Summary
Overview
Work History
Education
Skills
Timeline
Generic

Arlene Torres

Lompoc

Summary

Dedicated manufacturing lead with a proven track record in quality assurance and production planning. Successfully implemented resource allocation strategies and ensured compliance with FDA regulations, enhancing operational efficiency and teamwork. Eager to leverage skills in a dynamic manufacturing environment. Dedicated and adaptable professional with a proactive attitude and the ability to learn quickly. Strong work ethic and effective communication skills. Eager to contribute to a dynamic team and support organizational goals.

Overview

41
41
years of professional experience

Work History

Manufacturing Lead

Karl Storz
Goleta
01.2010 - 01.2026
  • Working under the supervision of the Production Manager, I worked closely With Production Control to ensure smooth work order flow, on time completions of schedules.
  • Would allocate resources as required based on daily, weekly, and monthly schedules.
  • Rework by MRB and EO's assists in identifying training needs conduct and control, cycle counts, MFG System, minimize aging orders with MRB.
  • U.S.FDA Quality Systems Req 21 CRF ISO13485 and ISO9001.
  • SAP, MPI, Microsoft. Outlook, Excel and Word

Assembler Clean Room

Medtronic
Goleta
01.2010 - 01.2011
  • The clean room assembly of a pressure valve and shunt for hydrocephalus involves several steps.
  • The valve is assembled from silicon molds that include the shunt, surgical stitching, gluing, cutting, inking, and water testing.

EVS Technician

Saint Johns Hospital
Camarillo
01.2006 - 01.2008
  • In the emergency room and operating room, the patient monitors are cleaned and restocked.
  • Hazardous waste is removed in accordance with OSHA regulations.
  • After each use, a medical chassis and camera are tested to ensure compliance with safety requirements.

Proto Type Assembler

CML Wave Flow
Temecula
01.2004 - 01.2006
  • I've worked for various companies, assembling working closely with engineers for Surface Mount Technology (SMT) and Through Hole (TH) machines, Wire Wrap, Pick and Place machines, and more.
  • My responsibilities include installing cabling and switches into chassis, preparing Bill of Materials (BOMs), conducting quality assurance inspections, using hand tools, and ensuring ESD-finished goods.

Document Control

ESI Electronics
Moorpark
01.2000 - 01.2004
  • Ensure the quality of products by conducting QA inspections, maintaining inventory records and documents of assemblies, and adhering to ISO and ESD procedures.
  • Collaborate with manufacturing engineers to develop and revise assembly documentation.

Disk Duplication

CMC Rockwell Collins
Goleta
01.1985 - 01.1998
  • I've kept all hard and soft copies, including ROMs and ICS data, for internal use and shipping to customers.
  • Additionally, I have knowledge of components, hand tools, wire wrapping, assembly, PCB boards, cables, shipping, receiving, inventory, and product packaging.

Education

Santa Barbara High
Santa Barbara

Skills

  • Production planning
  • Quality assurance
  • Resource allocation
  • FDA regulations
  • Manufacturing processes
  • Document control
  • Employee training
  • Problem solving
  • Attention to detail
  • Teamwork and collaboration
  • Flexible and adaptable
  • Critical thinking
  • Multitasking
  • Multitasking

Timeline

Manufacturing Lead

Karl Storz
01.2010 - 01.2026

Assembler Clean Room

Medtronic
01.2010 - 01.2011

EVS Technician

Saint Johns Hospital
01.2006 - 01.2008

Proto Type Assembler

CML Wave Flow
01.2004 - 01.2006

Document Control

ESI Electronics
01.2000 - 01.2004

Disk Duplication

CMC Rockwell Collins
01.1985 - 01.1998

Santa Barbara High
Arlene Torres