LEN ELLIOTT

Oil and Gas Facilty Construction Manager
Edmonton,AB

Summary

Achieved successful project outcomes through effective management of facilities design and construction in the oil and gas industry. Delivered operational excellence by implementing strategic action plans and maintaining strong commitments. Cultivated positive relationships with team members and stakeholders to drive project success.

Overview

45
45
years of professional experience

Work History

Construction Inspector

TNT Engineering
08.2025 - 09.2025
  • Directed field operations and supervised oil battery management at Wilson Creek location.
  • Facilitated tie-in of two wells from wellhead to shipping point for efficient natural gas and oil transfer.
  • Directed installation of group and test separators to enhance operational efficiency.
  • Supervised MCC building installation and directed comprehensive site wiring operations.
  • Directed installation of VRU compressor to enhance operational efficiency.
  • Directed installation of all piles at project site, ensuring compliance with safety standards.
  • Directed installation of tank farm containment systems and four 1000 bbl tanks.
  • Assisted in organizing activities within Wilson Creek area. Supported team members in reaching project objectives. Helped maintain a positive work atmosphere.

Facilities construction Inspector Operation Manager

Kaden Energy Ltd
05.2017 - 07.2025
  • Oversaw on-site operations for 8 km pipeline and 3 km triple line installations, ensuring compliance with safety and quality standards.
  • Assisted with daily operations of three oil batteries in Kakwa and Deep Valley areas. Supported team efforts to improve productivity and maintain safety standards. Aided in initiatives focused on enhancing performance across multiple locations.
  • Oversaw field operations for diesel invert spill response, ensuring safe and efficient reclamation of contaminated soil.
  • Oversaw pipeline scoping and construction flagging operations across multiple leases.
  • Led design discussions with production engineers and senior management to enhance multiwell tie-in project strategies.
  • Spearheaded design collaboration with two Calgary engineering firms to innovate single well battery systems.
  • Assessed condition and functionality of production equipment skids to optimize operational efficiency.
  • Directed hydro testing operations for existing pipeline to ensure regulatory compliance for re-licensing.
  • Led strategic discussions with senior management to enhance project cost estimation accuracy and efficiency.
  • Oversaw surveyors in strategic planning and execution of pipeline routing from designated multi-well pads to central oil battery in North Smoky area.
  • Led oil spill remediation initiatives in challenging terrains, ensuring ecosystem protection.
  • Assisted teams in meeting operational objectives in Kakwa North and South Smoky areas through effective collaboration. Supported service delivery enhancements by streamlining workflows and promoting safety protocol compliance. Aided in improving team performance and operational efficiency.

Hydro test witness, QC review Equipment loading

Cornerstone Engineering
03.2019 - 01.2023
  • Work directly with QC manager at Alstar Welding reviewing documents for Hydro tests, NDE, MPI, and Stress relieving reports
  • Work directly with hydro test staff to witness spool tests.
  • Witness loading and fabrication of facility equipment, amine towers and associated piping.
  • Location: Hinton – Alstar Welding shop Edmonton – Thermo Design Engineering, Alco Oil and Gas

Production/Construction Manager

United Hydrocarbon Chad
03.2014 - 01.2015
  • Work directly with Facilities Manager and Engineering company on design of the Oil facility and oil well tie ins
  • Work with Reservoir staff and completions staff planning well testing.
  • Work directly on Operations budget planning with analysts and senior management.
  • Work directly with Training and development planner on developing plans for all Operations staff.
  • Oversee all onsite construction of well site sand road access while on site in Balanga field in Chad for Drilling program.
  • Location: Calgary head office and Balanga Chad Africa
  • Worked on this project on days off from the Tanzanian project from March 2014 until Oct 2014. On this project fulltime from Oct 2014 to Jan 2015

Operations Specialist Construction Supervisor

Maurel and Prom
12.2009 - 10.2014
  • Work directly on design, procurement and implementation of a 5 km 10” gas pipeline to main facility
  • Design and oversee construction of new MCC building at Mtwara Power Plant
  • Design and oversee construction of bypass piping and control valves at Mtwara Power Plant Gas
  • Work directly with the General Manager on all Operations matters.
  • Management and mentor Operations and Mechanical staffing on Gas to Power Generation Project
  • Develop and control Operations budget for the Project
  • Manage a remote (100 man) camp including Operations, Maintenance, Security and Camp catering.
  • Develop a training program for all Tanzanian Operations and Maintenance Staff for Operator and Maintenance Progression and Safety Core courses.
  • Develop good working relationships with the local villages in the area of the Facility.
  • Troubleshoot existing Process Facility as needed.
  • Location: Tanzania Africa

