Pipe Layer
Worked as pipe layer for many companies
Barrie & Toronto, ON
08.2003 - 06.2019
- Handled assembly and installation of underground piping, fittings and valves for storm drains and water mains.
- Repaired sanitary and storm water sewer structures and pipe systems.
- Assessed pipes to ensure zero leakage and proper functionality.
- Adhered to company equipment policies and safety procedures to avoid accidents and mishaps.
- Directed equipment operators and alerted to hazards by using effective hand signals.
- Backfilled excavated locations after completion of work to protect piping and prepare for final grading.
- Graded and leveled trench bases using tamping machines and hand tools.
- Located underground utilities in preparation for digging and marked locations to prevent damage.
- Installed water, sewer and storm drain systems, laying as many as 500 feet per day.
- Operated rollers, front-end loaders and backhoes for site work.
- Cut pipes to correct sizes for specific project requirements using
- Put in new fire hydrants, gate valves and fire lines to support city requirements.
- Operated backhoe, loaded and skidsteer heavy equipment, moving heavy machinery, piping and supplies to target locations.
- Located existing pipes requiring repair or replacement using magnetic and radio indicators.
- Worked successfully with diverse group of coworkers to accomplish goals and address issues related to our products and services.
- Juggled multiple projects and tasks to ensure high quality and timely delivery.