Talented Project Coordinator focused on promoting team adaptability and cohesion. Meticulous attention to detail and successful track record of accomplishing projects on time and within budget constraints. Knowledgeable about planning and executing major and small cap projects.
- Sole proprietor of all project related material / asset purchases. As well as CAPEX or Capital expenditure purchases. In the multi-million dollar range.
- Worked closely with the entire project management team, facilitating all request to supplement and satisfy projects with the required materials and equipment. Either owned or outsourced.
- Collected and reported all required project specific data; such as water / fuel consumption, employee / contractor records, time-keeping, etc.
- Working with the HSE lead, organized and developed portions of the safety program, as well as implementing new procedures in the field.
- Worked with brokerage agents in cross border shipping of company owned assets.
- Aligned with outside fabrication companies, to ensure appropriate specifications and quality parameters were met within tight deadlines.
- Institute rollout of a new material / Asset managing software company wide (CAD/USA) MaintainX. Communicated locations and dollar values to the finance department on a bi-weekly basis or as shipments traveled cross border.
- Held role of HSE representative on site, while completing Coordinating duties.
- Created isometric drawings for prospective projects in the early stages of planning.
- Performed field walks and site visits to ensure alignment with client requirements.
- Operated and coordinated multi discipline construction and maintenance projects at Suncor and TC Energy
- Managed fire protection system remediation projects, on an industrial level.
- Managed earth work projects such as, trenching, excavating, day-lighting and shoring & HDPE pipe installation with back filling.
- Operated as the safety liaison for the company while on smaller project scopes.
- Held title of Area Authority at Suncor Fort hills during the commissioning phase. This consists of: initial gas testing, Permit dispatch, Care/custody/control of Suncor NPA assets.
- Installed new systems and connected piping to existing components by welding, bolting and threading.
- Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
- Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
- Connected piping systems to water heaters, boilers, pumps and auxiliary equipment to complete installations.
- Monitored pipeline pressure and flow rates to facilitate safe and efficient operation.
- Gathered task specific materials required for completion. Communicated items via pick list to materials management.
- Performed new construction builds as well as tenant improvement scopes.
- Held maintenance positions at multiple oil and gas sites, such as Kearl Lake and Suncor
- Piping Foreman on the Loge level of the new arena during the construction phase in Edmonton, Rogers place.
- Filled in as the PM at Rogers Place on occasion, during construction.
- Operated company owned service vehicle, completed purchasing / tracking of materials respective to task scope.
- Project Organization
- Subcontractor Oversight
- Project Commissioning
- Procurement
- Materials Take-Offs
- Multi-Operations Management
- Methodology Improvements
Janis Miglinieks - Suncor 780-881-1787
Guy Lefebvre - Enbridge 780-918-0385
Kevin Mcmahon - 780-297-0228