Summary
Overview
Work History
Education
Skills
Certification
Languages
Highlight project:
Timeline
Generic

CHADY AMINE

Toronto,ON

Summary

Observant survey manager with more than 20 years of experience.

Well-developed communication, problem-solving and planning abilities.

Able to oversee simultaneous projects and maintain tight schedules.

Strong leaders and decision maker. Skilled at performing field surveys and operating a diverse range of land surveying team, equipment and tools. Proficient with using various surveying computer programs.

Seeking work opportunity to expand my current skill set, while contributing to my career goals.

Overview

25
25
years of professional experience
1
1
Certification

Work History

SURVEY MANAGER

EllisDon
TORONTO-CANADA
05.2023 - Current
  • Direct reporting to the Civil Director.
  • Monitor and manage simultaneous projects and maintain tight deadlines schedule.
  • Supervise and lead surveying team by providing guidance, assigning tasks, and fostering a collaborative work environment.
  • Develop surveying plans, determine the scope, objectives and methods required for accurate data collection, compute geodetic measurements, and interpret survey data to determine positions, shapes, and elevations of subsurface and topographic features.
  • Collaborate with surveyors, engineers, contractors, and other engineering-related professionals to integrate survey data into construction processes.
  • Prepare or supervise preparation and maintain sketches, maps, reports, and legal descriptions of surveys to describe, certify, and assume liability for work performed.
  • Prepare or supervise preparation of all data, charts, plots, maps, records, and documents related to surveys.
  • Prepare or supervise preparation of the results of surveys including the shape, contour, location, elevation, clearances, and dimensions of features.
  • Prepare and check all data related to survey works, including clash detection and transforming Design 2D drawings into 3D Model using the appropriate Survey software’s (CAD, Civil3D, TBC, LisCad,...)
  • VDC works, by using of other digital tools, such as 3D laser scanning, point cloud data, and managing the planning, visualization, and computer modeling of building projects.
  • Verify the accuracy of survey data including measurements and calculations conducted at survey sites.
  • Verify the accuracy of survey equipment by maintaining the calibration on time.
  • Assisting in the planning and organizing of the survey, including arranging equipment assignments and coordinating field operations with survey teams.
  • Installation of relevant tools and programs to the tablets, create data collection protocols and procedures for using digital equipment and software in the field and during the downloading of collected data to the central database.
  • Responsible for performance management of all direct-report employees, including coaching/mentoring, assistance with career planning and training, preparation of yearly and mid-year performance reviews.

Senior Surveyor

EllisDon
TORONTO-CANADA
07.2019 - 04.2023
  • Responsible of all trades related to surveying work in accordance with the company's Specifications, policies & procedures.
  • Overseeing sites and directing crews on survey plans associated with engineering and construction projects.
  • Data Collection using GPS , Total Station , Robotic Total Station and Laser Scanning.
  • Providing detailed layout at various stages of construction.
  • Creating accurate Control from existing to assist with strategic layout.
  • Managed multiple surveying projects simultaneously while ensuring deadlines were met.
  • Collaborated with other professionals such as engineers, architects, planners., to facilitate project completion.
  • Verified accuracy of survey measurements and calculations conducted at survey sites.
  • Verify the accuracy of survey equipment by maintaining the calibration on time.
  • Supervised a team of surveyors in the field and office to complete projects efficiently.
  • Assisted in the preparation of bids and proposals for new projects.
  • Ensured compliance with all safety regulations and standards while performing fieldwork activities.
  • Provided technical guidance to less experienced staff members on various surveying tasks.
  • Prepared detailed reports summarizing findings from surveys conducted in the field.

SENIOR SURVYOR

SEG-QATAR
DOHA-QATAR
03.2005 - 02.2019
  • Responsible of all trades related to surveying work in accordance with the company's Specifications, policies & procedures.
  • Supervised efficient working of Survey crew members on various construction activities.
  • Overseeing sites and directing crews on survey plans associated with engineering and construction projects.
  • Providing detailed layout at various stages of construction.
  • Managed multiple surveying projects simultaneously while ensuring deadlines were met.
  • Collaborated with other professionals such as engineers, architects, planners., to facilitate project completion.
  • Verified accuracy of survey measurements and calculations conducted at survey sites.
  • Verify the accuracy of survey equipment by maintaining the calibration on time.
  • Supervised a team of surveyors in the field and office to complete projects efficiently.
  • Coordinate Shop Drawings with engineers and other people concerned in project.
  • Preparation of necessary drawings for layout using AutoCAD, Land-desktop, Civil3D , Liscad…)
  • Maintained accurate records of survey notes, measurements, calculations, skhes, photographs.
  • Prepared detailed reports summarizing findings from surveys conducted in the field.
  • Conducted site inspections during various stages of construction activities for quality assurance purposes.

