Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Keith O'Donnell

Tillsonburg

Summary

Accomplished Sheet Metal Fabricator and HVAC Installer with a proven track record at Select Heating and Cooling, adept in metal forming and time management. Excelled in streamlining production processes, enhancing productivity by over 30%, and ensuring top-quality installations in compliance with industry standards. Demonstrates exceptional collaboration and problem-solving skills, driving successful project completions.

Overview

8
8
years of professional experience

Work History

Sheet Metal Fabricator

Select Heating and Cooling
04.2024 - Current
  • Cut, bent and shaped metal sheets and components to meet specific project requirements.
  • Maintained a safe working environment by adhering to strict safety protocols and properly maintaining equipment.
  • Interpreted blueprints, schematics and technical documentation to obtain project instructions and completion requirements.
  • Prioritized tasks effectively, balancing multiple projects simultaneously while ensuring attention to detail and meeting deadlines.
  • Troubleshot and resolved fabrication issues efficiently, minimizing disruptions to production schedules and maintaining project timelines.
  • Collaborated with team members to streamline production processes, increasing overall productivity and meeting project deadlines.
  • Managed inventory of materials and supplies, reducing shortages or delays in production schedules.

HVAC Installer

Mazza Heating and Cooling
10.2016 - 03.2024
  • Assembled air ducts, pipes, discharge valves and flues to central heating and cooling equipment.
  • Removed old equipment from customers' homes and cleaned up areas to prepare for new installations.
  • Maintained a clean, organized workspace during installations and repairs, demonstrating respect for clients'' properties and minimizing disruptions.
  • Located and marked pipe positions, hole passages and duct connections in walls and floors.
  • Installed components to improve HVAC system performance.
  • Facilitated seamless transitions from older HVAC systems to newer models through expert removal of existing equipment and precise installation of replacements.
  • Ensured top-quality installations by adhering to local building codes, manufacturer specifications, and industry best practices.
  • Collaborated effectively with architects, engineers, electricians, and other construction professionals during large-scale projects, ensuring smooth coordination and successful outcomes.
  • Utilized pressure gauges and soap-and-water solutions to test pipe and tubing joints for leaks.
  • Read blueprints, wiring diagrams, piping schemes and engineering specifications to diagnose and repair units.
  • Kept accurate records of time and materials used for each job to compile into service reports.

Education

308 A Sheet Metal Block 2&3 - HVAC

Fanshawe College
London, None
11-2024

Block One of 308 A Sheet Metal Worker - HVAC

Mohawk College of Trades
Stoney Creek, ON
12-2021

Gas Technician 2 - Natural Gas And Propane

Hi-Mark
Cambridge, ON
09-2019

High School Diploma -

Glendale High School
Tillsonburg, ON
06-1998

Skills

  • Metal forming
  • Shearing operations
  • Material prepping
  • Power tool usage
  • Sheet metal layout
  • Roll forming
  • Cutting operations
  • Cutting and bending skills
  • Hand tool usage
  • Mathematical calculations
  • Time management
  • Attention to detail

Languages

English
Full Professional

Timeline

Sheet Metal Fabricator

Select Heating and Cooling
04.2024 - Current

HVAC Installer

Mazza Heating and Cooling
10.2016 - 03.2024

308 A Sheet Metal Block 2&3 - HVAC

Fanshawe College

Block One of 308 A Sheet Metal Worker - HVAC

Mohawk College of Trades

Gas Technician 2 - Natural Gas And Propane

Hi-Mark

High School Diploma -

Glendale High School
Keith O'Donnell