At Bob Nelson’s Construction, I excelled as a Skid Steer Operator and Concrete Laborer optimizing skid steer use for fuel efficiency and safety, and mastering concrete tasks with precision. Known for reliability and fostering teamwork, significantly enhanced project productivity. Expert in backfilling and site preparation, demonstrating strong operational and collaborative skills. Organized and dependable candidate.
Successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. To seek and maintain full-time position that offers professional challenges, utilizing interpersonal skills, excellent time management and problem-solving skills.
I hold a heavy trailer G endorsement and a clean driving record.
I also extensive computer skills.
*Formed and poured large grade beams (3' and 4')
*Prepped and poured floors up to 50,000 sq feet.
*Prepped and finished concrete patches.
*Operated large walk behind concrete saw.
*Contributed to a positive work environment by cooperating with team members, sharing knowledge and best practices for efficient task completion.
*Maintained project timelines by efficiently operating various concrete tools and machinery, such as power saws, mixers, pumps, and trowels.
*Supported project completion by setting up and dismantling concrete forms, framework, and scaffolding.
*Enhanced project efficiency by assisting in the preparation of construction sites, including cleaning and removing debris.
*Expedited job progress with efficient transportation of materials such as gravel or sand to designated areas within the worksite using wheelbarrows or other vehicles when needed.
*Demonstrated adaptability with successful completion of diverse tasks including foundation work, wall construction, slab creation, retaining walls installations.
*Reduced material waste with accurate measuring and cutting of wooden or metal formwork components for use in forming concrete shapes.
*Installed rebar and molded expansion joints and edges for concrete projects.
*Utilized wheelbarrows, shovels and other tools to move, spread and level concrete.
*Routinely lifted and moved items weighing up to 100 lb pounds.
*Shoveled materials such as dirt, gravel, and asphalt.
*Backfilling Techniques
*Job Site Cleanup
*Soil Compaction
*Site preparation
*Foundation excavation
*Gravel Spreading
*Safe Operation