Focused Foreman considered expert in planning, assigning and directing work tasks. Dedicated team player committed to maintaining safe, clean job sites. Pursuing role where hard work and dedication will be highly valued.
Responsible for day to day operations and leading a crew in constructing 3 and 4 party utility jobs in new subdivisions installing power communications and gas
Installed streetlight bases with auger truck to epcor and fortis standards
Responsible for employee hours and material tracking and organizing sub contractors for additional work
Main Lead on Alberta transportation streetlight installation northern Alberta contract. Was responsible for streetlight placements, working with survey,submitting locate requests, organizing logistics and materials, overseeing drilling operations for raceway pipe for cable, organizing sub contractors (hydrovac services , fillcrete ordering ), setting up accommodations for crew when out of Edmonton area, organizing assisting in the installation of streetlight bases ,cable and light pole installations, working with Alberta transportation to coordinate energization of all sites, submitting inspection requests for each site, was responsible for submitting traffic accommodation plans and tracking all signage placed on highways through the entire job.
Installed 3 and 4 party subdivision jobs in Edmonton area I installing power communications and gas
Responsible for employee times and quantities on all jobs
Main lead on AFL fibre installation project falcon in Edmonton was responsible for pre walk through with directional drills ensuring hydrovac holes were acceptable all utilities had been exposed and work was complete in a safe manner.
Was responsible leading a crew installing vaults built to Telus specs and placing home drops at property line, backfilling all site holes and returning lawns to original condition
Was responsible for fibre installation to homes and main line fibre pulls
Installed raceway conduit for streetlight replacement work and installing cable to bases and assisted in streetlight pole installations
Main lead on traffic light conduit installation on James Mowatt trail, setting up traffic accommodations and leading all drilling operations for conduit installation
Installing 3 and 4 party subdivision utilities in Edmonton area was responsible for employee times and material quantity’s and progress reports
First aid level c
CSTS
Whimis
Epcor certification
Ground disturbance level 2 supervisor
Class 5 licence with Q