A QA/QC Engineer with 21 years of construction experience. I have worked on and completed a number of prestigious projects, including residential buildings, commercial structures, and industrial structures. I provide and arrange technical support for the project managers and engineers about the quality procedures and related documents aligned with the project management plan. Ensures that all inspections for all activities are carried out in accordance with the approved ITPs with all the related quality checklists, including but not limited to shop drawings, material approvals, test reports, and maintaining records. Conducts the internal audit with sub-contractors as required. Dealt with NCR and quality observation issuance internally to other contractors.

Overview

22
22
years of professional experience
1
1
Certification

Work History

QC Inspector

Burnco Manufacturing Inc
05.2023 - Current
  • Conduct inspections, verify nesting and cutting list, and complete traceability sheets as per project requirements
  • Inspect and ensure that coating and painting ITP’s activities are adhered and implemented and recorded as required
  • Collect and analyze data and samples in support of quality assurance programs
  • Coordination with third-party representatives and ensuring internal QC check are done for items to be inspected in accordance with the project quality requirement
  • Collect and compile operational or experimental data and assist in the development of estimates, schedules, specifications, and reports
  • Conduct inspection and ensure surface preparation meets the project-required standards
  • Preparation of paint and coating reports as required
  • Check and record monitoring equipment’s condition or status (Flux temperature, environmental condition, etc.) on a daily basis
  • Coordination with other discipline QA/QC representatives for fabrication status and completion
  • Collect, prepare and maintain registers of Tools and Equipment’s calibration certificates
  • Review and prepare a dimension inspection report as per the approved fabrication or shop drawing.

QA/QC ENGINEER

HPS Play Trading LLC
09.2020 - 03.2023
  • Responsible in ensuring that all the project’s quality requirements and standards are adhered with and communicated across the whole team involved
  • Prepare and/or review material submittal documentation and verify compliance with project specifications
  • Prepare and/or review Method Statements, Prepared ITP and the required checklists
  • Coordinate with engineers and consultants regarding quality, procedure and approval system-related issues
  • Conduct Quality Toolbox talks to brief operatives and elevate their awareness on the project’s quality requirements and standards
  • Responsible in ensuring that only approved materials are used in the project
  • Responsible for ensuring that the Method Statement is approved before the activities begin.
  • Responsible in ensuring work is carried out following the latest approved shop drawing
  • Responsible in communicating and following ITP and the required inspections are carried out accordingly
  • Responsible in coordinating with the Installation team for work completion status, doing internal QC checks and raising a Inspection Request (WIR) to the engineer for inspection and approval
  • Responsible in communicating and following ITP and the required inspections are carried out accordingly
  • Responsible for preparing and maintaining registers for materials, method statements, work inspection requests (WIR), calibration registers, and other related quality documents for the project.

LEAD QA/QC ENGINEER

KIER Dubai LLC
12.2018 - 08.2020
  • Establish and ensure that the Project Quality Plan is communicated and implemented across the whole project
  • Review material submittal documentation and verify compliance with project requirements
  • Review Method Statements and verify ITP is available with corresponding checklists
  • Coordinate with engineers and consultants regarding quality, procedure and approval system-related issues
  • Coordinate with the approved third-party testing laboratory of the required testing and sampling for materials delivered on-site like concrete, gravel, pavers, trees, etc.
  • Al
  • Is done religiously as per specification requirements
  • Responsible in raising NCR and SOR whenever a potential Non-conformance is observed to mitigate the number of consultant’s NCR raised
  • Conduct Quality Toolbox talks to staff and operatives prior to commencement of new site activities, record them, and maintain them in a register
  • Responsible for ensuring that Work Inspection requests are submitted on time with all required attachments, i.e
  • Prior approvals, NOCs, approved shop drawings plan, details and location
  • Conduct Internal audit to check the effectiveness of the system placed and adhered to
  • Conduct site inspections to check and verify if the work or activity in progress complies with the latest approved shop drawings, approved materials, approved method statement, and ITP’s Hold/Witness Points.

QA/QC ENGINEER

KIER DUBAI LLC/ CC JV
03.2017 - 12.2018
  • Carrying out inspections on site for civil and structural activities, ensuring the work complies with the approved shop drawing and project specifications
  • Coordinate with the site engineers and project consultants about schedule of inspections ready and the time to be carried out
  • Issuing NCR and QC concerns to the site team and subcontractors for ongoing activities
  • Not as per approved SD, incorrect material, unacceptable workmanship, etc.) and maintain its record
  • Ensuring IRFs (Inspection Request forms) are submitted 24 hours in advance and complying with the approved MS and ITP
  • Conduct Quality Toolbox talks with Site engineers, foremen and operatives to elevate quality and safety awareness for certain activities
  • Help the QAQC Manager prepare and update the PQP
  • Review laboratory test results for cube samples and FDT (in-situ field density test) for compaction prior to submittal to the consultant’s office and maintain the log.

