Summary
Overview
Work History
Education
Skills
Websites
Timeline
Generic

Kasra Heydari

Toronto,ON

Summary

Highly skilled Spray Foam Insulation Specialist and Technical Manager with over 6 years of hands-on experience in residential, commercial, and industrial insulation projects across the Greater Toronto Area. Proven expertise in spray foam system installation, equipment maintenance, rig building, and technical troubleshooting. Strong background in customer support, training, and field service management, with a reputation for professionalism, precision, and reliability.
Demonstrated success in managing teams, training certified installers, and advising clients on material selection and best application practices for energy efficiency and sustainability.
Technically proficient with Graco and PMC equipment, with additional skills in welding, rig design, and mechanical systems maintenance.
A proactive problem solver and communicator, dedicated to delivering high-quality technical service, building long-term relationships, and supporting customers through responsive solutions and technical expertise.

Overview

6
6
years of professional experience

Work History

Spray Foam Lead Installer / Equipment Technician

CNG Insulation & Drywall Inc. – Vaughan, ONn
11.2024 - 08.2025
  • Led installation teams to ensure timely and efficient project completion.
  • Trained and mentored junior installers on best practices and safety protocols.
  • Developed process improvements to enhance installation efficiency and reduce downtime.
  • Managed and led spray foam insulation projects using 2lb and ½ lb SPF systems for residential and commercial applications.
  • Maintained and operated spray equipment and rigs, ensuring safe and efficient operations.
  • Interacted directly with clients, providing technical support, troubleshooting, and clear communication.
  • Made independent decisions regarding application methods, equipment use, and quality control.

Head Manager & Technical Manager /Installation Engineer

Eco Green Insulation Inc. – Toronto, ON
09.2022 - 11.2024
  • Coordinated cross-departmental initiatives to align strategic goals with operational execution.
  • Analyzed performance metrics to identify trends and inform decision-making strategies.
  • Supervised spray foam insulation projects using 2lb and ½ lb SPF systems for residential and commercial work.
  • Built and customized spray foam rigs for sale, ensuring top performance and safety compliance.
  • Provided training, maintenance support, and troubleshooting assistance for Graco and PMC equipment.
  • Delivered product and sales guidance to clients, improving project outcomes and customer satisfaction.
  • Managed installation crews and warehouse logistics to meet demanding schedules.
  • Developed training programs to enhance team performance and workflow effectiveness.Trained new installer: Nasai – (647) 677-2298. (Caliber certification)

Lead Hand SPF Spraying Technician

Eco Spray Insulation Inc. – Toronto, ON
Toronto, ON
05.2021 - 07.2022
  • Led spray foam insulation projects using 2lb and ½ lb SPF systems.
  • Independently built and equipped a new spray foam rig.
    Operated and maintained all spray equipment for safe, efficient performance.
  • Made job-site decisions on equipment use, application methods, and quality control.
  • Oversaw daily operations, ensuring adherence to safety protocols and quality standards.
  • Implemented training programs that improved staff competency and reduced operational errors.
  • Provided on-site client communication and technical support.
    Trained installer Brondon Jana – (647) 540-1383, supported CUFCA certification

Head Installer / Equipment Technician

PR Foam Insulation Inc. – Scarborough, ON
Toronto , ON
10.2020 - 05.2021
  • Installed both open-cell and closed-cell SPF insulation for commercial and industrial clients.
  • Maintained equipment and rigs, ensuring optimal performance.
  • Oversaw daily site operations and client communications.
  • Trained installer Damion Cane – (647) 806-0177.
  • Analyzed machinery and tested electrical systems and wiring to identify faults and resolve issues impeding performance.
  • Maximized operational reliability through close collaboration with engineering staff on process improvements that directly impacted overall production goals.
  • Checked, repaired and repacked survival equipment to meet specifications.

