Overview
Work History
Education
Timeline
Generic
Glenn Fraser

Glenn Fraser

Sherwood Park

Overview

1
1
year of professional experience

Work History

Rig Welder

Surerus Pipeline
08.2023 - 10.2023

48" pipeline for TC Energy . Elko Project. Main line 48'' and tie in's useing RMD metalcore roots/ pulse hot pass then fill and cap useing CRC Evans M300 automatic welding machine. fluxcore fill and cap process.

KLTP welder

Kiewitt
10.2022 - 07.2023

Transmountain Pipeline Burnaby mountain tunnel project.

2 month long CRC Evans bug school in vancouver, useing RMD metalcore downhand roots, then strapped on CRC M500 Bugs, Bugs were metalcore downhand fill/cap. 3 30" pipe stacked on top of each other with 11" between pipes,

OCL group rig welder

01.2021
  • Kearl lake facility
  • 48’’ pipeline
  • Down hand 8010 stick welding

FLINT rig welder

- 10.2022
  • Pipe spool fabrication at Carsland Nutrien plant
  • Carbon steel pipe also stainless steel tig fabrication

Quinn Contracting rig welder

  • Maintenance contract involving pipe spool fabrication, structural steel fabrication, also tie in’s in the pipe rack

Education

journeyman welder -

Red Deer College

Timeline

Rig Welder

Surerus Pipeline
08.2023 - 10.2023

KLTP welder

Kiewitt
10.2022 - 07.2023

OCL group rig welder

01.2021

FLINT rig welder

- 10.2022

Quinn Contracting rig welder

journeyman welder -

Red Deer College
Glenn Fraser