Seasoned Structural Site Superintendent with a proven track record at Mizrahi Developments / SKYGRID Construction, adept in project management and team leadership. Excelled in ensuring project adherence to schedules with a keen focus on safety compliance and subcontractor coordination. Demonstrated excellence in problem-solving and construction oversight, significantly enhancing project efficiency and stakeholder communication.
100 units – 4 storey stacked townhouses with 1 level underground parking garage
• Total Budget 0f 25 million
• Project management duties included but not limited to permits, contracts, scopes of work, occupancy packages, complete construction schedules, construction budget, fire rating schedule, 4 storey design build for the added sprinkler system, design build for the fire proofing assembly etc.
• Supervised all construction – rough carpentry, brick / stucco facade, exterior hardscape, interior finishing, waterproofing, PDI / closing schedules, occupancy inspections, etc
PIER 27 WATERFRONT COMMUNITY - 450 Units - Two 15 story buildings
• High end finishes
• $450 million project budget
• Supervise all aspects of the construction process
• Manage the structural, mechanical, and electrical engineers due to the very high degree of difficulty of the construction design
• Liaise with project Architect on a daily basis
• Adapt to ongoing changes - Window supplier and installer contract was changed midway through the construction process David P. Paris Structure Superintendent ORGANIZATION CHART 19
• Many structural issues within the 12 story building. Concrete beams and steel cross members which are taking the load of the cantilevered “bridge” extension
• Custom Unit changes – Purchasers making large changes to their units after construction
• Electrical customizations, including surround sound, electric shutters, gas fireplaces, Mechanical customizations including vertical heat pumps in exchange for horizontal