I have 46 years of track work and at various levels starting from a track Laborer working my way to a Track Superintendent, work in track maintenance, replacing tangent and curve tracks on direct fixation,wood tie and ballast, concrete single plus concrete double ties, replaced double slip switches single # 8,9 & 10 switches.
Eglinton Crosstown Line LRT
Supervise a union crew of 100 workers at one time on building of the 25km of new track,track switches and all components associated with new installation.
Overseeing crews replace Double slip switches and install new, plus new track ties and rail on tracks leading into Union Station Railway Corridor, plus updating the signaling system and adding new to the new lead tracks being built. For Go Transit up grade of the east side of Union Station.
March 2011=May 2017
Move to the new subway extension from North York to Vaughan TYSSE
Over saw the sub contractor hired for the new construction and installation of double concrete ties, rail, new track switches and all associated components as per the design spec's.