Dynamic and detail-oriented professional with a strong work ethic. Proven ability to collaborate effectively within teams while maintaining safety standards.does well under-pressure. Bilingual in English and Spanish, I excel in customer service and problem-solving, ensuring client satisfaction and repeat business through meticulous attention to detail. Always willing to learn new skills and experiences
Overview
21
21
years of professional experience
1
1
Certification
Work History
Painter, Maintenance
Castillo’s Painting
Los Angeles, CA
04.2025 - 03.2026
Assisted in surface preparation and priming for painting projects.
Operated various painting tools and equipment safely and efficiently.
Maintained cleanliness of work areas to promote safety and organization.
Mixed paint according to specifications, ensuring color accuracy and consistency.
Collaborated with team members to complete projects within deadlines.
Supported lead painters by handling materials and supplies as needed.
Learned techniques for applying paint finishes on diverse surfaces.
Adapted quickly to new tasks and responsibilities in fast-paced environments.
Delivered consistent high-quality workmanship, earning recognition from supervisors and contributing to repeat business from satisfied clients.
Maintained proper safety standards by using personal protective equipment during all phases of painting tasks.
Contributed to customer satisfaction by paying attention to detail and providing smooth finishes on painted surfaces.
Assisted with the mixing and matching of paint colors to meet client specifications and design requirements.
Minimized waste by properly storing unused paint and cleaning equipment after each use.
Filled cracks, holes and joints with fillers using caulking guns and putty knives.
Examined surfaces for imperfections and applied additional coats to achieve smooth, even finish.
Maintained painting equipment by cleaning paint guns, hoses and other equipment with paint
Respectfully handling customers and working with their vision
Construction Contractor
Self-employeed
Los Angeles, CA
01.2024 - 01.2025
Managed construction projects from planning through completion, ensuring adherence to client specifications.
Supervised subcontractors and tradesmen to maintain quality standards and project timelines.
Developed and maintained strong relationships with clients, suppliers, and regulatory agencies.
Implemented safety protocols and procedures, reducing workplace incidents and enhancing team compliance.
Estimated project costs and prepared budgets, optimizing resource allocation for maximum efficiency.
Conducted site inspections to monitor progress, ensuring compliance with building codes and regulations.
Trained new hires on best practices in construction techniques and safety measures to promote skill development.
Enhanced workflow processes by leveraging advanced tools for project management and scheduling coordination.
Streamlined material procurement processes to minimize delays and ensure timely delivery of essential supplies.
Fostered a strong sense of teamwork among crew members through clear communication of expectations combined with recognition for individual accomplishments contributing to the success of each project phase.
Interviewed, hired, and trained new workers.
Kept projects on schedule and within budget while serving as project leader.
Consulted with clients to define objectives and develop scopes.
Demonstrated commitment to customer service excellence by consistently addressing client needs promptly, maintaining a professional demeanor in all interactions, and delivering finished products that met or exceeded expectations.
Reduced overall costs for clients by negotiating favorable contracts with suppliers and vendors.
Completed projects on time and within budget by closely monitoring progress and adjusting schedules as necessary.
Reviewed contractor invoices, approving payments on acceptable work.
Performed regular inspections of job sites to verify staff and subcontractor observance of important safety protocols.
Assessed Type project plans, spoke with clients, or designers and visited job site to better understand project scope and client desires.
Worked on sites, installing siding and other exterior components.
Helped with door and window installations.
Used variety of hand and power tools to complete tasks.
Cleaned and maintained tools, equipment and worksites.
Loaded and unloaded materials onto trucks and trailers.
Loaded and unloaded materials and equipment onto and off construction sites.
Followed instructions and safety protocols to prevent accidents and injuries.
Installed drywall, siding and other structural components.
Managed safe and efficient use of tools and equipment on construction sites.
Followed instructions and safety protocols while operating machinery and equipment.
Provided labor support to carpenters, masons and other skilled trades.
Moved and cleared debris from work sites to dispose of in designated areas.
Assisted in digging, trenching and backfilling trenches and foundations.
Inspected tools and equipment to maintain safety and efficiency.
Finished surfaces of woodwork or wallboard in houses and buildings with paneling, paint and hand tools.
Helped with erecting scaffolding and ladders.
Dug trenches, backfilled holes and compacted earth to prepare for new construction.
Manager
Muskoka Living
Los Angeles, CA
11.2019 - 06.2023
Led team in developing innovative product displays to enhance customer engagement.
Streamlined inventory management processes to improve operational efficiency.
Coordinated training program for staff, fostering skill development and improving service quality.
Managed relationships, ensuring timely delivery of products and maintaining quality standards.
Mentored employees, supporting their professional growth and enhancing team performance.
Managed and motivated employees to be productive and engaged in work.
Accomplished multiple tasks within established timeframes.
Maintained professional, organized, and safe environment for employees.
Resolved staff member conflicts, actively listening to concerns and finding appropriate middle ground.
Maximized performance by monitoring daily activities and mentoring team members.
