Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

KARTHIK GADE

London

Summary

Dedicated and talented Project Coordinator with a strong background in engineering and 7 years of experience. Proven ability to lead and manage smaller projects within automation, process industries and construction. A creative problem solver with excellent communication skills and a commitment to customer satisfaction. Proficient in project tracking, vendor management, and risk mitigation. Strong computer skills including Microsoft Office Suite, and knowledge of software SAP/ERP.

Experienced with managing project timelines, resources, and stakeholder communications efficiently. Utilizes problem-solving skills to address project challenges and ensure smooth execution. Track record of implementing project management best practices to deliver quality outcomes.

Overview

10
10
years of professional experience

Work History

Sanitation Worker

Nuts For Cheese
01.2023 - Current
  • Informs Sanitation Supervisor of all repairs of maintenance issues and structural problems throughout the facility
  • Completes a daily/weekly cleaning checklist to ensure all areas and equipment are ready to meet pre operations goals established by SOP
  • Reports all GMP/SOP/BRC following requirements through continuous daily inspections
  • Performs other related duties as assigned
  • Sanitation technicians will receive QA Training to have a better understanding of the Food Industry requirements
  • Sanitation Technician will be trained in all areas of the sanitation department, including the Janitorial areas
  • Completing training in chemicals for janitorial and sanitation tasks
  • Follow sanitation programs such as SOP’s
  • Janitorial tasks such as cleaning all restrooms, breakroom, main hallways, warehouses, compactor areas including outside facility
  • Complete training on Master Sanitation Schedule
  • Support production and quality team through sanitation efforts and initiatives
  • Effectively communicating with all team members
  • Ensuring all paperwork for the assigned daily tasks is correct and complete
  • Safely using WHIMIS controlled substances by wearing all required PPE and following all safety policies and procedures determined by the OHSA and by our Health and Safety Program
  • Ensuring the storage of tools, equipment, and utensils is organized, efficient, and safe
  • Responsible for cleaning areas according to company policies, HACCP, GMP& SOP’s & Participate, when necessary, in third party audits
  • Promote food safety and hygiene throughout the company
  • Assist in developing and conducting programs of sampling and analysis to maintained quality standards

Food Processor

L&H Smith Fruit Co. Limited
11.2023 - 04.2023
  • Unload raw materials to yard and take them to finished products area and packaging materials throughout plant and warehouse manually, & with powered equipment
  • Measured and dumped ingredients into hoppers of mixing and grinding machines
  • Feed and unload food, beverage, and associated products processing machines
  • Feed flattened boxes into forming machines to construct containers
  • Remove filled containers from conveyors and manually pack goods into bags, boxes, and other containers
  • Clean work areas and equipment
  • Check products and packaging for basic quality defects
  • Assist process control and machine operators in performing their duties

Assistant Project Manager

Sri Gopalkrishna Infrastructure Private Limited
09.2019 - 07.2022
  • Collaborated closely with customers and internal teams to ensure seamless project execution
  • Developed detailed timelines and goals for project execution
  • Monitored project performance, ensuring adherence to schedules and customer expectations
  • Participated actively in worksite meetings with professionals and subcontractors to facilitate effective communication
  • Coordinated change orders, estimating costs, and overseeing execution in collaboration with professionals and subcontractors
  • Ensured high-quality control standards for finishing work, contributing to overall project excellence
  • Prepared and tracked technical queries related to plans and specifications
  • Assisted in managing payment requests both from clients and subcontractors
  • Monitored and managed deficiencies during the project completion phase
  • Collaborated with the Administrative Assistant to assemble final project documents

Assistant Construction Manager- Electrical

Larsen & Toubro Limited
07.2018 - 09.2019
  • Collaborated closely with Project Manager and Site Superintendent to ensure seamless project execution
  • Participated actively in worksite meetings with professionals and subcontractors to facilitate effective communication
  • Coordinated change orders, estimating costs, and overseeing execution in collaboration with professionals and subcontractors
  • Prepared Daily Project Status & Report to Manager
  • Managed Project Meetings
  • Updated availability of material Required status
  • Requested Purchase Orders for suppliers as per the standards of company
  • Managed all Documentation works and updating the same to our team members
  • Had good coordination with the Client of the project
  • Generated work orders for sub-contractors as per the quoted price approved by manager
  • Utilized strong interpersonal and project management skills to manage a 12-person team and completed a complex project, resulting in a 23% increase in Project Profit
  • Had good coordination with the Client of the project

Assistant Engineer – Electrical

Nagarjuna Construction Company Limited
08.2016 - 07.2018
  • Daily progress activity, Preparation of weakly progress report monthly budget & planning
  • Billing of material supply & erection
  • Managed Project Meetings
  • Updated availability of material Required status
  • Requested Purchase Orders for suppliers as per the standards of company
  • Managed all Documentation works and updating the same to our team members

Electrical Engineer

Rudranee Infrastructure Limited
10.2014 - 07.2016
  • Managed project budgets of over $5M with the management team
  • Utilized an SAP model to virtualize all Project Details and implemented Thin Clients architecture to reduce the workstations across the facility, resulting in a 49% reduction in physical footprint and a 25% reduction in electrical maintenance costs
  • Facilitated weekly platform meetings to ensure compliance and eliminate non-conformance, driving incident resolution and resulting in an 18% reduction in incident reporting

Education

Bachelor of Technology - Electrical & Electronics Engineering

Jawaharlal Nehru Technological University
01.2012

Skills

  • Project Management
  • Effective Communication
  • Project Coordination
  • Technical Expertise
  • Proficient in Microsoft Office
  • ERP System Management
  • Analyzing Engineered Drawings

Languages

English
Full Professional

Timeline

Food Processor

L&H Smith Fruit Co. Limited
11.2023 - 04.2023

Sanitation Worker

Nuts For Cheese
01.2023 - Current

Assistant Project Manager

Sri Gopalkrishna Infrastructure Private Limited
09.2019 - 07.2022

Assistant Construction Manager- Electrical

Larsen & Toubro Limited
07.2018 - 09.2019

Assistant Engineer – Electrical

Nagarjuna Construction Company Limited
08.2016 - 07.2018

Electrical Engineer

Rudranee Infrastructure Limited
10.2014 - 07.2016

Bachelor of Technology - Electrical & Electronics Engineering

Jawaharlal Nehru Technological University
KARTHIK GADE