Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Overview
8
8
years of professional experience
Work History
Crane Operator, Pump Installer
CalWest Rain
02.2023 - Current
Calculated appropriate size and weight distribution to safely manage load.
Operated large cranes to lift and move materials with precision and accuracy.
Experienced in inspecting cranes and related equipment for safety and operational defects.
Performed daily safety checks to achieve safe operating condition of equipment.
Performed basic electrical tasks, contributing to the successful completion of various repair projects.
Specialized Equipment Operator
Rancho Tree Service
01.2022 - 01.2023
Operated range of heavy equipment on regular basis with advanced skill.
Maintained and cleaned equipment after each job and inspected.
Operated machining equipment safely with team of operators.
Ensured safe working environment through adherence to safety guidelines and protocols for equipment operation.
Completed minor repairs and replacements of equipment parts to restore functionality.
Drove vehicles to and from work sites and maintained clean driving record.
Specialized Equipment Operator
Mountain F Interprises
01.2019 - 12.2021
Removed topsoil, vegetation, and rocks to grade earth to specifications.
Made necessary adjustments to machinery for optimum performance.
Employed bulldozers, loaders and backhoes for construction projects.
Used cranes and hoists to move large objects.
Transported materials and equipment to and from construction sites.
Pump Installer, Crane Operator
Star Pump
01.2016 - 12.2019
Reduced client downtime by promptly responding to service requests and accurately diagnosing issues.
Enhanced customer satisfaction with thorough post-installation inspections and adjustments as needed.
Increased job completion rates through effective coordination with other trades involved in the project.
Participated in ongoing professional development opportunities to stay up-to-date on best practices for pump installation.
Conducted pre-installation site evaluations to identify potential challenges and develop appropriate solutions.
Collaborated with team members to complete complex installation projects on time and within budget.
Accurately estimated material needs for each project, minimizing waste while ensuring timely completion of installations.