Production Operations Manager

Tartan Engineering / Artumas Energy
07.2007 - 12.2009
  • Work directly with the Country Manager on all Operations matters.
  • Management and mentor Operations and Mechanical staffing on Gas to Power Generation Project
  • Develop and control Operations budget (through SAP) for the Project
  • Work directly with HR on all hiring
  • Manage a remote camp of approx. 150 people including Operations, Maintenance, HSE, Medical, Security, Procurement and Camp catering.
  • Develop Contracts for Camp Catering and Security
  • Interact with Govt of Tanzania in JOA negotiations.
  • Develop a training program for all Tanzanian Operations and Maintenance Staff for Operator and Maintenance Progression and Safety Core courses.
  • Manage the Field office in Mtwara TZ with staff of Accounting, Community Relations, Pool Drivers, IT, Environment, Safety and Procurement.
  • Develop good working relationships with the local villages in the area of the Facility.
  • Work directly on design and implementation of all new Facility Projects (CNG Plant) with Facility Engineering Group.
  • Troubleshoot existing Process Facility as needed.
  • Location: Tanzania Africa

Construction Superintendent/Manager

Harvest Operations Corp
08.2005 - 08.2007
  • Project management for Facilities Engineering for the Hay Area Winter projects (2006 and 2007).
  • Complete design, installation and start up of all new oil well tie ins, pipelines and Battery upgrades for the project. Project manage power line installation (15 kms – 133 kv)
  • Manage Plant and Pipeline Inspectors during construction.
  • Work directly with the Safety and Environment service groups to meet the requirements of Harvest Corp and all government regulatory boards for all projects for the B.C. area.
  • Manage the installation of the winter road to site (approx. 45 kms) – Winter 2006/07
  • Manage the 250 man camp for the complete winter project – Winter 2006/07
  • Work directly with the Production Engineer and field team on all daily operational problems and concerns of oil battery and wells.
  • Work to develop a good working relationship with the Dene Tha First Nations.
  • Work directly with the Safety and Environment service groups to meet the requirements of Harvest and all government regulatory boards for all projects for the B.C. area.
  • Location: Calgary Office
  • Hay Field – NE British Columbia
  • Red Earth Area (Loon, EVI 1 and EVI 3)

Operations Superintendent

NEXEN CANADA (Can Oxy / Wascana)
01.1997 - 08.2005
  • Develop well and facility designs from start of project of 4 oil wells to over 100 oil wells through the period of time I was managing the project.
  • Provided supervision and mentorship for all production field personnel (operations and maintenance).
  • Monitored and controlled operating costs and production targets with the Hay field team.
  • Worked directly with the Production Engineer and field team on all daily operations of wells.
  • Worked directly with both the Facility Engineers and external Engineering on design of all projects for the yearly expansion of the Hay oil property.
  • Worked directly with HR on all hiring and corrective action for the plant operations and maintenance team.
  • Worked directly with the Safety and Environment service groups to meet the requirements of Nexen and all government regulatory boards.
  • Manage remote camps during Operations and \Construction
  • Location: Calgary Office
  • Hay Field – NE British Columbia (Sold to Harvest Operations Corp)
  • Beaver River, Cranberry, Gunnel and Gold Creek (disposed properties)

Production Superintendent

WASCANA ENERGY INC.
01.1993 - 01.1997
  • Supervised operations at Joffre miscible flood (D-2 sour oil), Petitot sour field, (Slave Point gas) and Gold Creek sour field (Wabamun gas).
  • Supervised operations at Gold Creek, Valhalla sweet gas fields, Saddle Hills and Gilwood oil batteries.
  • Reviewed and provided operational input on the design of all grassroots and non-grassroots projects with the Facilities Engineering group (Petitot, Gold Creek, Gunnel, Helmet, Valhalla and Larne areas).
  • Supervised reclamation of the Leduc gas plant and associated well sites.
  • Participated in the development and implementation of a P.M. program.
  • Developed operators site-specific work procedures for sour locations.
  • Developed a Reciprocating compressor standardization data package to be used throughout Wascana.
  • Location: Lacombe Field Office and Calgary Office

