Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

Jaime Jimenez

Stockton

Summary

During the course of my 20 year Telecom and underground construction career, I have learn that in order to lead you must first learn to take directives and be able to convey those ideas to others by conducting ones self in a professional manner, therefore enhancing productivity and ensuring quality in construction management. My expertise in project management and problem-solving facilitated the timely resolution of issues, adherence to safety protocols, and successful project completions, by applying this approach to team building, cross training and expanding everyone view as to the task at hand has help me develop over the course of my career. My approach significantly reduced workplace injuries, demonstrating a strong blend of leadership and site management skills.

Overview

25
25
years of professional experience
1
1
Certification

Work History

Construction Manager

Gilco Group
05.2024 - 01.2025
  • Supervised team of 20 construction workers to maintain productivity and quality of work.
  • Oversaw successful completion of multiple projects simultaneously, prioritizing tasks based on urgency and importance.
  • Identified and resolved construction issues promptly to prevent delays.
  • Monitored daily progress on-site to maintain a clear understanding of challenges faced by the team members or any required adjustments in plans or schedule.
  • Implemented safety protocols for reduced workplace injuries, conducting regular site inspections and safety meetings.


Construction Manager / Project Manager

JPI Construction / MKT Engineering
05.2019 - 01.2023
  • Supervised team of 25 construction workers to maintain productivity and quality of work.
  • Oversaw successful completion of multiple projects simultaneously, prioritizing tasks based on urgency and importance.
  • Collaborated closely with clients to ensure project objectives were met, maintaining transparent communication throughout the process.
  • Monitored daily progress on-site to maintain a clear understanding of challenges faced by the team members or any required adjustments in plans or schedules.
  • Handle or dispatch in house restoration crews from within company or contracted with sub contractor(s) for all concrete or asphalt restoration.
  • Communicated daily with vendors to keep project fully operational.
  • Verified completed projects met approved time, quality, and cost estimates.
  • Conducted Pre-con site meeting with city inspectors and or vendors
  • Ensured and maintained all USA call outs and maintain USA logs therefore ensuring employees worked safety when assigned task.
  • Conducted site visits to verify USA utility markings, addressing discrepancies promptly for uninterrupted project progress.
  • Performed or delegated to ensure that JSA and Daily Equipment and vehicle inspection were done daily.

Foreman / Construction Manager

Paramount Utility Corp.
06.2015 - 05.2019
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Checked equipment to determine if maintenance was required.
  • Conducted site visits to verify USA utility markings, addressing discrepancies promptly for uninterrupted project progress.
  • Performed or delegated to ensure that JSA and Daily Equipment and vehicle inspection were done daily.
  • Supervised 20 -30 employees ( 2 Drill Crews, 1 Open excavation crew plus hand hole / Manhole placement crew and or restoration crews.


Ditch Witch Locator

JTS Trenching
03.2014 - 05.2015


  • Assisted in the development of standard operating procedures for Directional Drill teams, streamlining processes for increased productivity.
  • Optimized locator performance through regular equipment calibration and maintenance checks.

Ditch Witch Locator /Crew Foreman

AC Square
02.2000 - 03.2014
  • Located underground utilities accurately by using advanced vacuum equipment and daylighting existing utilities.
  • Ensuring that crew completed JSA and Daily production logs
  • Maintain daily bore logs
  • Adapted quickly to changes in project scope or requirements, adjusting locate strategies as needed for optimal results.

Education

Associate of Arts - Political Science

San Joaquin Delta College
Stockton, CA
06-1992

High School Diploma -

Franklin High School
Stockton, CA
05-1990

Skills

  • Project management
  • Problem-solving
  • Site management
  • Safety compliance
  • Job and material estimates
  • Cost control
  • Cost estimation
  • Time management
  • Concrete and asphalt estimation
  • Ditch Witch Subsite locator

Certification

*CPR & 1ST AID CERTIFIED

*TRAFFIC CONTROL AND FLAGGER CERTIFIED

*DITCH WITCH SUBSITE LOCATOR CDERTIFICATION



Languages

English
Native or Bilingual
Spanish
Native or Bilingual

Timeline

Construction Manager

Gilco Group
05.2024 - 01.2025

Construction Manager / Project Manager

JPI Construction / MKT Engineering
05.2019 - 01.2023

Foreman / Construction Manager

Paramount Utility Corp.
06.2015 - 05.2019

Ditch Witch Locator

JTS Trenching
03.2014 - 05.2015

Ditch Witch Locator /Crew Foreman

AC Square
02.2000 - 03.2014

Associate of Arts - Political Science

San Joaquin Delta College

High School Diploma -

Franklin High School
Jaime Jimenez