Summary
Overview
Work History
Education
Skills
Languages
Timeline
Sub Contractor

Christopher Birch

Peters Instalations
Olds,AB
26
years of professional experience
1
Language

Experienced subcontractor with a strong background in installations, repairs, blueprint reading, and jobsite safety. Known for dependable work, problem-solving, and quality results on residential and trade projects.

Work History

Sub Contractor

9 Years 7 Months
Peters Instalations | 02.2017 - 09.2026
  • Installed fixtures and components while following safety standards and specifications.
  • Inspected completed work to identify defects and ensure quality compliance.
  • Interpreted blueprints and site instructions to complete installation work accurately.
  • Coordinated materials, tools, and equipment to keep jobsites prepared.
  • Collaborated with contractors and trades to sequence tasks efficiently.
  • Resolved onsite issues quickly to reduce delays and rework.
  • Trained crew members on installation methods, safety practices, and workmanship standards.
  • Maintained clean, organized work areas to support safe daily operations.
  • Delivered high level of service to all customers and effectively resolved issues.
  • Managed site preparation and cleanup efforts, maintaining safe working conditions throughout the duration of the project.
  • Worked closely with homeowners to ascertain specifics of project.
  • Worked closely with general contractor on completion of punchlist tasks.
  • Provided exceptional customer service by addressing client concerns promptly and professionally, resulting in repeat business and referrals.
  • Enhanced project efficiency by effectively managing subcontractor teams and coordinating schedules.

Hot Tub Technician

1 Month
Rips Audio and Video | 01.2017 - 02.2017

diagnose leaks and repair leaks on hot tubs.

remove old pumps and spa packs and replace.

pickup and move hot tubs and deliver hot tubs

Sub Contractor

4 Years 2 Months
Peters Instalations | 10.2012 - 12.2016
  • Utilized well-developed carpentry skills to fix [Item] and [Item] in homes.
  • Utilized well-developed carpentry skills to fix [any problems] and complete the job in homes.
  • Oversaw budgeting and financial management for multiple projects, optimizing resource allocation and minimizing costs.
  • Tracked attendance and submitted work logs every day.

Welder

8 Months
NWP | 01.2012 - 09.2012
  • Interpreted blueprints and weld symbols to complete precise structural and fabrication welds
  • Operated MIG, TIG, and stick welding equipment for diverse metal assemblies
  • Inspected finished welds for quality, alignment, and compliance with specifications
  • Prepared surfaces, fit components, and positioned materials for accurate welding setup
  • Maintained welding tools, torches, and protective equipment for safe, reliable operation
  • Followed shop safety procedures and hazard controls during cutting and welding tasks
  • Mentored newer welders on technique, equipment setup, and quality standards
  • Welded in flat, horizontal, vertical, and overhead positions.
  • Maintained clean working environment by consistently organizing tools and equipment, promoting workplace safety.
  • Demonstrated versatility in various welding methods including MIG, TIG, Stick, and Flux Core Welding techniques.
  • Fabricated shop parts directly from blueprints.
  • Operated hoists, cranes, and power tools to dismantle equipment to find and remove defective parts.
  • Inspected welds and checked critical measurements to meet specifications.
  • Removed and repaired unacceptable welds with air arc and grinder to meet quality guidelines.
  • Assisted in blueprint reading and interpretation for accurate alignment of parts during assembly process.

Welder

5 Months
Westward Products Ltd | 03.2011 - 08.2011
  • Coordinated repair and fabrication priorities, ensuring production flow met project deadlines
  • Clamped, held, tack-welded, heat-bent and bolted component parts to achieve required configurations and positions.
  • Prepared welding equipment for advanced tasks, contributing to high-quality welds.
  • Followed precise welding procedures and maintained equipment settings to consistently achieve high welding quality.
  • Reduced workplace accidents through strict compliance with safety regulations and guidelines.
  • Increased production efficiency with expert time management skills and adherence to project deadlines.
  • Completed welding projects using gas tungsten arc, gas metal arc, flux-cored arc, plasma arc, and shielded metal arc equipment.
  • Set up and operated shielded metal arc and gas metal arc welding equipment.
  • Chipped off excess weld, slag, and spatter using hand tools.
  • Conducted thorough inspections of welds to ensure adherence to industry standards and codes.
  • Developed customized welding techniques for unique materials, optimizing fabrication processes.

