Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Chengmin Guo

Edmonton,AB

Summary

Proven skills in coordinating operations, maintaining records and completing daily logs and reports. Experienced in accurately and efficiently managing schedules, inspections and corrective actions. Committed Power Engineer with strong production background. Focused on maintaining team safety and meeting challenging performance targets. Skilled in managing supplies and keeping line moving smoothly. Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level Power Engineer position. Ready to help team achieve company goals. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

9
9
years of professional experience

Work History

Power Plant Engineer

Dalian NO.2 Power Plant
09.1990 - 01.2000
  • Participated in regulatory compliance audits, addressing any deficiencies identified to maintain adherence to industry standards and guidelines.
  • Optimized spare parts inventory management system, reducing unnecessary expenditures on excess stock while maintaining adequate supplies for emergency situations.
  • Monitored control panel data to ensure plant operations were within parameters.
  • Tested water and condensate to check safety and compliance with regulations.
  • Examined and adjusted valves, pumps and other equipment to verify proper functioning.
  • Followed safety protocols and procedures to maintain safe working environment.
  • Operated boilers, turbines and other power plant equipment.
  • Led efforts in identifying potential areas of improvement, resulting in increased reliability and reduced operating costs.
  • Developed comprehensive maintenance schedules for timely upkeep of power plant machinery, reducing downtime and ensuring smooth operations.
  • Kept plant areas clean and ready for inspections to maintain high audit and compliance scores.
  • Assessed risks associated with various aspects of power plant operations, implementing appropriate mitigation measures to protect against potential hazards and minimize possible consequences.
  • Coordinated delivery of services and supplies to meet operational needs of power plant.
  • Completed daily inspections and tests on plant equipment and documented findings.
  • Examined and adjusted valves, pumps and other equipment to ensure proper functioning.
  • Implemented rigorous testing protocols for all critical components, ensuring optimal functionality under varying conditions.
  • Documented daily activities in internal system and submitted timely shift reports.
  • Improved power plant efficiency by optimizing equipment performance and implementing energy-saving measures.
  • Diagnosed and resolved operational issues affecting power plant equipment function or performance.

Education

No Degree - Power Engineering (4th Class)

BCIT
Burnaby, BC
08.2006

Bachelor of Science - Power And Process Engineering

Xian Jiaotong Univercity
Xian City, Shanxi Province, China
07.1990

Skills

  • Lockout and tagout procedures

  • Hazardous Materials Handling

  • Preventive Maintenance

  • Documentation

  • Power generation systems

  • Safety Management

  • Pressure monitoring

  • Controls Monitoring

  • Inspection skills

  • Safety Protocols Implementation

  • Boiler Operations

  • Sample Collection

  • Steam Turbine Knowledge

  • Safety reporting

  • Data Entry

  • Microsoft Word

  • Documentation skills

  • Analytical and Critical Thinking

Languages

English
Full Professional

Timeline

Power Plant Engineer

Dalian NO.2 Power Plant
09.1990 - 01.2000

No Degree - Power Engineering (4th Class)

BCIT

Bachelor of Science - Power And Process Engineering

Xian Jiaotong Univercity
Chengmin Guo