Summary
Overview
Work History
Education
Skills
Timeline
Generic

Caglayan Yeniceri

Toronto,ON

Summary

Qualified Mechanical Engineer with extensive knowledge of engineering equipment and software. Committed to providing accurate work with eye for detail. Consistently commended for meeting stringent project deadlines under budget. Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level mechanical engineer position. Ready to help team achieve company goals. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

9
9
years of professional experience

Work History

Mechanical Engineer

GATE Construction
05.2021 - 05.2022

Kocaeli Integrated Health Campus


I am responsible for all mechanical operations in the main building, approximately 140,000
m2. My daily routines include but are not limited to are production, installation, and
coordination of all subcontractors. Mechanical system tests fall under my responsibility.

MEP Manager

Matte Construction
10.2020 - 04.2021

Patio Villa Project


  • Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.
  • Monitored construction sites for compliance with safety regulations and adherence to standards.
  • Established and maintained relationships with vendors to source affordable and high quality materials and equipment for construction projects.
  • Tracked project costs and other financial metrics to maximize profitability.
  • I supervise all mechanical-related endeavors, electrical subcontractors, and all phases of logistical
    handling of MEP workflow. All field installations, temporary and permanent, are governed and
    acknowledged by me.

Mechanical Engineer

Pernix Group, Inc & Rönesans Holding
04.2018 - 07.2019

The New Office Annex in Kampala (OBO Project)


  • Evaluated final product's overall performance, reliability and safety.
  • Identified deficiencies in mechanical processes to develop improvements.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines.
  • I guarantee that all work will meet or exceed the contract specifications. I document pressure
    tests incorporated with visual inspection forms backed by maintenance records. All DIFC
    wall/ceiling inspections conducted with myself and OBO

Mechanical Engineer

Caddell Construction Co., LLC & ENKA İnşaat Ve San
08.2017 - 03.2018

The new U.S. Embassy Project in Asunción


Bureau of Overseas Buildings Operations’ (OBO)


  • Evaluated final product's overall performance, reliability and safety.
  • Identified deficiencies in mechanical processes to develop improvements.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines.

Mechanical Engineer

Caddell Construction Co., LLC & ENKA İnşaat Ve San
08.2015 - 04.2017

New Embassy Compound Nouakchott, Mauritania (OBO Project)


  • Evaluated final product's overall performance, reliability and safety.
  • Identified deficiencies in mechanical processes to develop improvements.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines.
  • I guarantee that all work will meet or exceed the contract specifications. I document pressure tests incorporated with visual inspection forms backed by maintenance records. All DIFC wall/ceiling inspections conducted with myself and OBO

Project Worksite Manager

Akdeniz Shipyard
12.2013 - 02.2014

I did the installation and removal of the lack of control in place starting from the manufacturing front in the implementation of the project. I remedied the error by the source control of the joined parts.

Working as a Shift Engineer

Doğa Gıda A.Ş.
09.2013 - 12.2013

On behalf of the continuity of production and making the necessary preparations to enable the machines to operate continuously, taking the required measures.

Follow-up studies have been - boiler room, press, pre-treatment, extraction units, auxiliary units, and breakdown maintenance periods.

And relaying the necessary information to the relevant authorities by reporting faults.

Education

A Bachelor of Engineering - Mechanical Engineering

Sakarya University
Sakarya - Turkiye
07.2012

Skills

  • Site mechanical systems installations management
  • team management
  • AutoCAD
  • Test Procedures
  • Quality Control Standards
  • Technical Documentation
  • Mechanical Engineering
  • Fuel Systems
  • Verbal and Written Communication Skills
  • Technical Presentations
  • Centralized Heat and Gas
  • Staff Management
  • Pump and Piping Systems
  • Troubleshooting
  • Quality Assurance Controls
  • Water and Steam Systems
  • Bill of Material (BOM)
  • Microsoft Office Suite
  • Technical Direction
  • On-Site Inspections
  • Technical Solutions Development

Timeline

Mechanical Engineer

GATE Construction
05.2021 - 05.2022

MEP Manager

Matte Construction
10.2020 - 04.2021

Mechanical Engineer

Pernix Group, Inc & Rönesans Holding
04.2018 - 07.2019

Mechanical Engineer

Caddell Construction Co., LLC & ENKA İnşaat Ve San
08.2017 - 03.2018

Mechanical Engineer

Caddell Construction Co., LLC & ENKA İnşaat Ve San
08.2015 - 04.2017

Project Worksite Manager

Akdeniz Shipyard
12.2013 - 02.2014

Working as a Shift Engineer

Doğa Gıda A.Ş.
09.2013 - 12.2013

A Bachelor of Engineering - Mechanical Engineering

Sakarya University
Caglayan Yeniceri