Roof Shingler

5 Months
Birch Contracting | 09.2010 - 02.2011
  • Installed asphalt shingles, underlayment, and flashing according to roofing specifications.
  • Removed old roofing materials and prepared surfaces for safe, accurate installation.
  • Verified roof alignment, seal integrity, and finish quality before project completion.
  • Operated roofing tools and equipment while following fall protection and jobsite safety practices.
  • Trained new roofers on shingle layout, fastening techniques, and material handling.
  • Identified damaged decking, leaks, and weak areas requiring repair before shingling.
  • Facilitated seamless transitions between roof slopes and angles with precise cutting and fitting of shingles at edges and corners.

Welder

11 Months
Extream Energy | 10.2008 - 09.2009
  • Delivered high-quality customer service as a reliable and skilled welder, contributing to positive company reputation and repeat business.
  • Optimized material usage by accurately measuring and cutting required components prior to welding.
  • Utilized blueprints and diagrams to compare finished products against design specifications.
  • Collaborated with team members for seamless project execution, improving overall productivity.
  • Enhanced workshop safety by consistently adhering to all safety protocols and conducting regular equipment checks.
  • Solved complex welding challenges by applying specialized techniques in MIG, TIG, and Stick welding.
  • Maintained high standard of quality control, ensuring all welds met or exceeded industry standards.

Welder

9 Months
Modus Steel | 01.2008 - 10.2008
  • Troubleshot technical issues during the welding process, minimizing downtime on projects.
  • Strengthened client relationships by delivering consistent, high-quality workmanship on all projects.
  • Provided support in developing custom jigs/fixtures to facilitate more efficient production workflows.
  • Cut, ground and bent edges of materials to be joined for snug fit using power grinders and hand tools.
  • Welded metal components in vertical, overhead and flat positions.
  • Maintained safety by wearing protective equipment, staying alert and following procedures.
  • Welded various connections with high-quality final results.

Welder

10 Months
Westeel | 01.2007 - 11.2007
  • Mentored junior welders, sharing knowledge to enhance their skill sets and career development.
  • Increased efficiency in metal fabrication with precise welding techniques for complex assemblies.
  • Supported junior welders through mentorship, enhancing team capabilities with shared knowledge and experience.
  • Cleaned material surfaces to remove dirt or excess acid using chemical solutions, wire brushes and grinders.
  • Prepared for assembly by positioning, aligning and securing parts using tools such as jigs and vises.
  • Inspected welds for accuracy and conformance to specifications.
  • Operated MIG, TIG, and stick welding equipment for diverse metal assemblies
  • Inspected finished welds for quality, alignment, and compliance with specifications
  • Maintained welding tools, torches, and protective equipment for safe, reliable operation

Welder

1 Month
W5 Seismic Company Limited | 12.2006 - 01.2007
  • Reduced material waste with careful planning and accurate cutting of metal components.
  • Collaborated on design of custom metalwork projects, meeting client specifications with innovative solutions.
  • Bolted, clamped and tack-welded parts to secure components prior to welding.
  • Prepared surfaces, fit components, and positioned materials for accurate welding setup
  • Followed shop safety procedures and hazard controls during cutting and welding tasks
  • Welded in flat, horizontal, vertical, and overhead positions.
  • Demonstrated versatility in various welding methods including MIG, TIG, Stick, and Flux Core Welding techniques.

Sub Contractor

10 Months
Wagner Contracting | 01.2006 - 11.2006
  • Operated hand tools and power tools while following safety procedures and job specifications.
  • Inspected equipment and materials before use to help prevent delays and safety issues.
  • Supervised additional subcontractors and craftsmen.
  • Interpreted blueprints and site instructions to complete installation work accurately.
  • Maintained clean, organized work areas to support safe daily operations.

