Summary

With over 20 years of professional experience as a project manager, Mr. Hubenig is an Industrial Systems Engineer with expertise in green and brownfield projects across various industries. As a Construction/Project Manager in the Upstream and Midstream space, he has successfully collaborated with internal stakeholders such as Operations and Drilling/Completions, while also negotiating with external clients on pipeline/facility design, construction, SimOps, and IT development/implementation. His exceptional interpersonal skills and technical expertise have enabled him to execute multiple EPCM projects of varying sizes and complexity, providing valuable front-end advisement, FEED, HAZOP, detailed design, project management, and construction services in both Canadian and American jurisdictions. As a natural leader with comprehensive knowledge of project systems and technical specifications, Mr. Hubenig possesses the necessary skills to guide teams towards successful outcomes amidst challenging circumstances. Throughout his 25-year career, he consistently delivered outstanding results while working for numerous Owner, Construction, and EPC firms. His project portfolio encompasses the entire value stream (upstream, midstream, and downstream) and demonstrates his commitment to driving value and ensuring safety through effective teamwork.

Overview

28
28
years of professional experience

Work History

Senior Program Manager

A&B Rail Services
02.2024 - 11.2024
  • Facilitated stakeholder communication, leading to improved alignment between business objectives and program goals.
  • Managed cross-functional teams to deliver high-quality products within scope and budget constraints.
  • Cultivated strong relationships with external partners, ensuring effective collaboration on joint projects and initiatives.
  • Spearheaded change management efforts during organizational transitions, minimizing disruption while maintaining focus on key objectives.
  • Improved stakeholder satisfaction with regular, transparent communication and updates on project progress.

Construction Manager

General Land & Power
09.2023 - 01.2024
  • 102 MW Solar Farm
  • Developed strong relationships with subcontractors, leading to efficient collaboration on complex construction projects.
  • Oversaw successful completion of multiple projects simultaneously, prioritizing tasks based on urgency and importance.
  • Identified and resolved construction issues promptly to prevent delays.
  • Monitored daily progress on-site to maintain a clear understanding of challenges faced by the team members or any required adjustments in plans or schedules.

Site Manager/ Project Manager

Wood Group
01.2022 - Current


  • Developed strong relationships with clients through consistent communication of project updates and prompt resolution of concerns or issues.
  • Conducted regular site meetings with team members, fostering open communication channels for efficient problem-solving and progress updates.
  • Supporting the project team for the design, construction, and commissioning of a 4400 tonne/day canola crush plant and rail facility
  • Providing input for the construction execution, regulatory/permit support, construction input into design, and coordinating utilities for the project
  • Liaising with residents, farmers, county, towns and government agencies

Project Manager - Consultant

Streamline Inspection
08.2021 - 11.2021
  • Onsite project manager for an NDE company to coordinate the various inspection activities to provide information to the owner group to determine the scope and costs associated with the start-up of a heavy oil upgrader
  • Wrote inspection packages, reviewed reports, and coordinated information between various site contractors

Crude by Rail - Consultant

Serafina Energy
11.2019 - 03.2021
  • Responsible for the DBM, Detailed Engineering, HAZOP, IT, operating philosophies, procurement plans, and construction execution plans for a 25,000-bpd truck trans-loading to crude by rail facility
  • The facility included three 105-car unit train tracks, double side 10 spot rail loading rack, and rail car tracking and automated loading software

Senior Project Manager

Rangeland Engineering - KBR
05.2019 - 10.2019
  • Onsite project manager working with an international EPC (KBR) to inspect an oil upgrader to determine requirements to restart the upgrader after a fire and explosion
  • The information was used to refine a tabletop/document review that generated a class 5 cost estimate to a class 4 cost estimate and provide input on the scope of work for the next phase (define phase)

Senior Project Manager

Rangeland Engineering - EAVOR
05.2018 - 10.2019
  • Responsible for the FEED, Detailed Engineering, procurement, construction, and commissioning of a closed-loop test facility for a closed-loop geothermal project that includes pipeline and surface facilities

