For approximately 9 years, I have worked as a Senior Technician and Field Technician. I have worked across a diverse range of projects for city, county, and state agencies, including (1) the Water District Projects in which I was involved in various water infrastructure improvements and maintenance, (2) City and County Street Rehabilitation where I worked on the repair and upgrade of street infrastructure, including paving and surface restoration, (3) School District Projects in which i was engaged in construction and renovation projects for educational facilities, and (4) Renewable Transmission Projects in which I participated in projects related to enhancing transmission infrastructure to support renewable energy. I had many responsibilities. As a Senior Technician, I oversaw technical aspects of projects, ensuring adherence to engineering specifications and standards. I identified and documented discrepancies, providing recommendations for corrective actions. As a Field technician, I performed on-site technical tasks including soil testing, material sampling, and equipment calibration, as well as, assisting with daily site operations and provided technical support to project teams. I had many key contributions. For example, I maintained quality assurance by ensuring the quality and safety of construction work through rigorous inspections and testing. As far as documentation, I created detailed reported and maintained accurate records of inspections, testing, and project progress. For collaboration, I worked closely with engineers, contractors, and project managers to ensure successful project outcomes. My broad experience and varied roles demonstrate a strong capability in managing and executing technical and inspection tasks across multiple types of infrastructure projects.

Overview

9
9
years of professional experience

Work History

Senior Technician and Field Technician

Ninyo and Moore
02.2011 - 03.2013
  • Tehachapi Renewable Transmission Project (TRTP) Duration: 2 years Budget: $130 million
  • Project Overview: The TRTP was a two-phase project designed to improve the transmission infrastructure for renewable energy. This involved extensive work on transmission towers and associated structures to support the delivery of renewable energy from Tehachapi to various locations.
  • Responsibilities: Phase 1: Concrete Testing Scope: Testing of concrete used in anchoring the transmission tower legs, which were embedded 25-40 feet into the earth. Tests Conducted: Slump Test: Assessed the workability of the concrete. Temperature Check: Monitored the temperature of the concrete mix. Air Entrainment Test: Measured the air content in the concrete to ensure quality. Air Entrainment Test: Measured the air content in the concrete to ensure quality. Compressive Strength Tests: Conducted on concrete cylinders to determine the strength of the concrete once cured.
  • Phase 2: Excavation and Grading Role: Responsibilities: Conducted inspections for excavation and grading activities. Performed daily documentation and reporting on progress and discrepancies. Communicated detailed reports to the customer regarding the project's status.
  • - Inspection Locations: Covered a broad area from Palmdale, CA to Blythe, CA.

Senior Technician and Field Technician

Converse Consultants
07.2004 - 01.2011
  • For approximately 9 years, I have worked as a Senior Technician and Field Technician. I have worked across a diverse range of projects for city, county, and state agencies, including (1) the Water District Projects in which I was involved in various water infrastructure improvements and maintenance, (2) City and County Street Rehabilitation where I worked on the repair and upgrade of street infrastructure, including paving and surface restoration, (3) School District Projects in which I was engaged in construction and renovation projects for educational facilities, and (4) Renewable Transmission Projects in which I participated in projects related to enhancing transmission infrastructure to support renewable energy.
  • As a Senior Technician I oversaw technical aspects of projects, ensuring adherence to engineering specifications and standards. I also provided expertise in complex technical issues and solutions. As an Inspector I conducted inspections to verify compliance with project specifications, safety regulations, and quality standards. I identified and documented discrepancies, providing recommendations for corrective actions. As a Field Technician I performed on-site technical tasks and inspections, including soil testing, material sampling, and equipment calibration as well as assisting with daily site operations and provided technical support to project teams.
  • Responsibilities: Grading: Oversaw and ensured proper grading for new developments to prepare sites for construction. Excavations: Managed and inspected excavation work, ensuring compliance with design specifications and safety standards. Underground Utilities: Supervised the installation and inspection of underground utilities, such as weather, sewer, and electrical systems. Curb and Gutter: Ensured the construction and quality of curbs and gutters were up to code. New road Construction: Oversaw the development and construction of new roads within residential projects.
  • Compliance and Reporting: Safety Compliance: Ensured that all work met safety regulations and industry standards. Daily Reports: Created and submitted detailed daily reports documenting progress, issues, and any discrepancies. Photograph Documentation: Captured and reported daily photos of project sites to provide visual documentation of progress and conditions.
  • Clients: Lennar, KB Homes, Pulte Homes, Meritage Homes
  • Project Scope: During this period, I was involved in numerous new home construction projects throughout Southern California, encompassing thousands of homes.

Senior Technician and Field Technician

Converse Consultants
07.2004 - 01.2011
  • Project Scope: During this period, I had a role in overseeing a complex project at the sewer plant. I was responsible for a range of tasks, from observing the rehabilitation of key components like aeration basins, grit chambers, and clarifiers, to observing the construction of underground utilities. I was involved in ensuring the safety through trenching and shoring, testing concrete placement and new asphalt, and maintaining constant communication with the Eastern Municipal Water District (EMWD) representatives.
  • I attended weekly progress meetings and assisted with scheduling special inspections that were key to keeping the project on track and addressing any issues that arose. I displayed a strong mix of technical knowledge, project management skills, and effective communication to ensure the successful expansion and upgrade of the sewer plant.

Senior Technician and Field Technician

SBCUSD
07.2004 - 01.2011
  • Project Oversight: Observed the construction of 12 new special day classes across 12 different schools, from groundbreaking through to the opening of each class.
  • Construction Monitoring: Conducted detailed observations and testing on-site - including excavation, grading, ground utilities, and concrete. Concrete Testing: Performed tests such as air entrainment, slump tests and cylinder casting to ensure quality and adherence to specification.
  • Reporting and Communication: Generated and submitted daily reports to the customer, providing updates on progress and any issues encountered.
  • Coordination and Scheduling: Attended weekly progress meetings and played a key role in scheduling special inspections to ensure timely and efficient project execution.
  • Documentation: Assisted in compiling and maintaining thorough documentation of all construction activities and inspections for compliance and quality assurance.

Skills

  • Soils Tech - 9 years
  • ACI - 8 years

Timeline

Senior Technician and Field Technician

Ninyo and Moore
02.2011 - 03.2013

Senior Technician and Field Technician

Converse Consultants
07.2004 - 01.2011

Senior Technician and Field Technician

Converse Consultants
07.2004 - 01.2011

Senior Technician and Field Technician

SBCUSD
07.2004 - 01.2011
Daniel Dismang