LAND SURVEYOR

LEBANESE ARMY-ENGINEERING DEPARTMENT
BEIRUT-LEBANON
11.2003 - 11.2004
  • Conducted boundary surveys, topographic surveys, and right-of-way surveys to create accurate maps and plans.
  • Verifying the accuracy of survey data, including measurements and calculations conducted on site.
  • Gathered data from field notes and aerial photographs using GPS technology.
  • Operated survey instruments such as total stations, transits, theodolites, levels, and electronic distance measuring devices.
  • Researched records at county offices to obtain property information such as deed descriptions or existing survey plats.
  • Established horizontal and vertical control points with precision instruments to ensure accuracy of measurements.
  • Created detailed reports summarizing survey results for clients or employers.
  • Inspected construction sites to ensure that all structures are accurately located according to established plans or specifications.
  • Performed quality assurance checks on collected data before submission to supervisor for review.
  • Read and interpreted legal documents, construction drawings and maps to complete surveys.

Land Surveyor

GISSNET/Mideast GIS & Survey New Technologies
BEIRUT-LEBANON
03.1999 - 11.2004
  • Responsible for surveying works on site coordinated with the head of surveying department.
  • lAY out of vertical and horizontal alignment for, columns, footings, mechanical layout, elevators, walls, slab limit, and all required finishing works for buildings.
  • As-built on site, with submitting needed reports for the chief surveyor in order to verify it and submit it to the consultant.
  • Following up of productivity with the Chief Surveyor.
  • Operated survey instruments such as total stations,gps , levels, and electronic distance measuring devices.
  • Established horizontal and vertical control points with precision instruments to ensure accuracy of measurements.
  • Inspected construction sites to ensure that all structures are accurately located according to established plans or specifications.
  • Maintained records of all surveying activities conducted by self or other members of team.
  • Verified accuracy of survey measurements and calculations conducted at survey sites.
  • Utilized land-desktop and AutoCAD to prepare drawings and maps of properties.

Education

BACHELOR DEGREE DIPLOMA - SURVEYING

LEBANESE UNIVERSITY
BEIRUT-LEBANON
06-2003

Skills

  • Leadership
  • Project Management
  • Technical Expertise
  • Data analysis
  • Communication
  • Problem solving
  • Team Collaboration
  • Adaptability
  • Active Listening
  • Self-directed mindset

Certification

  • Autodesk Certificate in Civi3D. (Certificate No : AP70232509777794376927).
  • LISCAD (Leica Surveying & Engineering Field & Office Software).
  • TBC ( TRIMBLE BUISNESS CENTER).

Languages

English
Full Professional
French
Professional
Arabic
Native/ Bilingual

Highlight project:

Canada : QEW/Credit River Project.

                Stoufville Regional Express Rail.

Qatar :    DARWISH TOWER,Boulevard Mall , Falcon Tower,Qatar University student housing project , Oklah Secondary School, Alshemoukh Twin Tower,Doha Bank headquarter,Heritage Grand Hotel Doha, Aspetar Hospital Expansion , Al-Nakheel Tower,Golden Tower,Navigation Tower,67 Villa Compound,Ali Bin Ali Showrom Building , Ali Bin Ali Palace 

Lebanon :  Lebanese University Campus : · This 850,000 sqm project consisted of the turnkey construction of an entire university Campus in Beirut. Built over on a period of 9 years (1997-2006) and comprised of 13 Schools and faculties, Landscaping area over than 250,000 sqm , Sports stadiums and Student apartment buildings for almost 33,000 Students.

 

Timeline

SURVEY MANAGER

EllisDon
05.2023 - Current

Senior Surveyor

EllisDon
07.2019 - 04.2023

SENIOR SURVYOR

SEG-QATAR
03.2005 - 02.2019

LAND SURVEYOR

LEBANESE ARMY-ENGINEERING DEPARTMENT
11.2003 - 11.2004

Land Surveyor

GISSNET/Mideast GIS & Survey New Technologies
03.1999 - 11.2004

BACHELOR DEGREE DIPLOMA - SURVEYING

LEBANESE UNIVERSITY
CHADY AMINE