QA/QC ENGINEER

KAS- KIER/AL SHAFAR JV
05.2015 - 02.2017
  • Carrying out structural and architectural inspections and securing the necessary documents complying with the approved shop drawings and ITP
  • Conducts quality surveillance and issues Non-Conformances reports
  • Assist the Quality Manager in updating PMP.

QA/QC ENGINEER

AL FUTTAIM CARILLION
09.2014 - 04.2015
  • Carrying out civil and structural inspections and securing the necessary documents complying with the approved ITP requirements
  • Improved product quality by implementing rigorous QAQC processes and procedures.
  • Conducted thorough inspections for adherence to project specifications, resulting in reduced defects and increased customer satisfaction.
  • Conducts quality surveillance and issues Non-Conformances reports
  • Conducts weekly Toolbox talks to operatives, foremen and site supervisors addressing various Quality issues
  • Prepare weekly and monthly report for NCRs and Inspection requests
  • Assist the QA Manager and Project Director in updating the PMP.

QA/QC ENGINEER

AL FUTTAIM CARILLION
04.2014 - 08.2014
  • Responsible for ensuring that the documents, materials, methodology, etc
  • Being used and followed in every activity on site is approved and complies with the project specifications
  • Responsible for checking and constructing an inspection plan for every activity
  • Carrying out various inspections as per the approved ITP and ensuring all the necessary check sheets and attachments are correct and signed accordingly, storing them and maintaining registers
  • Conducts root cause analysis for NCR’s
  • Conducts site inspection if work complies with approved shop drawings and project specifications.
  • Issuance of QC concerns and NCNs if any non-compliance were found, seeking explanation on why and how the non-compliance occurred and how to prevent its recurrence, and a methodology on how to rectify or correct the unconformity
  • Improving good quality and workmanship by providing technical advice to the Site Engineers, ensuring work is being carried out properly in compliance with the approved shop drawings, material submittals, and method statements.

QA/QC ENGINEER

AL FUTTAIM CARILLION
02.2011 - 03.2014
  • Preparing and carrying out inspections as per the approved ITP, checking all the necessary check sheets and attachments are correct and signed off, storing them and maintaining registers
  • Improving good quality and workmanship by providing technical advice to the Site Engineers, ensuring work is being carried out properly complying with the approved material submittal and method of statements
  • Conducts site inspection if work complies with approved shop drawings and specifications.
  • Issuance of QC concerns and NCNs if any non-compliance were found, seeking explanation on why and how the non-compliance occurred and a step-by-step methodology on how to rectify or correct the unconformity
  • Conducts rebar and formwork inspections for columns, beams, slabs, walls, and other structural elements as per the approved shop drawings, ensuring they comply with the approved specification prior to the client’s representative or consultant's inspection.

QA/QC ENGINEER

AL FUTTAIM CARILLION
02.2009 - 01.2012
  • As QC Engineer (façade) - responsible for conducting pre and post-installation inspection for curtain wall (i.e Bracket torque tests and leak tests for gutters, etc.)
  • Carrying out inspections and securing the necessary documents complying with the approved ITP requirements
  • Checking the materials to see if it comply with the project requirements and specifications
  • Conducts surveillance inspection and issues non-conformance and site deficiency reports to correct and improve quality of work on site
  • As Structural QC Engineer: Rebar inspection for columns, beams, slabs, walls and other structural elements prior to the consultant's or client's representative
  • Giving technical advice to the Site Engineer Improving the quality of workmanship and it complies with the approved shop drawings
  • Conducts site inspection to check work complies with approved shop drawings and specifications prior to consultants’ inspection
  • Issuance of QA/QC concerns and NCNs to sub-contractors if any non-compliance were found
  • As Temporary Works Supervisor, to check and give clearance or certificate for temporary works (i.e
  • Slab decking system, scaffolding, loading platforms, formwork for beams, etc.) prior to concrete pouring or its use.

QA/QC ENGINEER

AL FUTTAIM CARILLION
05.2007 - 02.2009
  • As Architectural QC Engineer, I Conducts site inspection to make sure work complies with approved shop drawings and specifications prior to consultants’ inspection
  • Make snagging report to be rectified prior to handing over of the project
  • Issuance of QA/QC concerns or NCNs if any non-compliance were found
  • Carrying out all inspections as per the approved ITP and securing and producing the necessary check sheets, storing them, and maintaining registers.

