Summary
Overview
Work History
Education
Skills
Languages
Certification
Timeline
Generic

David Power

Toronto,Canada

Summary

Been in the tool die for 30 years looking to teach and share my skills with others and to advance my self I have done everything from build to design to production in tooling transfer progressive staging tooling.

Overview

23
23
years of professional experience
1
1
Certification

Work History

Plant Manager

Therma Die
01.2023 - Current
  • Launching of new tools
  • Oversee all employees and ensure safety
  • Manage all production
  • Work closely with customers to ensure part quality and delivery on time
  • Provide guidance to tool makers and production
  • Manage through put of tools and stampings
  • Use Cad software
  • Implement cost saving measurements
  • Improve efficiency in production and tool builds
  • Create and manage budgets
  • Develop and drive continuous improvements
  • Monitor all operations and processes
  • Lead production meetings
  • Employee evaluations
  • Sign off on spending
  • Help when needed on the floor
  • Manage KPI and reports.

Toolroom manager

Kobay Enstel Limited
01.2020 - 01.2023
  • Launching of new tools
  • Responsible for ordering and maintaining spear
  • Took all parts that were on GP12 off by fixing tooling
  • Work close with Quality on part specs
  • Provide guidance to tool makers and manage toolmakers
  • Manage through put of toolroom
  • Use Cad software
  • Kpi
  • Set up a better PM tracker
  • Oversee and priority of cnc and wire edm
  • Reduced down time in the press shop
  • Supported all Continuous improvement initiatives
  • Time lines on tooling changes and upgrades and new tooling
  • Worked with Microsoft programs
  • 6 Sigma.

Tooling Shop Supervisor

Armac Tooling
01.2019 - 01.2020
  • Responsible for the Launch of tools for production, build of new tooling, and throughput analysis
  • Extensive work with CAD software
  • Provide guidance and support to toolmakers and apprentices
  • Oversee concepts of tooling
  • Work with GD&T
  • Die development and processes maintenance to machinery
  • Quoting of tooling and tool reviews
  • Die development, In press and out on floor
  • Launching of all new tooling
  • Program management of new projects
  • Design analysis of new product
  • Oversee and manage toolmakers.

Shop Supervisor/Set up for production/Tooling

Beta Tech
01.2017 - 01.2018
  • Oversee launch of tools for production and the launch of take over tooling for production
  • Set up presses, manage tooling for production
  • Ensure 5’s are maintained within facility
  • Oversee PPAP runs, tooling quoting, strip layouts, tooling concepts
  • Point of contact for Vendors to improve quality and tooling
  • Hands-on work with SolidWorks CAD, Fast blank
  • Responsible for Engineering changes to tooling, die design reviews, setting up transfer tools and arms
  • Assisted with die quoting of new tool, and quoting of welding parts for production
  • Worked with delay pressure pads and hydraulics
  • Over saw production workers
  • Attendance of production meetings to make sure daily activities were met
  • Over saw toolmakers and apprentices
  • Die development
  • Press maintenance
  • Set up of press shop for production
  • Quick die change set up and se sensors for tooling
  • Worked with presses 250 tons to 2000 tons worked with quality to improve part quality
  • Ordering of spears for tooling
  • Worked with complex stampings.

Tooling Engineer/Program Manager/Manage Toolroom

MULTIMATIC MEXICO
01.2013 - 01.2017
  • Responsible for all new tooling and project’s
  • Successfully launched MQB for Volkswagen, launch of Calsonic program Nissan, launch of tools for Audi, GM, Nissan, Volkswagen
  • Supported Tech reviews at Volkswagen for new jobs, Tech reviews at Audi Germany, Tech reviews with GM, and Nissan
  • Perform Simulations in Auto form for new work from Volkswagen, and Auto form Simulations for Audi Mexico and Germany and blue
  • Travel to Audi Germany and Volkswagen Germany to present concepts and simulations
  • Program managed several programs
  • Handled Strip layouts and concepts for tooling using VISI and Fast blank
  • Die concept and die layout what parts can run in progressive or transfer
  • Perform PPAP, Oversaw Time lines on new tooling and changes and upgrades
  • Responsible for quotation of tools and fixtures and steel in addition to Die cost and fixture costs as well as piece price quoting
  • Handled Quoting of weld cells for IP, suspension, tooling for roll form line, quoting stamping, welded assemblies and new machinery and presses
  • Extensive Travel to tooling shops to review tooling
  • Oversee Continuous improvement initiatives, determine how to improve quality and tools and speed
  • Work closely with die shops to ensure quality tooling and on time delivery
  • Supported the training of toolmakers and apprentices, manage toolmakers for new tooling and engineering changes
  • Ran the lead on Mexican toolmaker to do training in Canada
  • Worked with presses and dies from 250 ton to 2000 ton
  • Part of reverse engineering of parts
  • Helped at Volkswagen Mexico with welding of rear axle to get welds to spec
  • Quoting of roll form tooling
  • Set up for toolmakers and apprentices to train in Canada at tool shops
  • Managed toolmaker and apprentices and
  • Part development of new products worked with technical center.

