I am looking for the opportunity to safely utilize my experience and knowledge into a growing company. I would also like to leave a positive impact and create ways for the company to benefit from my work ethics. Thirdly I aim to gain experience as I study to further on to my 2nd Class Power Engineering Ticket.
Assist Supervisor (Control Room Operator) with overseeing plant operation (1300 Psi Biomass Fluidized Bed Boiler & 17 Mw Steam Turbine)
Rounds/Sequential Operation
Plant start Up & Shut down Procedures
Create/Break Vacuum For Condensing turbine
Place turbine on Barring gear
Drain & Vent Steam Vessels/Lines, Admit sealing steam
Manually Ignite furnace bed Burners
LOTO for Fuel, Conveyors, screws and other moving equipment.
Water Treatment.
Prime and vent Pumps.
Control Condenser temperatures.
DCS Operation (Fuel Control, Emissions, Water levels & Pressures).
Main Power Grid to Emergency Generator Cross over
Ground Fault Circuit Interruption.
Calibrate Emission System.
Water Filtration.
Skidsteer & JLG Lift operation.
Chemical Inventory/Disposal and receive.
Turbine Emergency Lubricant Pump testing
Confined Space & Entry/ Hatchwatch
Housekeeping
Rotary Shaft seal Maintenance
Chain/Sprocket drive & bearing system maintenance
Identify Malfunctioning equipment, (Sounds, vibration, leaks, etc).
-Plant start up procedures/Shut Down Procedures
-Operate & Isolate inlet/outlet Water valves, Steam Valves, Recirculation valves & Vents to Boiler Equipment
- Distribution Of water to De-aerator, Flash tank & Boiler
-Feedwater Pump Operation
-Condensate return line isolation
- Steam Header distribution, isolation & venting
-Pneumatic Steam Control valve Operation
-Emergency Generator Operation
-Emergency Fire Water Pump Operation
-Safety Lockout Procedures
-Water Tests/Addition of Chemicals
-Fuel System distribution (Activating Oil Pumps & Natural Gas Pressurization).
- Closed Loop Heating system Operation
- Compressor Operation
-Sight Glass/Water Column Blow Down
-Low Water Cutoff & High water/Low water Alarm Testing
-Boiler Permissive Resets
-Boiler Pressure Switch adjustment
- Bypass/Isolate Flash Tank
- Boiler Automatic Water Control Valve Operation
-Softener/De-alkalizer regeneration
- Logbook/ Routine Rounds
- Offload Light Oil fuel to Oil Tanks
- Observe Furnace flame/ FD Fan operation.