Senior Project Manager

Rangeland Engineering - AECOM/IPL
05.2018 - 05.2019
  • Detailed engineering, procurement, construction, and commissioning support working through the general contractor, AECON
  • The facility design included a butane dryer, two butane storage bullets, three loading pumps: one truck and two rails, a new MCC, modified site grading, and existing pipe racks

Senior Project Manager

ALTAGAS
10.2015 - 02.2017
  • Responsible for EPCM liaison, program planning, and construction
  • During the project estimating phase, responsible to deliver project checklists, DBMs, AFE, and, man-hour estimates to meet client requirements and approval
  • During the execution phase, managed all project deliverables including project controls, applications, engineering design, purchasing, expediting, and construction
  • Also included: plant commissioning, start-up, troubleshooting, and optimization

Senior Project Manager

Kinder Morgan Canada
04.2013 - 06.2015
  • Project included DBM, FEED, HAZOP, and detailed design, construction, and commissioning support of a 259,000 bbl/d oil by rail terminal in Strathcona County
  • This project included coordinating the scope of 3 different engineering companies, 5 pipeline owner companies, the County of Strathcona and the various regulatory bodies (AER, SRD, and Strathcona County), CN and CP rail, and Atco Power
  • The scope was for a rail design of 22km of track, relocating high voltage power lines, lowering of 5 pipelines (4 different owners) and one sewer line by 40 feet, design and installation of a 76 spot dual-sided rail car loading rack, installation of 2 – 24” pipelines via horizontal directional drilling and a fiber optic line, moving 1.7 million m3 of dirt
  • The project was started ahead of schedule and at a TIC of $330MM

Senior Project Manager

URS Flint
07.2012 - 04.2013
  • I led projects to construct an eight-kilometer, 18” NRU surface pipeline and upgrades to associated electrical systems in the CNRL Horizon Oil Sands site
  • My efforts included all associated electrical and mechanical work in an operating facility
  • I developed a new scope of work and repaired work completed by previous contractors; I also managed safety, procurement, document controls, and Quality Assurance/Quality Control

Senior Project Manager

AMEC BDR
01.2012 - 07.2012
  • I was recruited to design and construct a SAGD CPU and associated production facilities including steam/production well pairs and water source wells
  • I managed all EPC aspects of the central processing facility, gathering lines, underground pipelines, and regulatory requirements

Project Manager

Husky Energy - Sunrise Energy Project
04.2010 - 01.2012
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Identified plans and resources required to meet project goals and objectives.
  • Coordinated with cross-functional teams to resolve project issues and mitigate risks.

Various

Talisman Energy
08.1996 - 12.2009
  • Held various roles with increasing responsibilities across several disciplines.
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Responsible for EPCM liaison, business development, and program planning and execution.
  • Deliver accurate project checklists, Design Basis Memorandums, AFE and manhours estimates.
  • Managed all project deliverables including Project Controls, applications, engineering design, purchasing, and expediting
  • Successfully planed plant commissioning, start-ups, troubleshooting, and optimization.
  • Worked effectively in fast-paced environments.

Education

Bachelor of Applied Science (B.A.Sc.) - Industrial Systems Engineering

University of Regina

Skills

  • Team leadership
  • Site inspection and management
  • Problem-solving
  • Construction management
  • Site safety
  • Environmental awareness
  • Quality assurance
  • Oil and Natural gas field and facility projects
  • Rail terminal projects
  • Truck terminal projects
  • Co-generation
  • Data-based decision making
  • Field experience
  • Team-leadership skills

