Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Timeline
Generic

james olsen

Rocklin

Summary

have started at the bottom was trained to do this specialty trade over the last 20 years was at one time the lead installer

Dedicated Installer with extensive experience at River City Plastics, specializing in high-impact wall coverings. Proven ability in equipment installation and quality assurance, ensuring customer satisfaction through meticulous attention to detail and effective time management. Committed to safety practices and maintaining a professional appearance on every project.

Overview

20
20
years of professional experience
1
1
Certification

Work History

Installer

River City Plastics
05.2005 - 06.2025

Install FRP wall panels high impact wall covering slat wall chair rails crash rail corner guards

Education

General Studies

Del Oro High
Loomis, CA
06.1996

Skills

  • Attention to detail
  • Time management
  • Positive attitude
  • Power tool operation
  • Following safety practices
  • Customer service
  • Customer satisfaction
  • Pre-installation site prep
  • Equipment installation
  • Worksite preparation
  • Worksite safety and maintenance
  • Quality checks
  • Troubleshooting
  • Blueprint reading
  • Hardware installation
  • Professional appearance
  • Safety procedures
  • Inventory accountability
  • Hand-eye coordination
  • Quality assurance
  • Preventive Maintenance
  • Inventory oversight
  • Installation updates
  • Product inspection
  • Construction management
  • Work orders
  • Electrical wiring
  • Diagnostics and troubleshooting
  • Supply inventory management
  • Commercial construction experience
  • Residential and commercial installations
  • Company vehicle maintenance
  • Scheduling
  • FLUENT IN LANGUAGE
  • Project estimation and bidding
  • Drywalling
  • Plumbing
  • Project management
  • Construction
  • Loading and unloading
  • Repair techniques
  • Safety awareness
  • Flexible scheduling
  • Coaching and mentoring
  • Material selection
  • Estimating
  • Equipment handling
  • Taking precise measurements
  • Installation expertise
  • OSHA regulations compliance
  • Sheet metal
  • Code requirements
  • Field verification
  • Maintenance and repair reporting
  • Multitasking Abilities
  • Problem-solving
  • Teamwork and collaboration
  • Team building
  • Multitasking
  • Organizational skills

Accomplishments

I was able to obtain my contractor license to start my own business however my kidney failed and ended up with a transplant

Certification

I am osha certified and also studied to pass my contracts test

Timeline

Installer

River City Plastics
05.2005 - 06.2025

General Studies

Del Oro High
james olsen