Cross-trained existing employees to maximize team agility and performance.
Improved safety procedures to create safe working conditions for workers.
Built high-performing teams through effective recruitment, onboarding, and talent development initiatives.
Trained personnel in equipment maintenance and enforced participation in exercises focused on developing confidence.
Defined clear targets and objectives and communicated to other team members.
Construction Foreman
James Ian Wright
Redondo Beach, CA
11.2018 - 08.2019
Followed blueprints and technical drawings to complete installations accurately.
Conducted routine inspections of equipment to ensure proper functioning and safety compliance.
Supported skilled tradespeople in various construction activities, enhancing workflow efficiency.
Assisted with successful, time-sensitive renovations of various structures.
Exhibited exceptional problem-solving abilities under pressure by employing critical thinking skills to overcome complex challenges on job sites.
Enhanced project efficiency by coordinating with team members and managing resources effectively.
Contributed to a positive work culture by fostering teamwork among staff through open communication channels, which led to higher overall productivity levels during projects.
Participated in continuous learning initiatives to enhance professional development within the industry, applying new techniques when necessary for optimal results on job sites.
Increased safety awareness through conducting regular training sessions for staff and implementing best practices on the job site.
Utilized advanced tools and machinery to expedite construction processes, meeting tight deadlines.
Led safety workshops for crew, fostering culture of safety and reducing incidents on site.
Facilitated training sessions for new hires, improving team skill levels and performance.
Improved project delivery timelines by efficiently coordinating tasks among crew members.
Oversaw daily site operations, ensuring all tasks were completed according to plan.
Managed inventory of construction materials, minimizing waste and reducing costs.
Used variety of hand and power tools to complete tasks.
Cleaned and maintained tools, equipment and worksites.
Loaded and unloaded materials onto trucks and trailers.
Loaded and unloaded materials and equipment onto and off construction sites.
Followed instructions and safety protocols to prevent accidents and injuries.
Installed drywall, siding and other structural components.
Managed safe and efficient use of tools and equipment on construction sites.
Followed instructions and safety protocols while operating machinery and equipment.
Provided labor support to carpenters, masons and other skilled trades.
Moved and cleared debris from work sites to dispose of in designated areas.
Assisted in digging, trenching and backfilling trenches and foundations.
Inspected tools and equipment to maintain safety and efficiency.
Finished surfaces of woodwork or wallboard in houses and buildings with paneling, paint and hand tools.
Helped with erecting scaffolding and ladders.
Dug trenches, backfilled holes and compacted earth to prepare for new construction.
Operated hand and power tools for construction tasks, ensuring adherence to safety protocols.
Assisted in site preparation, including excavation and material handling for various projects.
Collaborated with team members to execute building plans according to specifications.
Maintained clean and organized work environment, reducing hazards on job sites.
Participated in safety training sessions, reinforcing commitment to workplace safety standards.
Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
Maintained clean and organized job sites, contributing to a safe working environment for all employees.
Coordinated with subcontractors to ensure quality standards, achieving high levels of client satisfaction.
Improved satisfaction by delivering high-quality workmanship consistently, following up on feedback, and addressing concerns promptly.
Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
Painter, Maintenance
Castillo’s Painting
Los Angeles, CA
11.2016 - 05.2018
Prepared surfaces by cleaning, sanding, and priming for optimal paint adhesion.
Applied various painting techniques to achieve high-quality finishes on diverse surfaces.
Maintained tools and equipment to ensure proper functionality and safety standards.
Collaborated with team members to complete projects efficiently and on schedule.
Assisted in training new staff on proper painting techniques and safety protocols.
Inspected completed work for quality assurance and adherence to specifications.
Implemented time-saving strategies to enhance workflow during painting tasks.
Resolved minor maintenance issues related to painting processes independently.
Applied exterior caulking to building joints and seams.
Performed thorough surface preparation, guaranteeing long-lasting results for clients.
Maintained a clean and organized work environment, minimizing disruptions to surrounding areas.
Enhanced property values through meticulous attention to detail in painting and maintenance tasks.
Improved building aesthetics by skillfully applying various painting techniques and materials.
Performed smoothing and finishing work on walls, trim and cabinetry.
Taped around windows and fixtures prior to painting walls.
Collaborated with other professionals to complete multi-faceted projects on time and budget.
Valued for being extremely detail oriented.
Mentored junior team members, fostering their professional growth and improving overall team performance.
Developed expertise in various types of paints and coatings, allowing for tailored solutions based on client needs.
Delivered cost-effective services without compromising quality or safety standards.
Performed flat glass repairs and minor structural repairs to concrete and wood decks, window trim, windows and door casings.
Increased customer satisfaction through effective communication and timely project completion.
Painted surfaces using brushes, spray guns, and paint rollers.
Applied primer, paints, varnishes and lacquers to walls and surfaces using traditional and sprayer methods.
Prepared trim, walls and ceilings for painting by cleaning, smoothing, and priming.
Painted indoor areas such as hallways, bathrooms, and lobbies.