Accomplishments

  • History of delivering projects on time, under budget, and safely. Most recently, completed a project two months ahead of an aggressive schedule (14 months), from FEED to on-stream and under budget by 10.4% ($30.3M), TIC $291M.
  • Managed the installation of two co-gen units at the Edson Gas Plant, minimizing the required shutdown time by proactively working with and engaging Operations and AESO.
  • Led a project that outperformed the corporate HSE TRIF (Total Recordable Incident Frequency) target of 1.8 by achieving a TRIF of 0.24. Achieved 750,000 person-hours of lost time incident free.
  • Led a lean team to work with up to 15 critical interfaces (five different engineering companies, seven different owners to either relocate or modify their existing infrastructure, three Regulators), as well as fabricators/manufacturers in Canada and the United States to bring the project through FEED to on-stream, while minimizing the downtime of their customers and interruption to service.
  • Worked with all levels of Government and Stakeholders to streamline the regulatory approval process by proactively explaining the project, understanding their requirements, providing and updating information prior to key milestones.
  • Created a team environment by involving and engaging all stakeholders early and throughout the project to contribute and sign off on relevant decisions to minimize re-work and scope changes.
  • Member of the corporate Emergency Response Team.
  • Nominated and a member of the Change Champion Network for North America – Talisman Energy.

Keycompetenciesstrengths

  • Team Development – Establishing focus, providing motivation to enhance collaboration and individual performance, and empowering team members resulting in very low turnover and team success.
  • Decision Making – Combining extensive experience with analysis of ‘real-time’ data to make effective business/project decisions. Considers all pertinent facts and alternatives to assess the most appropriate action and to provide the rationale to management.
  • Teamwork, Driving Value, Done Safely – Focusing on providing leadership to team members, ensuring that roles and responsibilities are understood, deliverables are completed to meet the Project requirements (safety, schedule, operability, and budget), and ensuring that safety was incorporated in all aspects of operations, constructability, stakeholders, and the environment.

Projectexperiencesummaryandworkhistory

  • Site Manager/ Project Manager, Wood Group – Seconded to Bunge, Canola Crush and Rail, 01/22, Present, Supporting the project team for the design, construction, and commissioning of a 3500 tonne/day canola crush plant and rail facility. Providing input for the construction execution, regulatory/permit support, construction input into design, and coordinating utilities for the project. Liaising with residents, farmers, county, towns and government agencies.
  • Project Manager - Consultant, Streamline Inspection, NDE Inspection, 08/21, 11/21, Onsite project manager for an NDE company to coordinate the various inspection activities to provide information to the owner group to determine the scope and costs associated with the start-up of a heavy oil upgrader. Wrote inspection packages, reviewed reports, and coordinated information between various site contractors.
  • Crude by Rail - Consultant, Serafina Energy, Crude by Rail, 11/19, 03/21, Responsible for the DBM, Detailed Engineering, HAZOP, IT, operating philosophies, procurement plans, and construction execution plans for a 25,000-bpd truck trans-loading to crude by rail facility. The facility included three 105-car unit train tracks, double side 10 spot rail loading rack, and rail car tracking and automated loading software.
  • Senior Project Manager, KBR, Long Lake Upgrader Re-start, 05/19, 10/19, Onsite project manager working with an international EPC (KBR) to inspect an oil upgrader to determine requirements to restart the upgrader after a fire and explosion. The information was used to refine a tabletop/document review that generated a class 5 cost estimate to a class 4 cost estimate and provide input on the scope of work for the next phase (define phase).
  • Senior Project Manager, EAVOR, Geothermal Closed Loop Project, 05/18, 10/19, Responsible for the FEED, Detailed Engineering, procurement, construction, and commissioning of a closed-loop test facility for a closed-loop geothermal project that includes pipeline and surface facilities.
  • Senior Project Manager, Inter Pipeline Fund, ROF Butane Truck and Rail Loading, 05/18, 05/19, Detailed engineering, procurement, construction, and commissioning support working through the general contractor, AECON. The facility design included a butane dryer, two butane storage bullets, three loading pumps: one truck and two rails, a new MCC, modified site grading, and existing pipe racks.
  • Senior Project Manager, KEYERA, Cynthia Power Generation Plant, 04/19, 04/19, Assisted in the design of an HDD and pipeline and construction execution to support a cogeneration project at an existing facility. The key challenge was to ensure that the gas turbine has the capability to handle the varying gas compositions produced by the associated gas plants.
  • Senior Project Manager, ALTAGAS, Townsend and Alton Cavern Programs, 10/15, 02/17, Responsible for EPCM liaison, program planning, and construction. During the project estimating phase, responsible to deliver project checklists, DBMs, AFE, and, man-hour estimates to meet client requirements and approval. During the execution phase, managed all project deliverables including project controls, applications, engineering design, purchasing, expediting, and construction. Also included: plant commissioning, start-up, troubleshooting, and optimization.
  • Senior Project Manager, Kinder Morgan Canada, Edmonton South Oil Rail Facility, 04/13, 06/15, Project included DBM, FEED, HAZOP, and detailed design, construction, and commissioning support of a 259,000 bbl/d oil by rail terminal in Strathcona County. This project included coordinating the scope of 3 different engineering companies, 5 pipeline owner companies, the County of Strathcona and the various regulatory bodies (AER, SRD, and Strathcona County), CN and CP rail, and Atco Power.
  • Senior Project Manager, URS Flint, CNRL Horizon, 07/12, 04/13, Led projects to construct an eight-kilometer, 18” NRU surface pipeline and upgrades to associated electrical systems in the CNRL Horizon Oil Sands site. My efforts included all associated electrical and mechanical work in an operating facility.
  • Senior Project Manager, AMEC BDR, Sunshine Oil Sands – West Els, 01/12, 07/12, Recruited to design and construct a SAGD CPU and associated production facilities including steam/production well pairs and water source wells. Managed all EPC aspects of the central processing facility, gathering lines, underground pipelines, and regulatory requirements.
  • Project Manager, Talisman Energy, Various Programs, 08/96, 12/09, Responsible for EPCM liaison, business development, and program planning and execution. Managed all project deliverables including Project Controls, applications, engineering design, purchasing, and expediting. Plant commissioning, start-up, troubleshooting, and optimization are also among his responsibilities.

