Summary
Overview
Work History
Education
Skills
Languages
Certification
Timeline
Generic

ILYAS ATACAN

EDMONTON,CA

Summary

I have 2-3 years of experience in the construction industry, with a focus on plumbing, pipe laying, and water systems. I've worked on industrial and commercial projects, gaining hands-on experience with water and wastewater systems. I always make sure to complete tasks on time and safely, and I work well in a team to help projects run smoothly.

Overview

4
4
years of professional experience
1
1
Certification

Work History

Insulator

Brock Group
06.2025 - 06.2025
  • Applied and handled insulating products such as foam, fiberglass and cloth with mud.
  • Protected team members and building users from harm by adhering to strict asbestos remediation procedures when locating, removing and sealing off old insulation.
  • Prepared surfaces for insulation with help of adhesives, cement and other compounds.

GENERAL LABOUR

NORTHCAN CONSTRUCTİON
07.2023 - 12.2024
  • Applied and handled insulating products such as foam, fiberglass and cloth with mud.
  • Cultivated safety and efficiency at each work site by identifying potential hazards and promoting workplace safety to all team members.
  • Applied and prepared cement, epoxy, and other durable adhesives as part of insulation installation.
  • Specialized in industrial plumbing, including the installation and repair of water systems, drainage systems, and large-scale pipework.
  • Installed and connected water pipes, drainage systems, and fixtures for industrial and commercial buildings.
  • Assisted with wall construction, including brick, gas concrete, and drywall installation, particularly in industrial structures.
  • Supported the team in managing the construction and installation of plumbing systems for a major industrial facility.
  • Worked on a variety of tasks, including foundation work and heavy-duty equipment use to transport materials.
  • Assessed project scope, material requirements and blueprints to gain valid understanding of project details.


GENERAL LABOUR

AYZA BUILDING
02.2021 - 06.2022
  • Played an active role in plumbing installation, including water and drainage systems, pipe laying, and fixture connections.
  • Constructed both interior and exterior walls using brick, gas concrete, and drywall materials.
  • Installed drywall and performed finishing work, ensuring a smooth and professional appearance.
  • Assisted in foundation work, excavation, and concrete pouring.
  • Used construction machinery, such as forklifts and concrete mixers, for material transportation and placement.
  • Maintained safety protocols on-site, ensuring compliance with industry standards.

Education

KARADENIZ TECHNICAL UNIVERSITY
01-2020

Skills

  • Skilled in maintenance and organization
  • Diligent and focused
  • Construction best practices
  • Precision cutting

Languages

English
Native or Bilingual

Certification

CONSTURACTION SAFETY TRAINING SYSTEM (CSTS 2020)-FUNDAMENTALS


WHMIS 2015 WORKER EDUCATION



Timeline

Insulator

Brock Group
06.2025 - 06.2025

GENERAL LABOUR

NORTHCAN CONSTRUCTİON
07.2023 - 12.2024

GENERAL LABOUR

AYZA BUILDING
02.2021 - 06.2022

KARADENIZ TECHNICAL UNIVERSITY
ILYAS ATACAN