Construction Superintendent

SASKOIL / WASCANA
01.1989 - 01.1993
  • Coordinated construction and reviewed major bid packages with project engineers.
  • Reviewed the design of all new facilities and provided practical input where required (construction & operational).
  • Audited all construction projects to ensure Saskoil procedures are followed (Engineering, Safety, Environmental and Purchasing).
  • Conducted shop audits on fabricated equipment to ensure Saskoil specification and government regulations were met.
  • Provided operational input to develop a Saskoil standard specification on compression, dehydration and separation packages.
  • Manage sour gas plant abandonment and reclamation in Leduc area.
  • Provided design documents for all construction of in-house engineered projects (P & ID & isometric drawings).
  • Provide operator training and troubleshooting on new and existing facilities.
  • Manage startups of Facility engineered projects.
  • Reviewed performance of all construction inspectors.
  • Location: All SASKOIL Districts (Alberta & Saskatchewan)

Consultant – Construction & Operation

SASKOIL / WASCANA
01.1987 - 01.1989
  • Provided contract operation of the sour gas plant, refrigeration unit and three field compressor stations. Operate sour gas wells, oil battery and oil wells.
  • Provided supervision of all maintenance and construction at sites.
  • Provided operator training of sour gas plant and wells.
  • Location: Leduc Gas Plant; Leduc, AB

Consultant – Construction & Operation

THOMPSON-JENSON PET. LTD.
01.1986 - 01.1987
  • Consulting on complete reconstruction of sour gas plant, sour gas well tie-ins and compressor installation.
  • Control commissioning of plant during startup. Provide inspection for compressor installations.
  • Contract operation of sour gas plant, refrigeration unit, 2 field compressor stations, sour gas wells, oil battery and oil wells.
  • Supervision of all maintenance and construction at sites.
  • Location: Leduc Gas Plant; Leduc, AB

Contract Senior Operator

PETRO-REP CANADA LTD.
01.1985 - 01.1986
  • Control commissioning of plant during startup.
  • Location: Algar Lake Station

Contract Senior Operator

PARAMOUNT RESOURCES LTD.
01.1982 - 01.1985
  • Control commissioning of plant during startup.
  • Provided contract operating and maintenance of plant related equipment and producing gas wells.
  • Operator training of compression, dehydration and wells.
  • Operated Nova Corp. sales stations at above site.
  • Location: Chard Compressor Station, Granor Compressor Station Saleski Compressor Station, Liege Compressor Station

Contract Operator

WAINOCO OIL AND GAS
01.1979 - 01.1982
  • Controlled commissioning of plant during startup.
  • Provided contract operating and maintenance of plant related equipment.
  • Supervised all construction and maintenance crews.
  • Provided operator training for Dome Petroleum and C.D.C. in the Dahl & Velma fields
  • Location: Dahl Compressor Station, Fort St. John, BC

Construction & Maintenance Foreman

DELRANT SUPERVISION & INSPECTION
01.1978 - 01.1979
  • Supervised construction and maintenance crews on oil and gas facility construction for Mesa Petroleum.
  • Inspected construction on various pipeline and compressor stations installations.
  • Operated Meanook sour gas plant and well for Brascan Resources.
  • Location: Vegreville & Athabasca, AB

Construction Foreman

GOODING & MATT CONSTRUCTION
01.1975 - 01.1978
  • Supervised pipefitters and welders on compressor station and oil battery installations and field tie-ins for Mesa Petroleum, Pan Canadian, Ashland and Dome Petroleum.
  • Supervised sour gas plant turnarounds and maintenance for Shell Oil at Virginia Hills and Simonette locations.
  • Location: Nisku, AB

Maintenance Foreman

CE NATCO LIMITED
01.1972 - 01.1975
  • Construction and start-up for sour and sweet oil batteries, dehy units, line heaters and bolted tanks.
  • Supervised the complete rebuilding of Natco dehy units, valve repairs and testing.
  • Supervised the complete service and repairs on vertical and horizontal treaters

Skills

Achieved streamlined data analysis through proficient use of Microsoft Excel Enhanced project tracking efficiency by implementing innovative spreadsheet techniques Improved data organization, resulting in quicker access to critical information

Achieved seamless document collaboration through effective use of Microsoft Word Enhanced team efficiency by implementing streamlined editing processes Improved document quality by providing expert guidance on formatting and design

Produced high-quality presentations that effectively conveyed key messages Enhanced audience engagement through innovative design and content strategies Achieved positive feedback from stakeholders on presentation effectiveness

Achieved improved communication flow by leveraging Microsoft Outlook for email management and scheduling Enhanced team productivity through effective calendar coordination and timely meeting arrangements Fostered a collaborative environment by maintaining organized communication channels