Spray Foam Installer

Danic Foam Insulation Inc. – Newmark, ON Spray Foa
07.2020 - 08.2020
  • Installed various equipment and fixtures while ensuring compliance with safety standards.
  • Conducted thorough assessments of installation sites to determine optimal placement of products.
  • Collaborated with team members to streamline installation processes, enhancing overall efficiency.
  • Led troubleshooting efforts for installation issues, reducing downtime and improving service quality.
  • Applied spray foam insulation in residential and commercial buildings.
  • Performed equipment repairs and maintenance.
  • Performed equipment repairs and maintenance.
    Maintained safety standards and accurate project documentation.

SPF Installer / Equipment Technician

Eco Green Insulation Inc. – Toronto, ON
10.2019 - 07.2020
  • Installed ½ lb open-cell and 2 lb closed-cell spray foam insulation in residential and commercial projects.
  • Conducted equipment repairs, spray gun maintenance, and rig upgrades.
  • Led installation projects, ensuring adherence to safety standards and quality specifications.
  • Trained junior installers on equipment operation and installation techniques. Trained installer Aydin Alibabaei – SPF Installer (Caliber, 2020) – (416) 876-1017.
  • Streamlined workflows to enhance efficiency in project execution and completion timelines.
  • Developed training materials for new employees, improving onboarding processes.
  • Read and interpreted blueprints to assess material needs and job requirements.
  • Followed all safety standards and documented project progress.

Education

Azad University

License - Installer Certification

Caliber
Waterloo Ontario
01.2020 - 03.2020

Skills

Spray Foam Installation & Application

  • Experienced in applying all types of spray foams including 2 lb closed-cell and ½ lb open-cell systems
  • Skilled in spraying precise thickness layers using a step-by-step application process
  • Operated and controlled blowers, pumps, and material flow systems
  • Removed old insulation safely (including asbestos-containing materials, following safety regulations)
  • Installed and finished insulation systems to protect against heat, cold, sound, and moisture
  • Consistently adhered to quality and service standards to ensure optimal insulation performance

Equipment Maintenance & Technical Skills

  • Performed general maintenance and repairs on spray foam equipment (Graco Reactor, PMC systems, transfer pumps, spray guns)
  • Skilled in rig building, customization, and design for spray foam application setups
  • Rebuilt and upgraded spray rigs for enhanced performance, safety, and reliability
  • Diagnosed and troubleshot mechanical and technical problems efficiently
  • Conducted equipment calibration, testing, and preventive maintenance

Team Leadership & Supervision

  • Led teams of installers on residential, commercial, and industrial projects
  • Trained multiple new installers for CUFCA and Caliber SPF certifications
  • Monitored daily job performance, ensured compliance with company and safety standards
  • Provided clear communication, guidance, and on-site decision-making to meet project deadlines
  • Collaborated with management to align operational goals and field performance

Client Support & Insulation Consulting

  • Evaluated project requirements and recommended the best insulation materials and methods for cost and performance optimization
  • Delivered professional on-site consultation and customer service
  • Resolved client concerns promptly and professionally, ensuring satisfaction and long-term relationships

Additional Skills

  • Strong mechanical aptitude and power tool operation
  • Attention to detail and quality control
  • Time management and multitasking under pressure
  • Project coordination and documentation
  • System repair and installation updates
  • Spray foam rig builder and designer (custom systems, component integration, safety optimization)
  • Welding and fabrication (metal framing, rig modification, equipment mounting)

Timeline

Spray Foam Lead Installer / Equipment Technician

CNG Insulation & Drywall Inc. – Vaughan, ONn
11.2024 - 08.2025

Head Manager & Technical Manager /Installation Engineer

Eco Green Insulation Inc. – Toronto, ON
09.2022 - 11.2024

Lead Hand SPF Spraying Technician

Eco Spray Insulation Inc. – Toronto, ON
05.2021 - 07.2022

Head Installer / Equipment Technician

PR Foam Insulation Inc. – Scarborough, ON
10.2020 - 05.2021

Spray Foam Installer

Danic Foam Insulation Inc. – Newmark, ON Spray Foa
07.2020 - 08.2020

License - Installer Certification

Caliber
01.2020 - 03.2020

SPF Installer / Equipment Technician

Eco Green Insulation Inc. – Toronto, ON
10.2019 - 07.2020

Azad University
Kasra Heydari