Tooling Engineer

Narmx Narmco
01.2012 - 01.2013
  • Responsible for overseeing all new tooling and decreasing downtime
  • Oversaw and responsible for Strip layouts and concepts, Die quoting and fixture pricing
  • Extensive work with progressive transfer and tandem presses
  • Design of weld fixtures, and poky yokes
  • Perform Simulations in Auto form for new work from Volkswagen
  • Perform PPAP
  • Timelines on tooling changes and upgrades and new tooling
  • Ensure press problems are resolved in a timely manner, oversee engineering changes to dies and order and maintain spears
  • Handled Tech reviews at Volkswagen for new jobs
  • Worked with roll form tooling, tub bending equipment
  • Supported all Continuous improvement initiatives
  • Worked with quality to improve part quality
  • Over saw toolmakers and apprentices
  • Worked with Microsoft programs
  • Travel to tool shops to ensure quality of tooling and parts.

Tool Room Manager

MULTIMATIC MEXICO
01.2011 - 01.2012
  • Handled new die builds for Tier 1 Automotive stamping including, dies for Mexico, Chrysler, Ford, GM,Volkswagen,Nissan
  • Lead the CNC department, apprentices, as well as other tool makers
  • Involved with all production meetings, worked closely with scheduling to assure product ran and fixed and prioritize tooling
  • Prioritized tooling and toolmakers daily
  • Oversaw the ordering of new toolroom equipment, and ensure the speed of the presses and dies were on target
  • Responsible for Strip layouts, finalizing die designs, setup of transfer arms for new transfer tools
  • And maintained timelines on tooling changes and up grades
  • Took care of 200 tools and over saw all maintenance
  • Managed the quotation of tool changes
  • Ordering and maintaining consumables and spears
  • Maintain Continuous improvement initiative, extensive work with GD&T and PPAP
  • Handled employee evaluation and concerns
  • Managed 25 toolmaker and 5 apprentices
  • Final buy off of tooling
  • Quoting of engineering changes and spears
  • Over saw production in the press shop with 30 plus employees
  • Used Visi and Solid works and Master cam
  • Develop a min max for consumables and tooling
  • Worked with Microsoft xl and related software
  • Reduced down time in the press shop
  • Worked with d stacker
  • Took dies that couldn’t run to running and got note 1 for Volkswagen.

Tool and Die Tool Shop Leader/ Die Support

Die Tech Inc.
01.2007 - 01.2011
  • Lead the CNC department, apprentices, as well as other tool makers
  • Responsible for the build new dies for stamping, perform engineering changes on dies
  • Over saw the build of multiple tools, oversaw engineering changes to tooling
  • Travelled to Mexico to provide detailed die support, ensure accurate build of complex parts
  • Worked with presses 400 ton to 2000 ton, perform a lot of press try outs on new tooling and old tooling
  • Regular work with building Transfer arms.

Tool and Die Team Leader

Edgar Tool and Die
01.2005 - 01.2007

Tool and Die Maker Team Leader

Die Tech Inc.
01.2001 - 01.2005

Education

Tool and Die Certificate -

Conestoga College
Guelph, ON

Machine and Tool Setter -

Conestoga College
Kitchener, ON

Management Coaching
Queretaro, Mexico

Skills

  • Plant and warehouse operations
  • Project Management
  • Operations Management
  • Production Planning

Languages

English
Native or Bilingual

Certification

Tool maker trade certificate

Timeline

Plant Manager

Therma Die
01.2023 - Current

Toolroom manager

Kobay Enstel Limited
01.2020 - 01.2023

Tooling Shop Supervisor

Armac Tooling
01.2019 - 01.2020

Shop Supervisor/Set up for production/Tooling

Beta Tech
01.2017 - 01.2018

Tooling Engineer/Program Manager/Manage Toolroom

MULTIMATIC MEXICO
01.2013 - 01.2017

Tooling Engineer

Narmx Narmco
01.2012 - 01.2013

Tool Room Manager

MULTIMATIC MEXICO
01.2011 - 01.2012

Tool and Die Tool Shop Leader/ Die Support

Die Tech Inc.
01.2007 - 01.2011

Tool and Die Team Leader

Edgar Tool and Die
01.2005 - 01.2007

Tool and Die Maker Team Leader

Die Tech Inc.
01.2001 - 01.2005

Tool and Die Certificate -

Conestoga College

Machine and Tool Setter -

Conestoga College

Management Coaching
David Power