Summary
Overview
Work History
Education
Skills
Certification
References
Timeline
Generic

Apolinar Basmayor

Edmonton,Alberta

Summary

Seeking new challenges and opportunities for advancement as a Journeyman Pipefitter/Steamfitter, Hydro Test Planner, and Test Package Builder within an organization involved in construction, development, and refining of raw oil materials from oil sands.

Overview

12
12
years of professional experience
1
1
Certification

Work History

Steamfitter/ Pipefitter

Chinook Power Plant Project
Swift Current, Saskatchewan
06.2018 - 09.2018

Steamfitter/ Pipefitter

JACOBS Industrial
Fort McMurray, Alberta
04.2018 - 05.2018

Steamfitter/ Pipefitter/ HydroTest Package Builder

KBR WABI LTD
Fort McMurray, Alberta
03.2016 - 12.2017

Steamfitter/ Pipefitter

DCM Group
Fort McMurray, Alberta
08.2015 - 11.2015

QC Lead Technician

Innovator Industrial Services
Fort McMurray, Alberta
04.2015 - 06.2015

Hydro Test QC Coordinator

SAIPEM Canada
Fort McMurray, Alberta
07.2013 - 03.2015

Hydro Test QC Coordinator

URRS Flint Services
Fort McMurray, Alberta
10.2012 - 07.2013

Steamfitter/ Pipefitter & Hydrotest QC Coordinator

Flint Energy Services
Fort McMurray, Alberta
03.2011 - 10.2012

Steamfitter/ Pipefitter

PCL Industrial Construction Inc.
Fort Saskatchewan, Alberta
02.2010 - 06.2010

Steamfitter/ Pipefitter

Coast Industrial Maintenance Machine, BERRY Y & V Industrial Constructing ULC
Fort McMurray, Alberta
05.2008 - 11.2008

Steamfitter/ Pipefitter/ Line Checker

LEDCOR Construction LTD
Fort McMurray, Alberta
07.2006 - 11.2006

Education

Undergraduate 2 Years in Mechanical Engineering -

Mindanao State University (MSU)
Marawi City Philippines

High School Diploma -

Christ The King Highschool
Maranding Lala, Lanao Del Norte Philippines

Skills

● Rigging/ Installation/ fit up of Large bore Ducting and Quadro Pus at Air Cooling Condensate at Chinook Power Plant, Swift Current Saskatchewan


● Doing QC/QA Advance Insulation, Dermattic Insulation and Hard cladding Insulation systems
Walkdown with Client


● Coordinate testing activities with hydro test QC and construction superintendents personnel


● Complete a full review of hydro/pneumatic /visual test package documentation prior to submitting to the client for pre-hydro approval

● Validate all punches are signed off, and all requirements of NDE are meet prior to release for testing


● Ensure cleanliness and reinstatement deficiencies have been completed and signed off post hydro


● Creating spreadsheets and check sheet templates for reporting purposes with the use of excel/ word/ outlook when requested by project management


● Ensuring that all hydro/visual /pneumatic testing activities have been captured and Logged daily in the Hydro Test Log, punches opened / closed in the Master Deficiency Log, Vessel Closure Log


● Coordinate QC visual inspections of pre/post hydro testing requirements, creating walk down packages
as required


● Verifying change management documents have been actioned and closed out in a timely manner for
every testing package


● Assist turnover department in populating final AB83’s and the final review process as required


● Line checking, System Walk down and doing Field Verification


● I have part of creating / building Hydro Test Packages, Pre Commissioning Turn over Package and Vessel Closure Packages


●I am an experienced pipefitter in layout, assemble, fabricate, maintaining and repair piping systems that carry, water, oil, steam and chemicals that use for heating, cooling and for processing


● Review blueprints, ISO drawings and site specifications to determine the type of materials to use, as per drawing details and bill of materials


● Making detailed sketches and Red Line drawings as per RFI requirements when called upon


● Install fabricated spools to its respective locations, using proper safety rigging technics


● Joint pipe section related to equipment , bolting / torque secure in position


● Proven team player during new construction / maintenance work while working shut down


● Fabricate and install race way for tubing support


● Bend and install tubing from instrument supplies lines to instrument panel

Certification

  • Leadership and Safety Excellence
  • CSTS-09 includes Generic WHMIS
  • OSSA Fall Protection
  • OSSA Regional Orientation program
  • RED SEAL Steamfitter/Pipefitter Certificate with Official Transcript
  • H2S Alive
  • OSSA Confined Space Entry/Monitor
  • WHMIS 2015.

References

1. Joseph Savoy
IDR Coordinator
KBR WABI LTD
Fort Hills Secondary Extraction Project
Phone no. 506-754-5203 

 2. Narish Mahay

HR Sr. Specialist

KBR WABI LTD

Fort Hills Secondary Extraction Project

Phone no.1- 587-537-4336
3. Roberto Narciso
Foreman
Ledcor Industrial
Chinook Power Plant, Swift Current Saskatchewan Project
Phone no. 780-695-0473

Timeline

Steamfitter/ Pipefitter

Chinook Power Plant Project
06.2018 - 09.2018

Steamfitter/ Pipefitter

JACOBS Industrial
04.2018 - 05.2018

Steamfitter/ Pipefitter/ HydroTest Package Builder

KBR WABI LTD
03.2016 - 12.2017

Steamfitter/ Pipefitter

DCM Group
08.2015 - 11.2015

QC Lead Technician

Innovator Industrial Services
04.2015 - 06.2015

Hydro Test QC Coordinator

SAIPEM Canada
07.2013 - 03.2015

Hydro Test QC Coordinator

URRS Flint Services
10.2012 - 07.2013

Steamfitter/ Pipefitter & Hydrotest QC Coordinator

Flint Energy Services
03.2011 - 10.2012

Steamfitter/ Pipefitter

PCL Industrial Construction Inc.
02.2010 - 06.2010

Steamfitter/ Pipefitter

Coast Industrial Maintenance Machine, BERRY Y & V Industrial Constructing ULC
05.2008 - 11.2008

Steamfitter/ Pipefitter/ Line Checker

LEDCOR Construction LTD
07.2006 - 11.2006

Undergraduate 2 Years in Mechanical Engineering -

Mindanao State University (MSU)

High School Diploma -

Christ The King Highschool
Apolinar Basmayor