Summary

With 18 years of professional skilled experience in construction, I have a strong background in maintenance, shutdowns, and new construction projects. As a lead worker, I am well-versed in troubleshooting, pipe fabrication, and overseeing major projects. My expertise extends to project maintenance, installation of piping and components in the field, as well as testing, pre-commissioning, and turnover of piping systems. As a Workface Planner, I have successfully closed out numerous piping, electrical, and civil IWP's for turnover. Building trust and reliability with clients is a priority for me. I am proficient in various programs such as McPlus, Bluebeam, Navisworks, IHawk, SPC, O3, Excel, Epic, Matman, Jovix, Coreworx, and IConstruct. Known for my commitment to excellence and ability to thrive in fast-paced environments, I am organized, efficient, dependable, and a skilled multitasker. Additionally, I possess strong problem-solving skills and excel as both a team player and leader. My experience allows me to effectively facilitate communication between tradespeople, engineers, construction teams, and management.

Overview

19
19
years of professional experience

Work History

Workface Insulation & Coating Planner/Coordinator

Altrad/Park DeRochie
09.2023 - 11.2024
  • Generated coating packages
  • IDR Releases (Interdisciplinary releases)
  • Coordinated with management on timelines
  • Coordination of ITRs
  • Building a spreadsheet/tracker to track all test package ITRs, monitor them for quality control, and plan for the department
  • Making sure all revised drawings were given to the field, as well as the proper ITRs, per isometric drawing number
  • Updating quality control progress and mentoring on proper input
  • Trained others on software, drawings, and programs that are implemented onsite on a daily basis
  • Monitored progress of projects against established timelines ensuring that deadlines were met or exceeded
  • Collaborated with clients to determine project requirements and expectations
  • Setup company to be successful
  • Worked directly with production personnel to resolve production scheduling issues and conflicts.
  • Collaborated with cross-functional teams to align goals and ensure project success.
  • Engaged in both long and short-term project planning, strategizing for on-time, high-quality deliverables.

Workface Planner/Coordinator/Testing Foreman

Fluor Constructors
04.2021 - 09.2023
  • Develop IWP's based on path of construction and constructability such as piping test packages, PCOW, DR, and rescoping of undergrounds
  • Close out IWP's for undergrounds for all disciplines such as Civil, Electrical, and Piping
  • Check all ITR's within McPlus, and make sure all scope is completed before execution of the IWP's
  • Order materials per CWP, and follow up until delivered
  • Built a relationship and liaise with all different departments such as construction, quality, engineering and client
  • Perform regular 3 week look ahead reviews of the IWP release plan including constraint management discussions with Superintendents, General Foreman, and applicable Coordinators
  • Ensure all IWP's are updated with any changes such as RFI's, DCN's, and FCN's using the Epic dashboard-SPC Coreworx DOC change DCN/FCN/RFI audit report
  • Create RFI's for construction, and follow up with the client
  • Ensure all IWP's have the newest revisions to the field
  • Ensure the IWP is tracked through its progression in the field to facilitate schedule updates, and IWP status is maintained
  • Lead constraint meetings
  • Determine required resources (i.e Material, specialty equipment, specialty tools, and scaffold needs), and liaise with other discipline supervisors to ensure that resources are requisitioned and available
  • Play an active role in the development of the safety culture on the project, and being a good example
  • Coordinating the field work scope with Superintendents, general foreman, and foreman to make sure it will be executed as per schedule
  • Scheduling, and held meetings with other Superintendents, Construction Managers, engineering and the client to give status updates on the IWP's
  • Work together as a team
  • Utilized strong communication skills to effectively interact with colleagues, vendors, clients and guests
  • Monitored progress of projects against established timelines ensuring that deadlines were met or exceeded
  • Collaborated with clients to determine project requirements and expectations

Redseal Steamfitter/Pipefitter

UA Local 170
08.2020 - 04.2021
  • Fabrication, and fusion welding of HPDE piping
  • Read and interpret company drawings to lay out pipe systems and supported or related equipment
  • Installation of Manholes, GRE piping, and link seals
  • Inspected or tested installed systems using pressure gauge, hydrostatic testing, or other methods
  • Adhered to support and follow all Fluors Health, Safety, Environmental, and sustainability policies

QC Administrator

WPW Inc
02.2020 - 04.2020
  • Interpreted company isometric drawings, and P&ID's to establish proper placement, and installation of components
  • Verified, and recorded correct material such as gaskets, lubricant and bolt-up being used for different disciplines
  • Gathered and organized information on problems and procedures
  • Worked with coworkers, and Quality Assurance to complete tasks
  • Ensured the integrity of flanged connections, minimizing, and eliminating integrity related issues such as leaks at start-up
  • Verified correct equipment, model/serial number, torque range, and calibration date of torque wrenches were per specifications, and the craft adhered to the cleanliness policy

Steamfitter/Pipefitter

Jacobs Industrial Ltd
04.2015 - 10.2018
  • Established strategic goals by gathering pertinent business and operations information
  • Counseled, and disciplined employees, driving performance improvement
  • Assigned, prioritized and delegated tasks and responsibility to departmental employees
  • Monitored schedule of project deliverables and analyses for on-time delivery and accurate results
  • Ordering and overturning inventory, controlling labor, and controlling waste
  • Communicated plans and actions to meet departmental goals
  • Managed expense and investment budgets to meet business operating plans
  • Sourcing staff, coached and motivated team, driving sales and delivering exceptional customer service

Steamfitter/Pipefitter

Irving Oil Ltd
04.2006 - 02.2014
  • Maintenance at Irving Oil Ltd for four and a half years in Saint John, NB maintaining all piping, and components in all units of the refinery
  • Fabrication, steam tracing, steam traps, rigging, signalling heavy equipment
  • Shutdowns, lock out, tag out systems, permitting, coordinating with other trades, operations assist
  • Suncor shutdown with the Boilermakers doing the trays inside of the frac tower, assisting quality to verify correct bolt up
  • Interpretation of P&ID's to verify proper material such as blind flanges, gaskets, and bolt up was used on the proper equipment, and systems
  • Operations assist
  • Nexen Long Lake maintenance foreman/shifter
  • Trouble shooting problematic systems, and implementing proper repair
  • Torquing with pneumatic tools
  • Overseeing and receiving materials, and verifying MTR's
  • Leading a crew while consistently monitoring health, safety, and environmental standards
  • Time sheets, and daily meetings

Education

Steamfitter/Pipefitter

NBCCSJ
Saint John, NB
05-2012

Skills

  • Site inspections
  • Customer focus
  • Environmental awareness
  • Communications management
  • Underground Piping installation - HDPE, GRE, and yellow jacket
  • LNG
  • Refinery Maintenance
  • Potash
  • Nuclear Power Plant
  • Project Planning SAGD Maintenance Industrial Safety
  • Quality Teamwork
  • Close outs
  • Workface Planning
  • Troubleshooting
  • Commissioning

Languages

English
Native or Bilingual

Timeline

Workface Insulation & Coating Planner/Coordinator

Altrad/Park DeRochie
09.2023 - 11.2024

Workface Planner/Coordinator/Testing Foreman

Fluor Constructors
04.2021 - 09.2023

Redseal Steamfitter/Pipefitter

UA Local 170
08.2020 - 04.2021

QC Administrator

WPW Inc
02.2020 - 04.2020

Steamfitter/Pipefitter

Jacobs Industrial Ltd
04.2015 - 10.2018

Steamfitter/Pipefitter

Irving Oil Ltd
04.2006 - 02.2014

Steamfitter/Pipefitter

NBCCSJ