Drywall Installer/Drywall Taper

1 Year 10 Months
CTS Interiors | 01.2005 - 11.2006
  • Hung drywall assemblies using proper fasteners, lifts, and hand tools for stable alignment.
  • Taped, mudded, and sanded joints to prepare smooth surfaces for painting and finishing.
  • Installed drywall panels, framing, and finishing materials for interior construction projects.
  • Measured, cut, and fitted sheetrock to match layouts, openings, and design specifications.

Framer

1 Year 8 Months
RH Construction Services | 01.2004 - 09.2005
  • Interpreted blueprints to verify measurements, layouts, and structural alignment
  • Installed lumber, sheathing, and structural supports using saws, nailers, and hand tools
  • Framed walls, floors, and roofs according to construction drawings and specifications
  • Coordinated framing tasks with carpenters, supervisors, and subcontractors to maintain workflow

Labourer

1 Year
Peter's Installation's | 02.2003 - 02.2004
  • Measured, cut, and prepared materials to support accurate installation work.
  • Assembled and positioned components according to project specifications and crew direction.
  • Operated hand tools and power tools safely during site preparation and assembly tasks.
  • Assembled and positioned components based on project specifications.

Installer

11 Months
JSND | 02.2002 - 01.2003
  • Interpreted blueprints, drawings, and measurements to complete accurate installations.
  • Installed equipment and assemblies according to specifications and site requirements.
  • Inspected finished work to verify alignment, fit, and compliance with safety standards.
  • Coordinated with clients and site teams to resolve installation issues efficiently.
  • Operated hand and power tools safely during assembly and installation tasks.
  • Maintained organized work areas and followed jobsite safety protocols consistently.
  • Operated tools, equipment, and machinery according to safety standards.
  • Maintained a safe work environment by strictly adhering to safety protocols and guidelines.

Framer

1 Year 5 Months
SDC Homes | 03.2001 - 08.2002
  • Repaired framing issues and adjusted assemblies to meet jobsite requirements
  • Inspected framing work for accuracy, plumb, level, and code compliance
  • Mentored crew members on framing techniques, layout methods, and quality standards
  • Led safe material handling and tool use to support efficient jobsite operations

Education

No Degree - grad 10

Outreach | Didsbury, AB

Skills

Installation and repair
Material handling
Installations and repairs
Safety procedures
Job site maintenance
Scheduling and planning
Time management
Job site cleanup
Problem-solving
Site preparation
Wiring diagram analysis
Wiring diagram interpretation

Languages

English
Professional Working

Timeline

Sub Contractor

Peters Instalations
02.2017 - 09.2026Read More

Hot Tub Technician

Rips Audio and Video
01.2017 - 02.2017Read More

Sub Contractor

Peters Instalations
10.2012 - 12.2016Read More

Welder

NWP
01.2012 - 09.2012Read More

Welder

Westward Products Ltd
03.2011 - 08.2011Read More

Roof Shingler

Birch Contracting
09.2010 - 02.2011Read More

Welder

Extream Energy
10.2008 - 09.2009Read More

Welder

Modus Steel
01.2008 - 10.2008Read More

Welder

Westeel
01.2007 - 11.2007Read More

Welder

W5 Seismic Company Limited
12.2006 - 01.2007Read More

Sub Contractor

Wagner Contracting
01.2006 - 11.2006Read More

Drywall Installer/Drywall Taper

CTS Interiors
01.2005 - 11.2006Read More

Framer

RH Construction Services
01.2004 - 09.2005Read More

Labourer

Peter's Installation's
02.2003 - 02.2004Read More

Installer

JSND
02.2002 - 01.2003Read More

Framer

SDC Homes
03.2001 - 08.2002Read More

Outreach

No Degree from grad 10
Read More
Christopher Birch