CAD ENGINEER

HAYAT COMMUNICATIONS
02.2006 - 04.2007
  • As CAD Engineer and Site Supervisor, I prepare and design of construction drawings to be used on site
  • Site survey and ocular visit for construction of shelter and monopoles for GSM sites
  • Gathering data and reflecting them on the drawing or design
  • Supervision for the construction of an ongoing project in accordance with the approved plan and specification.

DRAUGHTSMAN

AL FOUZAN TRADING & GENERAL CONSTRUCTION CO.
09.2003 - 12.2005
  • Preparation and design of shop drawings to be submitted for approval
  • Coordination of civil and architectural disciplines with other fields concerning construction
  • Rebar and reinforcement detailing
  • Updating and revising of plans as per comments, conducting an ocular inspection on job site and reflecting the changes to the plans as per site condition
  • Preparation of material quantities (estimator).

PROJECT ENGINEER/INSPECTOR

SEAOIL PHILIPPINES INC.
11.2001 - 08.2003
  • Responsible for the procurement and preparation of plans and pertinent documents like Clearances, Mayor’s Permit, Building permits, etc
  • Estimate and prepare a bill of quantities for a given project for civil and architectural
  • Scheduling and program of works from clearing and mobilization to demobilization and project commissioning
  • Responsible for monitoring accomplishments and reporting changes on the project, aided by graphs and bar charts
  • Responsible for making requisitions of equipment and materials to be used.
  • As Control Engineer, I check that the materials to be used are of good quality and as per the specifications
  • Witnessing of the UGT/Underground Tank hydro testing for leak to ensure its handling condition safeness and long span of use
  • Preparation of contractors’ and subcontractor’s billing, payment and communication letters
  • Preparation of sketches for as-built plans and "change orders" using AutoCAD.

Education

Bachelor of Science - BS Civil Engineering

Nueva Ecija University of Science And Technology
Cabanatuan City, Philippines
03.1998

High School Diploma -

General De Jesus Academy
San Isidro Nueva Ecija
03.1992

Skills

  • Critical thinking
  • Computer skills: Autocad, MS Office,
  • Hard-working/Team player
  • Sampling Procedures
  • Sampling Techniques
  • Visual Examinations

Languages

English
Full Professional
Filipino
Native or Bilingual
Arabic
Limited Working

Certification

· Management Safety Training

Dubai UAE, November 21, 2019


· Internal Auditor in Quality Management System ISO 9001:2015

Dubai UAE, July 28, 2016


· Internal Auditor in Occupational Health and Safety Management System (BS OHSAS 18001:2007

Dubai UAE, August 4, 2016


· Internal Auditor in Environmental Management System ISO 14001:2015

Dubai UAE August 11, 2016


· ECITB SMTD/IOSH Managing Safely Training

Abu Dhabi UAE, on August 14–15, 22–23, 2011


· Quality Tools Training

Dubai UAE, November 17, 2007


· Quality Management System ISO17025:2005

Dubai UAE, November 10, 2007


· Quality Management System ISO9001:2000

Dubai UAE, October 20, 2007

Timeline

QC Inspector

Burnco Manufacturing Inc
05.2023 - Current

QA/QC ENGINEER

HPS Play Trading LLC
09.2020 - 03.2023

LEAD QA/QC ENGINEER

KIER Dubai LLC
12.2018 - 08.2020

QA/QC ENGINEER

KIER DUBAI LLC/ CC JV
03.2017 - 12.2018

QA/QC ENGINEER

KAS- KIER/AL SHAFAR JV
05.2015 - 02.2017

QA/QC ENGINEER

AL FUTTAIM CARILLION
09.2014 - 04.2015

QA/QC ENGINEER

AL FUTTAIM CARILLION
04.2014 - 08.2014

QA/QC ENGINEER

AL FUTTAIM CARILLION
02.2011 - 03.2014

QA/QC ENGINEER

AL FUTTAIM CARILLION
02.2009 - 01.2012

QA/QC ENGINEER

AL FUTTAIM CARILLION
05.2007 - 02.2009

CAD ENGINEER

HAYAT COMMUNICATIONS
02.2006 - 04.2007

DRAUGHTSMAN

AL FOUZAN TRADING & GENERAL CONSTRUCTION CO.
09.2003 - 12.2005

PROJECT ENGINEER/INSPECTOR

SEAOIL PHILIPPINES INC.
11.2001 - 08.2003

Bachelor of Science - BS Civil Engineering

Nueva Ecija University of Science And Technology

High School Diploma -

General De Jesus Academy
Eijjilito Bohayo