Canadian Citizen and holding Valid Canadian Passport.
General Site Superintendent for the construction of High/Midrises building and ICI projects with
Advanced knowledge of various complex construction disciplines, Value Engineering proposals, safety
regulations, scheduling, cost control and quality control. Leading Structural Completion of reinforced
concrete high-rise structures SUMMARY OF QUALIFICATIONS
Supervised and performed the completion of full cycle construction from demolition to full occupancy
and condo registration as General Site Superintendent.
Overview
10
10
years of professional experience
Work History
Site superintendent / Finishing site superintendent
Toddglen
Toronto, Ontario
10.2021 - Current
Supervised in house Forming from the beginning to the end including Slab, Verticals and walls
placements
Reviewed and analyzed site plans and blueprints in order to monitor and ensure compliance with plan
specifications
Acted as a liaison between operations, subcontractors and vendors
Supervised a staff of 150+ employees, which included labourers, carpenters, various trades
Demonstrated above adequate knowledge and skills in reading and interpreting construction to
enhance the quality of finished product and having smooth construction with minimum impact on daily
production rate
Worked with local city inspectors to obtain building inspections and Certificates of Occupancy
Set up OAC and coordination meetings in order to meet the deadlines, schedules, budgets and
expectations
Drafting construction master schedule, Critical paths and 2 weeks look ahead to meet hard deadlines
and tight schedules
Resourceful, reliable, and dedicated to achieving both profitability while maintaining the site safety
standards, Leading Structural Completion of reinforced concrete high-rise structures L28 to MPH and coordinated
with assistant superintendents/finishing superintendents to meet milestones/project deadlines
Enforced safety protocols to ensure job site consistently meets or exceeds safety standard
Communicated with architects, consultants, and engineers to increase level of accuracy and minimize
deficient work
Coordinating trades/ sub contractors and laborers at job site- Make sure all works to be done within
scope of work in the contracts and follows construction schedule at site
Communicated with Senior Construction Manager and Project Managers on progress of project
Scheduled daily and weekly site meetings with trade foremen and discuss details of work need to be
done per week
Day to day safety inspections enforcing safe construction practices every day at the job site
Scheduled rough in/finishing work at different stages of the project, Material takes off building
supplies
Scheduling inspections, did walk through with all city inspectors ( Building, Hvac, Plumbing,
landscaping) for all preboard, occupancy inspections
Led JHSC meetings, safety talks, create tool box talks, trained and mentored site staff to achieve
highest safety performance Site Superintendent
H.L developments
, Ontario
10.2017 - 10.2021
Toronto 2150 / 2152 Projects (3 towers) 2229 Kingston Road (2 towers) Demo, Excavated, shored
(Caissons + Tiebacks) 2 level UG and finished superstructure of the new built Cinema project got
attached to the existing mall structure - 30 meters high for 2 levels above ground steel beams and deck -
$70 Million Value
Demo, Excavated, shored (Pile and lag+ Raker) 2 level UG finished structure of 198 and 135 – 14 and 18
story 2150/2152 projects
Demo, Excavated shored ( Pile and lag+ Tiebacks) 2 level UG for 256 units in total for 2 towers
Leeding inhouse forming for all listed projected for VHL developments In addition: (Finishing / prep for
final occupancy and ready to turn over to Condo Corp for all 5 towers including Tarion Warranty related
items and performance audit) Site Superintendent, Ass Site superintendent
TIMESGROUP, Ontario
Toronto
Brampton
01.2014 - 01.2017
Coordinated inspections for quality control, health and safety, and local authorities
Ensured contract specifications were met, and construction by all trades was on schedule and within
budget
Scheduled subcontractors, equipment, consultant inspections, and vendors to line up with the project
milestones and critical path to ensure timely completion of the project
Communicated to the project team any foreseeable conflicts in construction progress for early
resolution
Assisted in obtaining local permits
Approved drawing and detail revisions as necessary with the project team
Project Lists:
101, Toronto
205 Queen St East, 1571 Sandhurst circle- finished the superstructure for cinema 1 level underground 30M high building
with 2 floors - ( Demolition, excavation, shoring, forming, superstructure steel frame)