I'm a career-driven person looking to diversify
my career. I'm a highly competent worker
with a great understanding of engineering
technology. I have all my own tools, ready for
any project.
Overview
4
4
years of professional experience
Work History
Electrical Apprentice
KOTA Energy Group
08.2022 - 11.2023
Pulled EMT and PVC conduit wire according to plans and code requirements.
i did hundreds of main panel upgrades to prepare the solar crews for their install
print the permits out for the main panel upgrades and work with the inspectors to get the passed
installed hundreds of batteries (Enphase, Franklin, Storz Power) on the side of peoples houses or in their garage
trouble shooting on of all these different systems to ensure they are working properly
prepare a material list and pick it up for all of my jobs
Followed all safety procedures and guidelines to promote safety while working on electrical systems.
Adhered to electrical and building codes when installing and repairing electrical systems or components.
Foreman
EXO Energy
02.2021 - 08.2022
Inspected completed work to verify quality standards and compliance with criteria.
Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
installed solar panels on various types of racking systems
installed enphase and solar edge systems and commissioned them
bent pipe and installed it to the appropriate location including the pipe on the roof
wire pulls and conducting everyone to get different pull points so the wire pull is streamline
ordered all the appropriate material according to the job depending on the roof type
Apprentice Electrician
Skelly Electric
09.2019 - 01.2020
Worked under supervision of Journeyman Electrician to learn trade and develop electrical knowledge.
Understood and used proper tools and equipment to install and maintain electrical systems.
Delivered, installed and did the general maintenance on
hundreds of standby generators
installed and bent EMT on projects as needed
Operated polyfusion tool on a daily basis in order to attach
couplings onto the polyethylene
Dug trenches 18 inches down to lay our pvc and
polyethylene
Installed gas lines along the side of the customers houses
in some cases
Tied in gas lines to existing propane tanks or natural gas
line