Professionalassociations

Association of Professional Engineers and Geoscientists of Alberta (APEGA)

Volunteer Experience

President of the Board of Directors, St. Johns on Tenth Condo Corporation

Coursework

  • Ground Disturbance – Level 2
  • Emergency Response Processes
  • B31.3 and CSA Z662
  • Lean Processes
  • Effective Meetings
  • Active Listening
  • Effective Leadership
  • Gas Processing
  • ATV/UTV
  • Defensive Driving
  • Off-road Awareness
  • WHMIS, H2S ALive, First Aid, TDG, ARW

Languages

English
Advanced (C1)

2006 International Pipeline Design & Construction Award

The HDD that was completed on the Lynx Project was nominated by our industry peers for the most complex and challenging HDD. 

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Certification

  • CPR/AED Certification
  • First Aid Certification

Work Preference

Work Type

Full TimeContract Work

Work Location

On-SiteHybrid

Interests

Hockey

Golf

Water Sports

Wood Working

Cycling

Quote

Every challenge provides an opportunity for creative solutions and patience development.
Karl Hubenig

Affiliations

  • APEGA

Software

Microsoft Suite

Timeline

Senior Program Manager

A&B Rail Services
02.2024 - 11.2024

Construction Manager

General Land & Power
09.2023 - 01.2024

Site Manager/ Project Manager

Wood Group
01.2022 - Current

Project Manager - Consultant

Streamline Inspection
08.2021 - 11.2021

Crude by Rail - Consultant

Serafina Energy
11.2019 - 03.2021

Senior Project Manager

Rangeland Engineering - KBR
05.2019 - 10.2019

Senior Project Manager

Rangeland Engineering - EAVOR
05.2018 - 10.2019

Senior Project Manager

Rangeland Engineering - AECOM/IPL
05.2018 - 05.2019

Senior Project Manager

ALTAGAS
10.2015 - 02.2017

Senior Project Manager

Kinder Morgan Canada
04.2013 - 06.2015

Senior Project Manager

URS Flint
07.2012 - 04.2013

Senior Project Manager

AMEC BDR
01.2012 - 07.2012

Project Manager

Husky Energy - Sunrise Energy Project
04.2010 - 01.2012

Various

Talisman Energy
08.1996 - 12.2009