Site-based Superintendent with 20 years of experience having a firm focus on safety, environmental and quality. Vast knowledge of all major and minor construction equipment operations required to complete large scale industrial, infrastructure and energy projects throughout Canada.
Cresent Beach Force Main Replacement Stage 3
• Supply, fabrication, and install of HDPE pipe
• Maintain the proximal works of working overtop and beside a live fiberglass sewer main
• Organize sub-contractors and all their works for the project.
• Work with Metro-Van to maintain a positive public relationship.
• Ensure the daily safety checks and proper ground disturbance is performed each day
• organize and attend daily, weekly and monthly safety and construction meetings.
• ensure the safety of workers and visitors at all times.
All works associated with construction for the outfall at the City of Powell River Townsite Wastewater Treatment plant, including:
• Supply, fabrication, and install of ~750 LM of 900 mm OD DR13.5 HDPE pipe
• Supply and installation of backing rings for HDPE manifold
• Supply and delivery of concrete ballasts for the Outfall alignment
Construction Services for the Annacis Outfall Repair Project, Greater
Vancouver Sewerage and Drainage District
• Repairs to the submerged section of the existing AIWWTP outfall Oceanfront Squamish Park Phase A, Oceanfront Squamish Developments LP
• Earthworks for construction of intertidal habitat, two beach areas and adjacent rocky headland viewing areas, including handling and placement of 150,000m3 of crushed rock and rip rap
• Approximately 6,800m2 of ground improvement including stone columns, dynamic compaction, and grouted rammed aggregate piers