Analyzed spatial data and created detailed accumap representations to support decision-making processes

Achieved seamless operation of SCADA systems through proactive monitoring and issue resolution Enhanced user engagement with RS view applications by implementing user feedback Improved system documentation, resulting in increased accessibility for team members

Achieved improved operational efficiency by leveraging SCADA systems for real-time monitoring Enhanced system reliability through proactive troubleshooting and support Delivered solutions that minimized disruptions and maximized productivity

Achieved improved operational efficiency through effective utilization of Wonderware SCADA systems Enhanced system reliability by proactively addressing and resolving technical challenges Streamlined documentation processes to support ongoing system improvements

Achieved improved operational performance through the deployment of fast SCADA tools Enhanced data accuracy and response times by optimizing system configurations Drove team collaboration to streamline processes and elevate project outcomes

Languages

English
Full Professional

Highlights

  • Facility construction:
  • Assist Facility engineers on design and planning for oil and gas facilities with the operational input.
  • Manage complete facilities construction projects while overseeing Contractors and Installation Inspectors.
  • Supervise Pipeline construction from planning to construction.
  • Shop inspections on Production equipment skids
  • Facility abandonment and reclamation.
  • Developing bid packages and selecting successful bidders.
  • P&ID, PFD, layout and Hazop reviews.
  • New facility commissioning and troubleshooting.
  • Production/Operations:
  • Management and Supervision of complete daily operations, HSE, accounting and maintenance teams for Gas and Oil facilities.
  • Training of all staff with classroom and hands on techniques.
  • Manage plant turnarounds and troubleshoot facility problems.
  • Develop and manage complete Operational budgets both financial and production targets.
  • Manage remote camp sites of 150 staff.

ADDITIONAL COURSES

  • St. John’s C.P.R.
  • St. John’s First Aid
  • St. John’s H2S Awareness
  • Gas Plant Operations / Trouble shooting
  • Creative Negotiating
  • Transportation of Dangerous Goods
  • W.H.M.I.S.
  • Rotating Equipment Vibration Seminar
  • Time Management
  • Seven Habits of Highly Effective People
  • Due Diligence for Supervisors & Managers
  • In house SAP training
  • IRP 16
  • Raychem Shrink Sleeve Seminar
  • Discrimination & Harassment
  • Defensive Driving
  • First Time Supervisor
  • Petroleum Tech. for Production Foreman
  • VanWaters & Rodgers Dehydration Seminar
  • High Performance Team Management
  • Preventative Maintenance
  • Oil Well Optimization (Len Thorn)
  • Supervising Contractors
  • Ground Disturbance
  • In house Cultural Awareness
  • Confined Space

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Interests

Automotive restorations

Timeline

Construction Inspector

TNT Engineering
08.2025 - 09.2025

Hydro test witness, QC review Equipment loading

Cornerstone Engineering
03.2019 - 01.2023

Facilities construction Inspector Operation Manager

Kaden Energy Ltd
05.2017 - 07.2025

Production/Construction Manager

United Hydrocarbon Chad
03.2014 - 01.2015

Operations Specialist Construction Supervisor

Maurel and Prom
12.2009 - 10.2014

Production Operations Manager

Tartan Engineering / Artumas Energy
07.2007 - 12.2009

Construction Superintendent/Manager

Harvest Operations Corp
08.2005 - 08.2007

Operations Superintendent

NEXEN CANADA (Can Oxy / Wascana)
01.1997 - 08.2005

Production Superintendent

WASCANA ENERGY INC.
01.1993 - 01.1997

Construction Superintendent

SASKOIL / WASCANA
01.1989 - 01.1993

Consultant – Construction & Operation

SASKOIL / WASCANA
01.1987 - 01.1989

Consultant – Construction & Operation

THOMPSON-JENSON PET. LTD.
01.1986 - 01.1987

Contract Senior Operator

PETRO-REP CANADA LTD.
01.1985 - 01.1986

Contract Senior Operator

PARAMOUNT RESOURCES LTD.
01.1982 - 01.1985

Contract Operator

WAINOCO OIL AND GAS
01.1979 - 01.1982

Construction & Maintenance Foreman

DELRANT SUPERVISION & INSPECTION
01.1978 - 01.1979

Construction Foreman

GOODING & MATT CONSTRUCTION
01.1975 - 01.1978

Maintenance Foreman

CE NATCO LIMITED
01.1972 - 01.1975
LEN ELLIOTTOil and Gas Facilty Construction Manager