Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Daniel Casallas Espindola

Stoney Creek,ON

Summary

Dynamic Construction Site Superintendent with extensive experience at Ritestart LTD, excelling in pre-construction planning and project closeout. Proven track record of managing multi-million dollar ICI projects, ensuring on-time completion and client satisfaction. Skilled in construction scheduling and site safety management, fostering effective labor management and collaboration across teams.

Overview

6
6
years of professional experience

Work History

Construction Site Superintendent

Ritestart LTD
09.2023 - 11.2025

At Ritestart Limited I was responsible for managing, coordinating and planning from beginning of ICI Construction projects to substantial completion. Examples of these projects can be found listed below. I was responsible for scheduling trades, attending meetings with the client keeping all project managers and coordinators up-to-date making sure the project was following exact specifications and details on the as-built drawings. I was also responsible for dealing with the client and all their concerns and needs regarding the completion of the project and dealing with fixing deficiencies for the project to reach substantial completion. I was responsible and completed multiple seven figure projects. All on time and to complete satisfaction of the client I am familiar with reading architectural drawings, as well as mechanical, structural, and electrical drawings. I was also responsible for filling daily logs on Procore and kept all my documentation every day of every project updated daily. I also have heavy experience and mechanical renovations, as well as have done and completed successfully 4 crane lifts with AMERHEARST maintaining safety on my sites as top priority.


List of jobs I have substantially completed

-Owen Sound courthouse - Mechanical Upgrades: Project value: 4m

-Solel Synagogue Mechanical Upgrades and Renovations: Project value: 350k

-West-burn AHU Replacement: Project Value: 780k

-Western University; Belmont Cafe Renovation: Project Value 540k

-OCAD AHU Replacement and water heater renovation: Project Value: 890k

Jr. Estimator

GS Wark
01.2023 - 08.2023

At my time at GS Wark. I became familiar with all software in the office, including Microsoft office Microsoft Excel as well as I became familiar and very proficient in autoCAD aswell as reading IFC and architectural plans to put together a scope of work for each trade and estimating costs of each trade to put together a competitive bid

  • Assisted in preparing accurate cost estimates for projects, ensuring alignment with client specifications.
  • Collaborated with project managers to analyze bid proposals and assess feasibility of construction projects.
  • Utilized estimating software to create detailed material take-offs and labor calculations.
  • Conducted site visits to gather data needed for precise estimate preparation and validation.
  • Supported senior estimators by compiling historical data to enhance future bidding accuracy.
  • Maintained organized documentation of all bids and project correspondence for future reference.
  • Contributed to continuous process improvements by providing feedback on estimating procedures and tools used.

Taper/Framer/Boardman

Velorez Renovations
01.2020 - 01.2023

At Velorez Renovations, I was a taper framer and Boardman for three years. At this company, I learned and gained experience in residential renovations. this helped me visualize in person how construction is really done as well as learn a skilled trade. another important factor that I also learned is how to work safe with all PPE.

  • Prepared surfaces for painting by applying joint compound and ensuring smooth finish.
  • Operated hand tools and power equipment to efficiently complete taping tasks.
  • Collaborated with team members to maintain safe and organized work environment.
  • Inspected finished work for quality, ensuring adherence to project specifications.
  • Assisted in training new staff on proper tape application techniques and safety practices.
  • Developed efficient workflows to improve overall productivity during renovation projects.
  • Conducted material inventory checks to ensure adequate supplies for ongoing jobs.
  • Implemented best practices for waste reduction, contributing to cost-effective operations.

Education

Advanced College Diploma - Architectural Design, And Technology.

Mohawk College of Applied Arts And Technology
Hamilton, Ontario
01.2025

Skills

  • Pre-construction planning
  • Crane lift experience
  • Construction scheduling
  • ICI Construction Management
  • Project closeout
  • Labor management
  • Site safety management
  • Design-build experience
  • Construction software proficiency

Languages

English
Native or Bilingual
Spanish
Native or Bilingual

Timeline

Construction Site Superintendent

Ritestart LTD
09.2023 - 11.2025

Jr. Estimator

GS Wark
01.2023 - 08.2023

Taper/Framer/Boardman

Velorez Renovations
01.2020 - 01.2023

Advanced College Diploma - Architectural Design, And Technology.

Mohawk College of Applied Arts And Technology
Daniel Casallas Espindola