Hello, I am a highly experienced professional with a solid 20 -year background in the construction industry 16 of those years with graham construction. I am a red seal cement mason and level 2 first aider. With a decade-long tenure as a foreman, I have honed my leadership skills and gained extensive knowledge in managing teams effectively. For the past five years, I have excelled as a general foreman, demonstrating exceptional abilities in organizing and overseeing concrete pours, site activities ,maintaining schedules and have transitioned into supervising /managing underground utilities , ensuring seamless operations in this critical aspect of construction. Throughout my career , I have successfully supervised and coordinated various significant projects, including bridge rehabilitations, new wastewater treatment plants, and maintenance work on existing wastewater treatment plants and dams.

Overview

18
18
years of professional experience
1
1
Certification

Work History

General Foreman

Graham
3440 Joyce Ave Powell River, BC
04.2021 - 07.2023
  • Joel has excelled as a general foreman, demonstrating exceptional abilities in organizing and overseeing concrete pours
  • His expertise extends beyond concrete work, as he has transitioned into supervising underground utilities in Powell River, ensuring seamless operations in this critical aspect of construction.

General Foreman

Graham
Powell River, BC
09.2021 - 10.2022
  • Graham was awarded the Linear Works and Lift Stations project in conjunction with the new consolidated plant to be completed in the same scheduled timeframe
  • The linear work comprised roughly 12km of new conveyance pipe, varying in size from 100mm to 450mm, installed conventionally cut/cover and HDD.

General Foreman

Graham
Delta, BC
03.2017 - 04.2021
  • The Annacis Island Wastewater Treatment Plant is Metro Vancouver's largest secondary treatment plant
  • Originally built in 1975, its capacity of 575 MLD serves approximately 1 million people in 14 municipalities
  • Metro Vancouver initiated the Stage 5 Phase 1 expansion project to increase the capacity of the plant additional 250,000 people, which they awarded to Graham and our joint venture partner.

Foreman

Graham
Hudson’s Hope, BC
05.2015 - 10.2016
  • Graham was awarded the general contract for this project in April 2014
  • The primary scope of work for the project was to complete concrete removal and replacement on approximately 60% of the spillway chute; this was broken down into 30 panels representing a section 45m high across the full width (30m) of the spillway.

Foreman

Graham
Vancouver, BC
12.2013 - 05.2015
  • The Burrard bridge involved joint rehabilitation including the replacement of 19 expansion joints across five vehicle lanes and three pedestrian sidewalks, and extensive and elaborate traffic management plans which involved maintaining traffic and pedestrian flow on the bridge deck during construction.

Lead Hand

Graham
North Vancouver, BC
10.2013 - 05.2015
  • This project entailed structural steel work to extend the width of the bridge by way of widening the sidewalks from the existing 1.2m to 2.5m on each side
  • Graham also installed a new 3m high safety fence to improve safety and mobility for cyclists and pedestrians using this primary transportation route.

Lead Hand

Graham
Vancouver, BC
07.2010 - 12.2012
  • The work involved the repair and reconstruction of sections of Vancouver’s seawall which protects the foreshore and the city’s most popular pedestrian and cycling thoroughfare, which surrounds Stanley Park.

Concrete Finisher

Graham
Vancouver, BC
09.2007 - 03.2009
  • The Canada Line Vancouver runs 12 miles between Waterfront Station in Vancouver to the Vancouver International Airport in Richmond
  • In its entirety, the project consisted of 16 passenger stations, two bridges, over nine kilometers of tunnel, parking and bus facilities.

Residential Concrete Placing

Ace concrete
Vancouver, BC
09.2005 - 06.2008
  • Placing finishing driveways, sidewalks , stamped concrete rock walls etc.

Education

High School Diploma -

Dss

Skills

  • Leadership
  • Team management
  • Concrete placing finishing and dry work
  • Supervising underground utilities
  • Running all site equipment(excavator ,bobcats ,telehandler loader etc)
  • Project coordination and supervision
  • Bridge rehabilitations
  • Wastewater treatment plants maintenance and construction
  • Construction planning and scheduling
  • Concrete removal and replacement
  • Structural steel work
  • Traffic management planning

Certification

  • Red Seal Certified Cement Mason
  • Level 2First Aid
  • Bobcat certification
  • Fall protection
  • Awp training
  • Confined space training
  • Lockout training

Timeline

General Foreman

Graham
09.2021 - 10.2022

General Foreman

Graham
04.2021 - 07.2023

General Foreman

Graham
03.2017 - 04.2021

Foreman

Graham
05.2015 - 10.2016

Foreman

Graham
12.2013 - 05.2015

Lead Hand

Graham
10.2013 - 05.2015

Lead Hand

Graham
07.2010 - 12.2012

Concrete Finisher

Graham
09.2007 - 03.2009

Residential Concrete Placing

Ace concrete
09.2005 - 06.2008