Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Donn Wesson

Hesperia

Summary

Strategic Project Manager specializing in scheduling, risk assessment, and safety compliance. Expertise in coordinating resources and schedules for electrical projects enhances team collaboration and minimizes delays. Proven leadership in managing project timelines and fostering effective communication among stakeholders ensures successful project delivery.

Overview

22
22
years of professional experience
1
1
Certification

Work History

Prodject Manager

Steven Seidel Electric
Rancho Cucamonga
01.2023 - Current
  • Coordinated resources and schedules for multiple electrical projects.
  • Monitored project timelines, identifying and addressing potential delays.
  • Implemented safety protocols to ensure compliance with industry standards.
  • Facilitated team meetings to review progress and resolve challenges collaboratively.
  • Documented project milestones and maintained accurate records.
  • Developed and maintained project plans, timelines, and budgets.
  • Provided guidance to team members regarding tasks assigned to them.
  • Conducted periodic inspections of job sites for quality and progress.
  • Prepared cost estimates for projects of varying sizes.
  • Identified project risks and developed strategies for effective mitigation.
  • Ensured compliance with applicable laws, regulations, policies and procedures throughout the life cycle of each project.
  • Created team objectives and roles with specific goals outlined for each individual.
  • Participated in professional development opportunities to stay current with industry trends and technologies.

Precision Millwright

Nor-Cal Millwrights Local 102
Livermore
02.2004 - 08.2025
  • Installed and maintained industrial machinery for optimal performance and safety.
  • Conducted regular inspections to identify mechanical issues, implementing timely repairs to maintain optimal equipment functionality.
  • Collaborated with teams to execute complex machinery installations and upgrades.
  • Ensured compliance with safety regulations during all maintenance activities.
  • Trained apprentices on proper millwright techniques and equipment use, fostering skill development and enhancing team capability.
  • Diagnosed mechanical failures and performed troubleshooting to minimize downtime.
  • Operated precision milling machines to produce high-quality parts within specified tolerances.
  • Installed electrical wiring systems for new machinery installations according to safety regulations.
  • Adjusted, aligned, and calibrated machine components, ensuring precise operation and reducing potential downtime.
  • Calibrated measuring instruments such as micrometers and calipers used in the machining process.
  • Maintained safe and operational equipment by inspecting machinery and conducting routine preventive maintenance.
  • Assembled mechanical components such as bearings, shafts, spindles, and gears.
  • Installed new milling machinery according to manufacturer's instructions.
  • Completed routine preventive maintenance on heavy equipment, minimizing machinery downtime.
  • Read diagrams and schematic drawings to determine work procedures.
  • Signaled crane operator to lower basic assembly units to bedplate and aligned unit to centerline.
  • Moved heavy machinery and equipment using hoists, dollies, rollers, and trucks.
  • Installed stationary industrial machinery and mechanical equipment following layout plans.
  • Used rigging, hoists and equipment to move heavy machinery between locations and complete installations.
  • Observed required safety measures when using blowtorches, wrenches and forklifts to maintain high standards.
  • Read blueprints and sketches to fabricate equipment, make modifications, and establish work procedures.
  • Inspected operating safety devices for proper functionality after repairs, installations, modifications and installations.
  • Installed machines in industrial and construction settings and tested to confirm proper working condition.
  • Inspected and completed troubleshooting to repair machinery.

Education

High School Diploma -

Narbonne High School
Harbor City, CA
01-1976

Skills

  • Project management
  • Project scope
  • Project estimation
  • Scheduling
  • Planning and scheduling
  • Project tracking
  • Risk management
  • Risk assessment
  • Safety protocols
  • Progress reporting
  • Task prioritization
  • Problem solving

Certification

  • C-10 Electrical California State License Board 2000

Timeline

Prodject Manager

Steven Seidel Electric
01.2023 - Current

Precision Millwright

Nor-Cal Millwrights Local 102
02.2004 - 08.2025

High School Diploma -

Narbonne High School
Donn Wesson