Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Gary Allan

Kitchener,ON

Summary

Driven and detail-oriented professional with a proven track record in the construction and manufacturing sectors, notably with Hutchison Designs. Excelled in roles requiring heavy lifting, time management, and safety procedures, enhancing worksite efficiency and product quality. Skilled in machine operation and team leadership, consistently achieving project goals through a strong willingness to learn and attention to detail.

Overview

29
29
years of professional experience

Work History

Laborer

3D Framing and Finishinng
07.2020 - Current
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Expanded skill set through continuous learning of new techniques, tools, and equipment related to laborer tasks.
  • Improved worksite efficiency by maintaining clean and organized work areas.
  • Performed general housekeeping and cleaning tasks.
  • worked as a team member installing windows and doors, vinyl siding, soffit, fascia, and eavestrough

Laborer

Hutchison Designs
03.2018 - 03.2020
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Expanded skill set through continuous learning of new techniques, tools, and equipment related to laborer tasks.
  • Used measuring tools such as gauges and tape measure to identify conforming parts during production.
  • Upheld company reputation for quality workmanship through dedication to best practices within the laborer role.
  • Worked as a team member involved in interior renovations,, such as kitchens, bathrooms, flooring, drywall, and millwork

Machine Operator

Trillium Metal Stampings
06.1995 - 10.2017
  • Followed detailed instructions to operate machines with accuracy and produce quality products.
  • Set up and adjusted equipment and properly configured machines for daily operation.
  • Complied with company and OSHA safety rules and regulations.
  • Trained new employees on proper machine operation, ensuring adherence to company standards and safety guidelines.
  • Monitored machines during operation to detect sounds of malfunction or excessive vibration and adjusted machines to eliminate problems.
  • Collaborated with team members to optimize production processes and improve overall performance.
  • Maintained open communication lines with supervisors regarding project status updates, potential delays, or any concerns affecting production timelines.
  • Calibrated, tested, and adjusted machine settings or controls in preparation for production operations.
  • Worked as a welding lead hand, programming robotic welders, training staff, working with tool room on tooling requirements

Education

Automated Systems Control - Welding, Hydraulics, Automation

Conestoga College Institute of Technology And Advanced Learning
Kitchener, ON
05.2001

Skills

  • Willingness to learn
  • Attention to Detail
  • Safety awareness
  • Heavy Lifting
  • Time Management
  • Job Site Cleanup
  • Safety Procedures

Languages

English
Professional Working

Timeline

Laborer

3D Framing and Finishinng
07.2020 - Current

Laborer

Hutchison Designs
03.2018 - 03.2020

Machine Operator

Trillium Metal Stampings
06.1995 - 10.2017

Automated Systems Control - Welding, Hydraulics, Automation

Conestoga College Institute of Technology And Advanced Learning
Gary Allan