Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Elgin George

Sarnia

Summary

Dynamic construction professional with Journeyman status, recognized for enhancing project efficiency at LiUNA Local 1089. Proficient in concrete finishing and site preparation, I excel in problem-solving and time management. Committed to safety and quality, I consistently deliver high-quality results while fostering teamwork and communication across diverse project teams.


Construction professional with solid track record in labor-intensive projects. Known for efficient site preparation, material management, and equipment operation, consistently contributing to project timelines. Team-oriented approach and adaptable to changing site demands, ensuring effective collaboration and results.


Overview

23
23
years of professional experience

Work History

Construction Craft Laborer

LiUNA Local 1089
04.2019 - Current
  • Increased productivity through thorough preparation of work areas, including setting up tools and materials required for each task.
  • Adapted to changing project requirements by quickly learning new tasks and techniques as needed for successful completion.
  • Maintained clean and organized work sites, promoting a safe working environment for all team members.
  • Promoted client satisfaction by addressing concerns promptly and maintaining open lines of communication throughout the project lifecycle.
  • Strengthened team morale by actively participating in training sessions, contributing ideas, and providing constructive feedback when necessary.
  • Supported quality control processes with precise measurements and adherence to specifications during project execution.
  • Ensured safety compliance by conducting regular site inspections and adhering to safety regulations.
  • Demonstrated versatility in performing a wide range of labor-intensive tasks across different stages of construction projects.
  • Expedited project timelines by consistently meeting deadlines on assigned tasks while maintaining high-quality results.
  • Reduced project completion time with effective communication between laborers, supervisors, and management.
  • Collaborated with diverse teams in executing complex construction projects, fostering a positive work environment for all involved parties.
  • Mitigated potential delays by proactively identifying issues during job site walkthroughs and immediately addressing them with appropriate solutions.
  • Ensured the accurate documentation of work progress by maintaining detailed daily logs and reporting updates to supervisors.
  • Worked with several different trades to ensure effective communication between tradespeople.
  • Worked with a variety of different contractor companies completing a variety of jobs, including shutdowns at different sites.
  • Finished apprenticeship to reach Journeyman status

Hotel Maintenance

Harbourfront Inn
09.2007 - 09.2009
  • Improved hotel maintenance efficiency by implementing a preventive maintenance program for all equipment and systems.
  • Conducted routine inspections of public spaces within the hotel facility, reporting maintenance issues promptly to minimize disruption.
  • Returned on a full time basis.

Cement Finisher

Sarnia Pools
07.2007 - 09.2007
  • Enhanced skill set through continuous learning about new techniques, tools, or materials relevant to cement finishing.
  • Supported other construction teams by preparing subgrade surfaces for proper drainage before starting any concrete work.
  • Completed projects on time by efficiently spreading, leveling, and smoothing concrete using various tools.
  • Ensured durable and high-quality finishes with the proper application of sealing agents and curing processes.
  • Enhanced client satisfaction by delivering high-quality pool designs tailored to their specific needs.
  • Improved pool construction efficiency by streamlining the building process and implementing best practices.
  • Ensured compliance with building codes, health regulations, and safety standards throughout all stages of the construction process.

Hotel Maintenance

Harbourfront Inn
07.2004 - 04.2006
  • Improved hotel maintenance efficiency by implementing a preventive maintenance program for all systems and equipment.
  • Ensured cleanliness of lobby area and attended to any necessary maintenance tasks, contributing to a well-presented hotel environment.
  • Performed regular pool maintenance tasks such as testing water chemistry levels, ensuring optimal conditions for swimmers.
  • Worked summers while finishing my high school education, switching to full time once graduated.
  • Performed installation, maintenance and upgrades in rooms and other locations on property.
  • Assisted with the organization and execution of special events on hotel property, ensuring guests received exceptional service throughout their stay.

Team Member

Burger King
04.2004 - 06.2004
  • Kept work areas clean, organized, and safe to promote efficiency and team safety.
  • Learned all required tasks quickly to maximize performance.
  • Worked scheduled shifts and remained available to work during coworker absences, holidays, and busy periods.
  • Contributed to team success by completing jobs quickly and accurately.
  • Developed strong customer service and product knowledge skills to enhance individual and team performance.
  • Worked different stations to provide optimal coverage and meet production goals.
  • Operated register to process payments and collect cash payment for order totals.
  • Assisted with inventory counts and stocking of merchandise.

Shop Cleaner

Mac-Weld Machining Ltd
09.2002 - 03.2004
  • Upheld company standards for cleanliness across the store through consistent attention to detail in all tasks performed.
  • Fostered a culture of cleanliness and organization by offering suggestions for improvements and leading by example in daily tasks.
  • Enhanced overall store atmosphere by regularly updating cleaning procedures to align with best practices and industry standards.
  • Enhanced workplace cleanliness by performing thorough daily cleaning tasks and maintaining an organized environment.
  • Promoted efficient waste management by properly disposing of trash and recycling materials according to company guidelines.
  • Maintained inventory of necessary cleaning supplies, informing management when replenishment was required.
  • Handled equipment, chemicals, and materials properly and with caution.
  • Disposed of trash and recyclables each day to avoid waste buildup.

Park Maintenance Worker

St Clair Parkway
07.2002 - 09.2002
  • Participated in training programs to enhance skills, ensuring continuous improvement in job performance.
  • Operated a variety of tools and machinery for tasks like mowing lawns, trimming trees, repairing fences, painting picnic tables, resulting in well-maintained parks'' grounds.
  • Kept grass, trees and landscaping beds in professional condition with regular care.
  • Increased community engagement through participation in events like volunteer clean-ups and educational workshops.
  • Improved park aesthetics with meticulous attention to detail in litter removal and upkeep of benches, signs, and other infrastructure.
  • Ensured timely completion of assigned tasks by adhering to schedule set by supervisors.

Education

No Degree - Mental Health And Addictions

First Nations Technical Institute
Deseronto

Journeyman - Construction Craft Worker

LiUNA 1089
Sarnia, ON
02-2025

Skills

  • Electrical safety
  • Power tool proficiency
  • Heavy equipment operation
  • Hand tool expertise
  • Site preparation
  • Concrete finishing
  • Formwork construction
  • Grade checking
  • OSHA compliance
  • Welding basics
  • Traffic control
  • Hazardous material handling
  • Soil compaction
  • Excavation techniques
  • Demolition procedures
  • Asphalt paving
  • Surveying
  • Problem-solving
  • Time management
  • Attention to detail
  • Multitasking and organization
  • Construction safety

Languages

English
Native or Bilingual

Timeline

Construction Craft Laborer

LiUNA Local 1089
04.2019 - Current

Hotel Maintenance

Harbourfront Inn
09.2007 - 09.2009

Cement Finisher

Sarnia Pools
07.2007 - 09.2007

Hotel Maintenance

Harbourfront Inn
07.2004 - 04.2006

Team Member

Burger King
04.2004 - 06.2004

Shop Cleaner

Mac-Weld Machining Ltd
09.2002 - 03.2004

Park Maintenance Worker

St Clair Parkway
07.2002 - 09.2002

No Degree - Mental Health And Addictions

First Nations Technical Institute

Journeyman - Construction Craft Worker

LiUNA 1089
Elgin George