Prepared surfaces and surrounding areas for painting using sandpaper, tape, and other materials.
Operated power sprayers and hand tools to prepare and paint large areas.
Climbed scaffolding, staging, ladders, and planks to reach work area surfaces and observed safety protocols to prevent falls.
Protected surfaces from damage and spills by using drop cloths prior to and during painting.
Applied putty, wood filler, spackling, and caulks to prep uneven surfaces and fill in holes.
Calculated amount of paint and other materials needed for each job accurately.
Patched cracks, holes and other imperfections in walls and other surfaces.
Repaired drywall and plaster prior to painting.
Taped off areas to prevent overspray and other accidents.
Removed wallpaper and sanded surfaces to prepare for paint application.
Conducted final work check to assess quality and make corrections if necessary.
Construction Worker
Patrick Kealy
Manhattan Beach, CA
10.2013 - 09.2016
Operated hand and power tools for construction tasks, ensuring adherence to safety protocols.
Assisted in site preparation, including excavation and material handling for various projects.
Collaborated with team members to execute building plans according to specifications.
Maintained clean and organized work environment, reducing hazards on job sites.
Participated in safety training sessions, reinforcing commitment to workplace safety standards.
Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
Maintained clean and organized job sites, contributing to a safe working environment for all employees.
Loaded, unloaded, and moved material to and from storage and production areas.
Worked independently in fast-paced environment while meeting productivity and quality expectations.
Gathered and disposed of worksite debris to remove safety hazards.
Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
Completed construction projects on time by adhering to strict deadlines and prioritizing tasks appropriately.
Assisted with basic carpentry work such as installing wooden floors and crown molding.
Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
Operated power equipment to move materials and promote job efficiency.
Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
Adapted quickly to changing project requirements, demonstrating flexibility and resourcefulness in adjusting schedules and priorities accordingly.
Reduced material waste by accurately calculating requirements and optimizing usage throughout the project lifecycle.
Improved client satisfaction by delivering high-quality workmanship consistently, following up on feedback, and addressing concerns promptly.
Coordinated with subcontractors to ensure quality standards, achieving high levels of client satisfaction.
Painting Assistant
Joey
Hermosa Beach, CA
09.2011 - 10.2013
Assisted in mixing and preparing paint according to specifications for various projects.
Supported lead painters by organizing tools and maintaining clean workspaces.
Collaborated with team members to ensure project timelines were met efficiently.
Learned safety protocols related to paint application and handling hazardous materials.
Executed routine tasks such as surface preparation and priming under supervision.
Adapted quickly to changing project requirements while maintaining high-quality standards.
Provided support in inventory management, ensuring availability of necessary supplies.
Developed skills in color matching and application techniques through hands-on experience.
Accomplished timely completion of assigned tasks by working independently or collaborating with team members, ensuring adherence to project deadlines.
Aided in training new painting assistants, sharing best practices and techniques for optimal performance within the team.
Maintained open communication lines between painting crew and supervisors, providing relevant updates on project status throughout completion stages.
Community Service Worker
Los Angeles Conservation Corps LACC
Los Angeles, CA
06.2009 - 06.2011
Advised clients on effective utilization of community resources to enhance service delivery.
Facilitated needs assessments aimed at understanding and addressing specific client needs.
Designed and facilitated interactive workshops aimed at fostering skill growth and overall wellness.
Engaged with local organizations to strengthen service delivery and expand outreach efforts.
Designed and implemented individualized strategies to address specific client needs and obstacles.
Implemented strategic initiatives aimed at improving program efficiency and fostering client satisfaction.
Conducted comprehensive needs assessments to identify essential areas for service improvement.
Evaluated advancements in alignment with service plan goals to ensure effective implementation.
Facilitated work-study program to achieve high school diploma completion.
Painting Assistant
Joey
Hermosa Beach, CA
02.2005 - 04.2009
Followed blueprints and technical drawings to complete installations accurately.
Conducted routine inspections of equipment to ensure proper functioning and safety compliance.
Supported skilled tradespeople in various construction activities, enhancing workflow efficiency.
Assisted with successful, time-sensitive renovations of various structures.
Exhibited exceptional problem-solving abilities under pressure by employing critical thinking skills to overcome complex challenges on job sites.
Enhanced project efficiency by coordinating with team members and managing resources effectively.
Contributed to a positive work culture by fostering teamwork among staff through open communication channels, which led to higher overall productivity levels during projects.
Participated in continuous learning initiatives to enhance professional development within the industry, applying new techniques when necessary for optimal results on job sites.
Increased safety awareness through conducting regular training sessions for staff and implementing best practices on the job site.
Utilized advanced tools and machinery to expedite construction processes, meeting tight deadlines.
Led safety workshops for crew, fostering culture of safety and reducing incidents on site.
Facilitated training sessions for new hires, improving team skill levels and performance.
Improved project delivery timelines by efficiently coordinating tasks among crew members.
Oversaw daily site operations, ensuring all tasks were completed according to plan.