Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Gaurang Modi

London,ON

Summary

Aspiring engineering professional with success in managing communications and technical workflows under tight deadlines. Seeking role in an organization that values hard work and commitment to excellence. Possess strong technical aptitude with ability to quickly learn engineering methods and concepts. Strong communications skills leveraged to cultivate relationships with key internal and external stakeholders. Consistently devote extra time and effort required to complete critical tasks.

Overview

14
14
years of professional experience

Work History

CNC Machinist

Johnson Electric
01.2020 - Current
  • Study job orders and interpret blueprints to determine machining operations to be performed
  • Verify dimensions of parts machined using micrometers, calipers, and other precision measuring instruments
  • Perform routine maintenance on equipment and machinery
  • Enter codes specifying speed, feed and cut of the tool path for computer numerical controlled (CNC) machine tools
  • Trouble-shooting, preventative maintenance and repair of high-speed, close tolerance equipment
  • Correctly remove unneeded tooling and install all required tooling, Drills, Insert Holders, and Inserts Reamers
  • Correctly remove unneeded fixture and install all required fixture, Jaws, Chucks, Main Spindle, Sub Spindle, Collets Pads, Bar feeder inputs
  • Participation in a variety of corrective action teams, problem solving teams to improve or correct problems and issues in the current operations
  • Responsibilities will also involve overhauls of the various high-speed lines
  • Responsible for all paperwork of area of machinery assigned
  • Working with computer numeric controlled heavy machinery from setup to operation to produce parts and tools from metal, plastic, or other materials
  • Final inspection using micrometers, calipers, comparators, indicators, CMM.

Quality Control Inspector

Vari-form
09.2019 - 12.2019
  • Inspection-performing related diagnostic testing (computerized & manual)
  • Collect and compile statistical quality data (SPC)
  • Maintain accurate documentation of production inspection reports
  • Provide management with detailed quality reports as required-daily, weekly & monthly
  • Analyze data to identify areas for improvement in the quality system
  • Develop, recommend and monitor corrective and preventive action
  • Read blueprints and specifications, monitor operations to ensure that they meet production standards
  • Recommend adjustments to the assembly or production process Inspect, test, or measure materials or products being produced
  • Measure products with rulers, calipers, gauges, or micrometers
  • Document internal audits and other quality assurance activities
  • Additional projects and tasks as assigned.

Senior Mechanical Engineer

Garden Silk Mill's Pvt Ltd.
01.2011 - 05.2018
  • Hands on experience for operation and maintenance of machines like Air compressor, VAMS, Boilers, Primary Heater
  • Perform the repair and service of Centrifugal pumps, Reciprocating Pumps, compressor, pneumatic valves and cylinders
  • Performed the Inspection and testing of the heat exchanger as per specification
  • Prepared ISO 9001 & OHASH related report each quarter of the year
  • Replacement and Maintenance conveyer belt and roller and ball bearings including packaging system
  • Contributed the implementation of capital projects
  • Coordinated, supervised and monitored overall project execution activities
  • Work with project management team to identify changes and impact to the project, manage change control in the field
  • Prepared project charter, test plan and project execution plan for various capital/small/medium projects
  • Maintain plant equipment and trouble shoot to ensure minimal downtime of machine parts production facilities
  • Expertise in reading drawings and technical documents to ensure proper installation and erection of equipment and systems
  • Examined tools, apparatus, and parts for defects, and to make sure good performance
  • Performed the mechanical inspection which covers structural steel inspection, stationary/ rotating equipment installation, fire-proofing & insulation installation of piping as well as equipment
  • Installed, aligned, dismantled and moved stationary industrial machinery and mechanical equipment such as pumps, fans, tanks, according to layout plans using hand and power tools
  • Carried out scheduled preventive maintenance and annual shut down maintenance
  • Performed the engineering calculations for capital/small/medium projects
  • Responsible for the scheduled lubrication of overall plant rotary equipment
  • Overhauling and testing of PSV as per specification
  • Managed manpower and allocation of work
  • Kept records of the technical documents like test certificates, drawings, O&M manuals for equipment
  • Involved in cold trials and overall commissioning of the mechanical equipment for the start up
  • Ensured the proper quality of work and safety rules and standards are maintained during project execution work at site
  • Prepared preventive maintenance schedule for the plant machinery
  • Coordinate, prepare and organize the monthly cost report based on project scope, with all supported progress drawings / pictures and quantity installed
  • Prepared monthly cost report and follow up report for management review
  • Coordinate and organize cost economic planning review report each quarter of the year
  • Basic Working knowledge of ERP for planning & work-permit
  • Develop and maintain schedule for Booster Pump House Project
  • Update on project progress on a weekly basis to the Lead and also meet the deadlines for various projects.

Education

Post-Graduation in Practical Elements of Mechanical Engineering -

Fanshawe college
London, ON
04.2019

BE in Mechanical Engineering -

Pune University
Pune, India
07.2010

Skills

  • CMM
  • Intermediate with SAP/ERP software
  • AutoCAD
  • Solid works
  • Robotics
  • MS Office (PowerPoint, Excel, Word, Outlook, MS Teams)
  • Blueprints reading
  • Multi-Axis Machining
  • Equipment set up
  • Precision measurement
  • Mechanical Troubleshooting

Languages

English
Full Professional

Timeline

CNC Machinist

Johnson Electric
01.2020 - Current

Quality Control Inspector

Vari-form
09.2019 - 12.2019

Senior Mechanical Engineer

Garden Silk Mill's Pvt Ltd.
01.2011 - 05.2018

Post-Graduation in Practical Elements of Mechanical Engineering -

Fanshawe college

BE in Mechanical Engineering -

Pune University
Gaurang Modi