Summary
Overview
Work History
Education
Skills
Affiliations
Timeline
Generic

Logan Scheetz

Edmonton,AB

Summary

Results-driven Mine Projects Engineer with a track record of executing projects over $50 million CAD. Collaborates effectively with contractors and environmental groups, ensuring project compliance and safety as core values while delivering on-time and within budget.

Overview

9
9
years of professional experience

Work History

Mine Projects Engineer

Canadian Natural Upgrading Ltd.
07.2025 - Current
  • Supported executing multiple projects to support mine development including soil hauling, water body diversions, and mine dewatering.
  • Supporting projects with a budget exceeding $50 million CAD
  • Supporting senior engineers with cost estimation, scheduling, and ensuring quality control
  • Coordinating with contractors and stakeholders to ensure timely delivery of projects within scope and budget
  • Developing safety documents for projects and reviewing them with contractors to drive the message that safety is a core value
  • Collaborating with environmental groups to ensure projects stay within regulatory compliance

Mine Dispatcher

Canadian Natural Upgrading Ltd.
09.2024 - 06.2025
  • Facilitated management decision-making by providing accurate, real-time information to ensure alignment with daily mine plan targets
  • Monitored heavy equipment to optimize haul routes and maintain ore blending within allowed parameters, enhancing operational efficiency
  • Responded to equipment breakdowns and changing mine conditions with effective solutions, minimizing disruptions to operations

Tailings Projects Planner E.I.T.

Canadian Natural Upgrading Ltd.
09.2023 - 08.2024
  • Developed and presented detailed project designs for both JPM and MRM sites as a Short-Range Tailings Planner.
  • Developing an accurate and flexible 52-week schedule for key tailings projects
  • Collaborated with team members to optimize project designs aligned with long-range tailings strategy
  • Collaborating with technical and operations groups to identify and support cost savings opportunities
  • Established and maintained network with various departments within CNRL to enhance tailings project design and execution
  • Mentored and trained new hires and students within the team to ensure knowledge transfer and integration

Tailings Short-Range Planner E.I.T.

Canadian Natural Upgrading Ltd.
09.2021 - 08.2023
  • Developed and presented detailed two-week plans for tailings deposition at both MRM and JPM.
  • Collaborated with tailings operations and other departments to execute tailings plan effectively
  • Monitored and reported key performance indicators to track tailings management success
  • Managed water transfer within tailings areas to optimize performance and compliance
  • Supporting development and execution of the External Tailings Facility infilling strategy

Materials Coordinator

Primoris Willbros Canada
01.2019 - 12.2019
  • As a Materials Coordinator, I was generally responsible for the planning of material receiving, organization, storage, and shipping according to the client’s deadlines and budget
  • Delivered weekly material receiving reports and updated logs to the client to ensure transparency in material management
  • Maintained and updated master materials inventory to support accurate tracking and availability of resources
  • Monitoring and reporting on the progress of the project on a weekly basis.
  • Coordinating with the construction team to provide timely assembly and delivery of materials
  • Working with the client to quickly identify problems and solutions relating to material deficiencies
  • Providing weekly material preservation reports to the client
  • Coordinated with vendors for timely delivery of consumable materials to the construction team, ensuring project timelines were met
  • Fort Saskatchewan

Project Coordinator

OCL Group Inc.
01.2018 - 12.2018
  • As a Project Coordinator, I was generally responsible for planning, executing and finalizing projects according to deadlines and budgets.
  • Providing ongoing project management support.
  • Monitoring and reporting on the progress of projects.
  • Contributing to the safe and effective execution of overall project plans.
  • Managing changes in scope, identifying potential crises and devising contingency plans.
  • Tracking and communicating production targets, project timelines and milestones.

Education

BSc - Mining/Engineering Co-op

University of Alberta
Alberta

Supervisor Training -

Alberta Mine Safety Association (AMSA)

Skills

  • Adaptable
  • ANSYS Engineering Software
  • AutoCad Civil/Maps
  • Collaboration
  • Communications
  • D6 Dispatch
  • Deadlines
  • Dependable
  • Detail Oriented
  • Equipment Operation
  • Extensive Experience
  • FileMaker
  • Microsoft Projects
  • Google Applications
  • Interpersonal Skills
  • Leadership
  • Maptek Vulcan
  • Microsoft Applications
  • Mining Operations
  • Oil Sands
  • Prioritizing
  • Problem Solving
  • Proposals
  • Quick Terrain (QT) Modeler
  • Reporting
  • Safety
  • Tailings
  • Teamwork
  • Timelines
  • Troubleshooting
  • Work Ethic
  • Project management
  • Microsoft Office
  • Cost estimation
  • Budgeting
  • Team collaboration
  • Operational efficiency

Affiliations

  • Canadian Institute of Mining, Metallurgy and Petroleum, 2013 to Present
  • Registered EIT with APEGA

Timeline

Mine Projects Engineer

Canadian Natural Upgrading Ltd.
07.2025 - Current

Mine Dispatcher

Canadian Natural Upgrading Ltd.
09.2024 - 06.2025

Tailings Projects Planner E.I.T.

Canadian Natural Upgrading Ltd.
09.2023 - 08.2024

Tailings Short-Range Planner E.I.T.

Canadian Natural Upgrading Ltd.
09.2021 - 08.2023

Materials Coordinator

Primoris Willbros Canada
01.2019 - 12.2019

Project Coordinator

OCL Group Inc.
01.2018 - 12.2018

BSc - Mining/Engineering Co-op

University of Alberta

Supervisor Training -

Alberta Mine Safety Association (AMSA)
Logan Scheetz