-Reactor testing and 500Kv CB and disconnect maintenance
-Down 1 year Unit overhauls
-Down 3 and 12 Unit overhauls
-GCB and IPB replacement program
-Neutral CT replacement program
- Was category 5, pulled SPGs, protection extensions grounded and Isolated.
-Transformer builds CVT and CB replacement, bus upgrades, ground grid work, installed conduits, replaced most equipment in stations.
-ran equipment and organized job, material and multi trades on site.
-Built 129v battery banks and wired chargers at microwave sites
-Upgraded 4 Units in bridge 2, pulled and wired associated panels, eg Governor and exciter control panels, worked closely with CPC, control room wiring, protection and control experience.
Ran equipment, man lift, zoom boom, skid steer, crane work
Oil filled 500Kv CT replacement Kelly lake substation
-Removed and replace CTs and drops
-Man Lift and zoom boom work
Built a reactor and new ground grid and bus work Bob Quinn Substation
-Landed steel, installed round bus, built grid, wired reactor
Level 3 FA
Class 5/6 license in good standing