Carpenter
White Water concrete LTD.
Vancouver
08.2013 - 02.2015
- Erected and dismantled forms Doka, Peri, Sky Deck, F co. forms, Luma systems, Atlas tables, Tabla, Perri tables, gang forms and free form.
- Built walls, columns, slabs, slab bands, core, stair cores, curbs, architectural curbs and concrete and stairs.
- Calculate the quantity of materials needed for a job, such as the volume of concrete required for footings walls and columns.
- Communicate with a foreperson to report on work progress and troubleshoot problems.
- Convert between metric and imperial measurement systems.
- Make decisions to use materials efficiently.
- Refer to blueprints and specifications to obtain detailed project information.
- Analyze blueprints and actual measurements to identify errors.
- Keep up-to-date with codes, regulations, standards and materials.
- Consult other carpenters to share knowledge and experience.
- Interpret labels such as the Workplace Hazardous Materials Information System (WHMIS) to follow safety guidelines.
- Work as a team to promote safety.