Summary
Overview
Work History
Skills
References
Work Availability
Languages
Timeline

COREY MATHIEU

Summary

Construction Foreman with over 20 years of extensive experience in water, sewer, and heavy civil projects. Expertise in managing site operations and directing teams to ensure timely project completion while adhering to safety standards. Proven track record of effective problem-solving and optimizing workflow, resulting in increased efficiency and reduced costs. Committed to leveraging industry knowledge to drive successful project outcomes.

Overview

20
20
years of professional experience

Work History

Civil Heavy Foreman

Green Infrastructure Partners
Ottawa, Ontario
05.2024 - Current
  • Supervised activities of personnel assigned to various tasks during construction jobs.
  • Delegated duties to employees based on skillset.
  • Tracked and reported units and labor hours prior to submission of timecards.
  • Inspected construction sites regularly for compliance with safety regulations and quality standards.
  • Reviewed blueprints, drawings and specifications for accuracy prior to commencing work.
  • Checked project details to verify job site materials and equipment.

General Foreman

AtkinsRéalis Group Inc.
Ottawa, Ontario
04.2022 - 05.2024
  • Oversaw project execution, maintaining strict compliance with timelines and standards.
  • Prepared and planned worksites to help jobs run smoothly.
  • Managed sites by focusing on safety, operations and productivity.
  • Maintained consistency of grades according to drawing specifications.
  • Executed precision measurement processes with Top Con GPS.
  • Managed heavy equipment operations under demanding conditions.

Superintendent

Sullivans Construction
Ottawa, Ontario
10.2020 - 04.2022
  • Directed activities to guarantee proper completion with adherence to safety protocols and deadlines.
  • Recognized and enforced quality standards through daily inspection of construction sites.
  • Inspected construction sites regularly to detect potential safety hazards and ensure compliance with safety protocols.
  • Executed tasks according to planned drawings.
  • Utilized GPS, laser level and eye level for accurate installation of pipes and structures.
  • Operated heavy machinery when required.

Foreman

CoCo Paving
04.2019 - 10.2020
  • Managed operations in the water and sewer division.
  • Delegated duties to employees based on skillset.
  • Contracted to Metric Construction Company as a grades man.
  • Reviewed drawing grades to ensure accuracy.
  • Installed various pipes and structures on site.
  • Using a GPS, laser level, and eye level.

Foreman

Taggart Construction
Ottawa, Ontario
03.2018 - 03.2019
  • I was a foreman in the water and sewer division.
  • Planned and executed strategies to complete tasks efficiently.
  • Maintained consistency by following set grade plans.
  • Completed installation of piping and structures.
  • Executed measurement tasks leveraging rotating laser combined with eye level.
  • Conducted tasks involving the use of large equipment.

Foreman

CoCo Paving
Ottawa, Ontario
01.2016 - 03.2018
  • Managed operations in the water and sewer division.
  • Delegated duties to employees based on skillset.
  • Contracted to Metric Construction Company as a grades man.
  • Reviewed drawing grades to ensure accuracy.
  • Installed various pipes and structures on site.
  • Using a GPS, laser level, and eye level.

Foreman and Operator

Eastway Construction
Pembroke, Ontario
06.2010 - 12.2016
  • Supervised water and sewer projects.
  • Operated heavy equipment efficiently and safely.
  • Managed sites by focusing on safety, operations and productivity.
  • Assessed work area conditions for potential hazards or risks.
  • Executed tasks precisely as specified by the drawings.
  • Maintained the accuracy of assigned grade levels.

Pipe Layer

Clouthier Construction
Pembroke, Ontario
04.2005 - 06.2010
  • Installed piping systems and structures based on the supervisor's instructions.
  • Located underground utilities in preparation for digging and marked locations to prevent damage.
  • Measured distances between points to determine the length of pipe needed for a job.
  • Laid out and marked underground pipe routes to ensure accuracy of installation.
  • Used measuring instruments like levels, transits and laser devices for accurate positioning of pipes.
  • Learned and mastered skills in various grading methods.

Skills

  • Project Management
  • Regulatory Safety Compliance
  • Blueprint Analysis
  • GPS Systems Expertise
  • Experienced in Heavy Machinery Operation
  • Quality Assessment
  • On-Site Assessment
  • Construction Procedures
  • Strong Verbal Skills
  • Operational Leadership

References

Available upon request

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Languages

English
Native language

Timeline

Civil Heavy Foreman - Green Infrastructure Partners
05.2024 - Current
General Foreman - AtkinsRéalis Group Inc.
04.2022 - 05.2024
Superintendent - Sullivans Construction
10.2020 - 04.2022
Foreman - CoCo Paving
04.2019 - 10.2020
Foreman - Taggart Construction
03.2018 - 03.2019
Foreman - CoCo Paving
01.2016 - 03.2018
Foreman and Operator - Eastway Construction
06.2010 - 12.2016
Pipe Layer - Clouthier Construction
04.2005 - 06.2010
COREY MATHIEU