Summary
Overview
Work History
Education
Skills
Timeline
GeneralManager

Brian Johnson

Interior specialist
Medicine Hat,AB

Summary

Expert Drywaller with Number years of experience hanging and finishing drywall in commercial and residential environments. Performs and coordinates installation and repair, including tape, mud and texture. Displays strong construction skills using drywall and carpentry tools and documents each job through computer software and photos while maintaining clean work area.

Detail-oriented Drywall Installer with Number years of experience. Skillful leader and with great conflict resolution talents. Proven success in construction and management roles.

Efficient drywall professional with extensive industry background and finish work specialization. Managed drywall installation for large Type facility and adhered to schedule and budget parameters while retaining quality standards. Excellent planning, technical and communications skills enabled delivery of desired results.

Productive Drywall Hanger adept in inspection, installation and repair. Committed to quality and efficiency demonstrated over Number years in the construction industry.

Overview

27
27

Years of professional experience

Work History

Drywaller

Cranes Restoration
Medicine Hat, AB
10.2021 - 12.2021
  • Leveraged blueprints and layout plans to install drywall and prepare for painting.
  • Pressed paper tape into joints to reinforce drywall and hide imperfections.
  • Finished and trimmed drywall with professional-level quality.
  • Completed installation of drywall sheets on commercial and residential properties.
  • Prepared panels by sawing, drilling or cutting holes for electrical outlets, air-conditioning units and plumbing.
  • Sanded joints and treated areas to create smooth surface.
  • Filled joints between panels with multiple layers of compound to strengthen and smooth drywall and drywall joints.
  • Glued, nailed or screwed wallboard panels to wood or metal framework to promote smoother, cleaner and faster hanging and finishing jobs.
  • Applied sealing compound over cracks, holes and nail heads using trowels, broad-knives or spatulas.
  • Demonstrated knowledge of local building codes and requirements on each project.
  • Prepared surfaces for coating applications.
  • Measured and marked cutting lines on drywall for lengths, heights and penetrations.
  • Prepared work area, tools and equipment for job site.
  • Inspected surfaces to evaluate quality and applied extra attention to fill in holes and rectify errors.
  • Scribed cutting lines on drywall and breaks board along cut lines.
  • Received consistent excellent feedback on work quality and customer service.
  • Applied tape to seal joints by embedding into sealing compound.
  • Cut and installed decorative framing and trim.
  • Screwed metal and wooden studs into frames.
  • Read and interpreted schematics and blueprints to lay tiles and drywall in correct places.

Drywaller

Onside Restoration
Medicine Hat, AB
11.2017 - 08.2021
  • Leveraged blueprints and layout plans to install drywall and prepare for painting.
  • Pressed paper tape into joints to reinforce drywall and hide imperfections.
  • Finished and trimmed drywall with professional-level quality.
  • Completed installation of drywall sheets on commercial and residential properties.
  • Prepared panels by sawing, drilling or cutting holes for electrical outlets, air-conditioning units and plumbing.
  • Sanded joints and treated areas to create smooth surface.
  • Filled joints between panels with multiple layers of compound to strengthen and smooth drywall and drywall joints.
  • Glued, nailed or screwed wallboard panels to wood or metal framework to promote smoother, cleaner and faster hanging and finishing jobs.
  • Applied sealing compound over cracks, holes and nail heads using trowels, broad-knives or spatulas.
  • Trained and mentored 4new hires within 6 months.
  • Demonstrated knowledge of local building codes and requirements on each project.
  • Prepared surfaces for coating applications.
  • Measured and marked cutting lines on drywall for lengths, heights and penetrations.
  • Prepared work area, tools and equipment for job site.
  • Inspected surfaces to evaluate quality and applied extra attention to fill in holes and rectify errors.
  • Scribed cutting lines on drywall and breaks board along cut lines.
  • Applied tape to seal joints by embedding into sealing compound.
  • Cut and installed decorative framing and trim.
  • Screwed metal and wooden studs into frames.
  • Read and interpreted schematics and blueprints to lay tiles and drywall in correct places.

Education

Cardston High School
Cardston, AB
06.1995

Skills

  • Crack Sealing
  • Site Conditions
  • Customer Satisfaction
  • Testing Devices
  • Flooring Installation
  • Site Installations
  • Construction Operations
  • Safety Regulations
  • Active Listening
  • Layout Plans
  • Power Washer
  • Organizational Skills
  • Commercial Projects
  • Operational Safety
  • Heavy Labor
  • Miter Saws
  • Drywall Installation
  • Basic Tools
  • Hand and Power Tools
  • Maintaining Clean Work Areas
  • Cost Savings
  • Texture Painting
  • Paint Rollers
  • Daily Logs
  • Structural Repairs
  • Belt Sanders
  • Site Inspection
  • Contractual Obligations
  • Repair Procedures
  • Proper Storage
  • Safety Knowledge
  • Complex Problem-Solving
  • Attentive to Detail
  • Chemical Cleaners
  • Carpenter Assistance
  • Service Calls
  • Tracking Systems
  • Minor Repairs
  • Improvement Plans
  • Team Meetings
  • Computer Tracking
  • Critical Thinking Skills
  • Materials Estimates
  • Training Junior Team Members
  • Parts Replacement
  • Customer Needs Assessments
  • Commercial Property
  • Safe Handling
  • OSHA Regulations
  • Creative Solutions
  • Physical Fitness
  • Training Development
  • General Housekeeping
  • Positive Reinforcement Methods
  • Work Site Preparation
  • Project Scope Understanding
  • Daily Status Reports
  • Finish Coat Application
  • Protective Equipment Knowledge
  • Equipment Selection
  • Multitasking Abilities
  • Effective Prioritization
  • Joint Sealing
  • Performing Finishing Work
  • Drywalling

Timeline

Drywaller

Cranes Restoration
10.2021 - 12.2021

Drywaller

Onside Restoration
11.2017 - 08.2021

Cardston High School
Brian JohnsonInterior specialist