I’m a Hardworking Carpenter proficient in form work. Strong background working on the Stantec tower, Ultima tower, Encore tower projects providing on-time delivery and exceptional craftsmanship. Bringing 12 years in carpentry and related positions.
Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level carpentry position. Ready to help team achieve company goals.
Encore Tower (Edmonton, Alberta)
- Start from 27th floor to 45th
Finish the last form work
March 2019 - February 2020
Great experience
South Park (Edmonton, Alberta)
- 5-storey building Finish
Londonderry Affordable Housing Redevelopment (Edmonton, Alberta)
- 240-unit development in North Edmonton
•February 2021 - June 2021
The View @ Grandin City (Edmonton, Alberta)
- 23-storey tower located in Edmonton's most coveted communities
-start from the raft slab finish to the very top of the building (23 th) story.
June 2020 - September 2021
Capital Care Norwood
Building type: low-rise building
Height (estimated) 24.63 m
Floors (above ground) 7
August 2021 -November 2021
Garneau University Area (Edmonton, Alberta)
- West tower 23 storeys & East tower 30 storeys
I’m currently working on the west tower
I became a lead hand and was responsible for overseeing a group of workers assigned to me, ensuring all tasks were completed in a safe and timely manner. I’m working with the Doka system elevator core and stair core, as well as I'm in charge of the precast stair and landing. On top of that, I'm helping out with flying tables, infils (decking) making sure everything goes smoothly and safely.
Always trying to perform the best possible and try to motivate my co-worker with my work ethic 💪🏼
November 2021- December 2022 (finish project)
Stantec Tower (Edmonton, Alberta)
- Flying tables, working on deck crue, patching tables with plywood
- Working in core
- Building: Columns, curbs, slab edge, building tables with Peri system and joist, planters
- Stantec Tower (Edmonton, Alberta)
- Tallest tower in Western Canada
- Start since ground floor and finish to the 69th floor
-working on 4 day’s schedule (12 + hours days 6 days a week)
Windermere Parkade (Edmonton, Alberta)
- Installing deck (scaffold, ALUMA, fast deck, walls)
- Installing columns
- Building handrails on deck, slab edge, boxes, building footings
- Striping fastdeck, reshoring form work
-Building 10 ft walls and 2-3 ft curbs.
-form work building Beams
-
Westrich pacific company gave me a MVP diploma for Ultima tower Edmonton downtown, I was awarded for my hard work and dedication in 2015.
Pagnotta Excellence reward I was awarded 2021 for my excellent skills as a leader and hard worker.