a. PG&E Substation and Transmission Programs, Multiple Cities, Northern CA, Specific Role: Materials Tester/Field Technician, Brief Description: Kleinfelder has delivered materials testing and inspection programs for PG&E as part of their ongoing capital development program including roadway improvements, hydroelectric facilities, substation improvements and transmission line improvements. These services have included rush dispatch and project delivery in many cases due to sensitive site locations or regulatory requirements. Mr. Lowe has been performing sample pickup at various project sites and may begin performing testing in accordance with Caltrans Test Methods for various PG&E projects under Caltrans’ jurisdiction this month., Project Cost: $6.1 million, Dates of Service: 04/2024 – Ongoing,
b. Madera County, Avenue 25 Bridge Replacement, Modesto, CA, Specific Role: Materials Tester/Field Technician, Brief Description: Kleinfelder provided materials testing services pertaining to the Avenue 25 Bridge Replacement at the Chowchilla River Project. Mr. Lowe performed sample pickup for this project., Project Cost: $120K, Dates of Service: 10/2023 – 11/2024,
c. San Joaquin River Restoration Program (SJRRP), Mendota Pool Bypass and Reach 2B Improvements Project, Mendota, Fresno County, CA, Specific Role: Materials Tester/Field Technician, Brief Description: Kleinfelder is performing investigations required by SJRRP to support the design of the Mendota Pool Bypass and Reach 2B Improvements Project. Mr. Lowe performed sample pickup and soil testing for this project., Project Cost: Approximately $2.6M, Dates of Service: 06/2023 – Ongoing,
d. Construction Materials and Laboratory Testing Services (Caltrans/ASTM Test Methods), Various Projects, Multiple Cities, Northern CA, Specific Role: Materials Tester/Technician/Inspector, Brief Description: Mr. Lowe performs laboratory testing and inspection in accordance with Caltrans Test Methods for various projects under Caltrans’ jurisdiction. He typically performs asphalt, soils, and concrete testing., Project Cost: Various, Dates of Service: 06/2023 – Ongoing,