol Mine
06.2014 - 09.2019
  • Developed production schedules detailing drill, blast, loading, hauling, and stockpiling sequences
  • Identified production optimizations, minimizing dilution, improving blending, and increasing equipment productivity
  • Collaborated with geologists, geotech engineers, and operations teams to ensure accurate execution of the mine plan
  • Produced drill pattern design and blast timing design
  • Performed Quality Assurance/Quality Control on drilling, blasting (fragmentation analysis) and loading practices
  • Planned mine dewatering to maintain safety and efficiency

Education

B.Eng. - Mining Engineering

Laurentian University
Greater Sudbury, ON
05-2023

Mining Engineering Technology -

East Kazakhstan State Technical University
Oskemen, Kazakhstan
05-2014

Mining Engineering Certificate -

University of British Columbia

Skills

  • Deswik (CAD, IS, SCHED, UGDB, OPDB, SO)
  • Surpac
  • MineSched
  • HaulSim
  • Whittle
  • AutoCad
  • Dips
  • UnWedge
  • Excel
  • VBA
  • Power BI
  • Languages – English, Spanish, Russian, Kazakh
  • Common Core Training – U0000, U0001, U0002, U0012 and U0024 (operate utility vehicle)

Timeline

Mining EIT

Vale, Creighton Mine
05.2023 - Current

Mining Engineering Intern

Lake Shore Gold, Bell Creek Mine
05.2022 - 08.2022

Mining and Backfill Engineering Intern

WSP
06.2021 - 06.2022

Long Term Mine Planner

KAZ Minerals PLC, Bozshakol Mine
09.2019 - 07.2020

Short Term Mine Planner

KAZ Minerals PLC, Bozshakol Mine
06.2014 - 09.2019

B.Eng. - Mining Engineering

Laurentian University

Mining Engineering Technology -

East Kazakhstan State Technical University

Mining Engineering Certificate -

University of British Columbia
Malika Imambayeva