Proactive and goal-oriented professional with excellent time management and problem-solving skills. Known for reliability and adaptability, with swift capacity to learn and apply new skills. Committed to leveraging these qualities to drive team success and contribute to organizational growth.
▪ Led the start-up of the $45,000,000 Laurier conversion project and (Office to residential)
- Issued request for proposals (RFPs) and executed contracts for multiple consultants
- Initiated investigative demolition and abatement
- Created the schedule and assisted with design completion
- Supervised continued demolition as the site superintendent
- Provided monthly development reports for the client
▪ Managed, coordinated and supervised multiple projects simultaneously to include:
- Close out the $40,000,000 Albert Street conversion project
- Demolition of five buildings for the Richmond Churchill project
- 20 residential unit upgrades at Metcalfe Street.
- Design of the Metcalfe Boiler replacement and fire retrofit
- Design and tendering of Cooper Street Balcony repairs
▪ Risk, Reporting and Change Management Lead for a $450,000,000 Radiopharmaceutical Facility Retrofit Project.
- Formed the Basis of Estimate for each of the work breakdown structures and produced the overall Class A estimate.
- Implemented the risk management procedure and led the overall change management process.
▪ Project manager for:
- $23,000,000 City of Iqaluit Operations Center.
- $20,000,000 Ronald McDonald House Charities Ottawa Expansion Project.
- $80,000,000 H.J. McFarland Long Term Care Redevelopment Project.
- Fo Guang Shan Temple
- Multiple Government of Canada projects involving laboratory equipment, workforce reintegration, logistics and IT.
▪ Led and coordinated the activities of a team of discipline specific contract administrators and project coordinators to administer the construction contract of the $600,000,000 multi-building, LEED Silver Carling Campus Project (Government of Canada).
- Supervised the documentation process for site instructions, change orders, shop drawings, alternate requests, review reports and requests for information to ensure the completion and accuracy of contract documentation.
- Coordinated design and documentation to support modifications to construction plans.
- Approved contractor progress claims and prepared Certificates forPayment.
- Monitored performance of site reviews for conformance to contract documents and relevant building and safety codes.
▪ In charge of tendering scopes of work, administering subcontracts and maintaining the one-year schedule for the fast track $23,000,000 RCAD Student Housing LEED Silver project.
− Presented change orders to all stakeholders for approval and execution.
− Led OAC meetings and prepared meeting agendas, minutes, schedule and budget updates.
− Supervised document control to include drawings, specifications, testing reports, site instructions, RFIs, submittals, LEED documents and closeout documents.
▪ Executed and administered all consultant contracts, led the initial design and coordinated the Pre− consultation Meetings with the City of Ottawa for the $9,000,000 Carruthers Project and the $7,000,000 Lisgar Project simultaneously.
− Coordinated the design with the client’s needs and submitted it for stakeholder review.
− Created multiple iterations of development schedules andbudgets.
− Reviewed and approved all consultant progress claims.
− Led the design for the submission of the Site Plan Control Application, Building Permit Application, and Committee of Adjustments Application to the City of Ottawa.
▪ Initiated construction for the previously mentioned Carruthers Project.
− Created and tendered all scopes of work, executed subcontracts, initiated construction and administered all subcontracts for the Carruthers project.
− Executed document control measures to include drawings, specifications, testing reports, site instructions, RFIs and submittals.
▪ In charge of tendering, executing and administering all contracts and purchase orders for a
$3,000,000 Boys & Girls Club Renovation project.
- Ensured that the original scope of work was under budget.
- Refined the scope of work to ensure that the client’s requirements were met.
- Maintained original schedule despite unforeseen challenges to include asbestos abatement and structural issues.
- Executed all document control to include drawings, specifications, testing reports, site instructions, RFIs and submittals.
▪ Gathered requirements, developed scopes, scheduled construction, and tracked and documented all information for a $8,000,000 residence renovation and conversion project.
▪ Planned and initiated projects with extensive safety, regulatory and licensing requirements on a nuclear facility to ensure that they would meet all cost, schedule and quality objectives.
- Scheduled and created budgets for projects that were up to three years in length.
- Ensured all PMI process groups were incorporated into the schedules and budgets.
▪ Responsible for the design and partial construction of both Immanuel House and Apartment A projects ($40,000,000).
- Tendered, executed and administered subcontracts while revising design and
- substituting products to reduce costs.
- Created schedules and developed cashflow reports to assist in securing project financing.
- Executed document control measures to include drawings, specifications, testing reports, site instructions, RFIs and submittals.
- Reviewed and approved consultant and subcontractor progress claims.
▪ Supervised the closeout for the Jamieson Mills Apartment project ($7,000,000).
- Ensured that deficiency reports were completed on the overall building and each apartment.
Led negotiations on the conditions of final payment for subcontractors.
▪ Executed contracts with general contractors and supervised construction for both the SWT Tunnel ($24,000,000) and Woodroffe Avenue Pedestrian Bridge ($3,000,000) simultaneously. These projects are components of an overall $100,000,000 multi component project.
▪ Executed and supervised an additional $6,000,000 in changes for the Tunnel and Bridge projects.
▪ Coordinated construction between the three components of the project, between project and adjacent properties, with governing agencies and through multiple layers of consultants.
▪ Initiated and enforced Quality Assurance / Quality Control programs for the Bridge and Tunnel to ensure compliance with the contract documents and the corporate QA/QC plan.
▪ Updated schedules, developed cashflow reports, submitted billings and paid subcontractors in a timely and accurate manner for all three components of the project.
▪ Responsible for scheduling, pricing and executing changes, issuing site instructions and tracking submittals for the multi−phased $15,000,000 Emergency Room Renovation at The Ottawa Hospital.
▪ Planned and executed construction projects from preconstruction to close−out to include the
▪ Wakemed P5 parking deck ($10,000,000) and Shoppes of Kildaire retail renovations ($2,700,000).
▪ Ensured repeat business by instilling positive working relationships with owners and consultants.
▪ Prepared accurate billings for owners while ensuring prompt payment of subcontractors.
▪ Prepared cost estimates from conceptual, schematic, design development and construction drawings for design−build, negotiated and tendered contracts.
▪ Estimated projects ranging from $300,000 to $150,000,000 to include commercial, retail and healthcare projects.
▪ Performed detailed quantity take−offs to include earth work, concrete work, subcontractor work, labor and material while planning and scheduling the projects.
▪ Reviewed design options and recommended solutions based on cost, feasibility and availability of materials.
▪ Platoon Leader: Responsible for the training, welfare and combat readiness of over 40 combat personnel.
▪ Executive Officer: Responsible for logistical support, maintenance and personnel administration of over 425 soldiers.
▪ Intelligence Officer: Analyzed enemy disposition in order to anticipate enemymovements.
▪ Advised commanders so that they could make informed tactical decisions.