Bilingual Assistant Project Manager with over 12 years of experience in the construction industry; with a solid background in construction management, coordination, scheduling, Budget control and design examination, determined to accomplish project objectives and meet company goals.
- Maintain and update the key components of a complete project schedule.
- Financial Control: manage billing process, invoicing and cashflow.
- Execute the project quality control plan.
- Assist, manage and report Project risks.
- Manage and develop project coordinators
- Maintain and develop relationships with Key project stakeholders.
- Procure sub-contracts and manage procurement schedule.
In this Position, I worked on 110 000 sq feet warehouse project ( Value $ 18M) including the Tenant improvement Value ( $ 2M) in Vaudreuil QC, as Senior project Coordinator and considering the value of the project ( < $20M) , I have acted as project Manager with 100% autonomy. managing construction of the base building, and tenant requirements for interior fit up.
In this Position I worked on the construction of a base building warehouse of 247 000 sq ft ( Value 27M), assisting project manager with project management tasks, such as project scheduling, financial control, coordination with consultants and subcontractors and quality control.
with Asco Construction i worked on small scale project ranging from ( $ 250 000 to $11M), acting as project manager for the project of Horizon Jeunesse School in Ottawa ( Value $2M), and an Assistant Project Manager on project of De la Salle School in Ottawa ( Value $11M).
In this Position, i worked on the following Project:
- Rockland & Bourget Fire Station
Construction of two (2) new fire stations “Design & Build”
Acting Role : Project Coordinator
VALUE: $8,112,586
- Sarsfield Senior's Residence
Two (2 ) storey addition to an existing senior's
apartment building including 15 new apartments
expanded social room, storage and elevator.
Acting Role : Project Coordinator
VALUE: $2,165,912
- Char lan Roof Replacement
Acting Role : Project Coordinator
VALUE: $524,677
• Coordinate with engineering team, project documents submittals.
• Review Engineering deliverables.
• Follow established Engineering planning to provide timely and effective hand-off of documents.
• Prepare Project file portfolio for client feedback, with required documents.
• Attend meeting with PrEm and Interact with client to update Deliverable status
• Report regularly to Project engineering Manager about deliverable and Requirement Matrix status
the project was a 11 km light rail system including infrastructure ( 2 bridges and 3 Tunnels ) project Value: 250 M€
• Conducted quality control check of CW drawings and system of installation plans and functional specifications.
• Ensured that plans are in compliance with the project's graphic charter
• Created CAD drawings from combination of all subsystems concept design.
• Identified spatial and functional conflicts and inconsistencies during engineering design phase.
• Acted as the liaison between construction teams and design team.
• Managed coordination and assisted civil work partner to improve deliverables submissions by 80%
•Prepared design specifications and drawings for construction and renovation projects.
• Carried out measurements of building and draft there detailed drawings for renovation projects.
• Elaborated with AutoCAD plan views, sections, plan ground and details drawings.
• Prepared tender documents for construction projects.
• Elaborated the ITT documents ( Invitation to Tender)
• Carried out Tender analysis and Evaluation for both financial and technical offers.
Constantine Tramway Line Extension, Construction of 11 KM of tramway line including 3 Tunnels 2 Bridges 11 Passenger Station, Project engineer, Coordination and synthesis Engineer, €250,000,000